Loading...
HomeMy WebLinkAbout820714_Plan of Action (POA)_20190820 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-714 County: Sampson Facility Name: SHW Sow Farm Burke Rd Farm Certified Operator Name: Mike Hope Operator Number: 988088 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 Spillway(Y or N): Y Level(inches): 28 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section Ill tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 8/21/2019 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action,and to the best of my knowledge and ability,the information is accurate and correct. SHW Farms Phone: 919 989-8878 Facility Owner/Manager(print) Date: 8/20/2019 Facility Owner/Manager(signature) , • • II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR.STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 1 line m= 2106.9 lb PAN 2. Structure ID: line m= lb PAN 3. Structure ID: line m= lb PAN 4. Structure ID: line m= lb PAN 5. Structure ID: line m= lb PAN 6. Structure ID: line m= lb PAN n. lines 1 +2+3+4+5+6= 2106.9 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o.tract# p. field.# q. crop r. acres s.remaining IRR-t.TOTAL PAN u.application window 2 PAN balance BALANCE FOR (lb/acre) FIELD(lbs.) column r x s 10347 P1,2,3 soybeans 23.42 100.00 2342.0 Jun-Sep 15 10347 1 coastal bermuda 10.25 75.00 768.8 Mar-Oct 10347 2 coastal bermuda 9.18 75.00 688.5 Mar-Oct 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v.Total PAN available for all fields(sum of column t) = 3799.3 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II)= 2106.9 lb. PAN PoA(30 Day)2/21/00 • • • x. Crop's remaining PAN balance(line v from section III)= 3799.3 lb. PAN y. Overall PAN balance(w-x)= -1692 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump& haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Irrigation onto existing spray fields will continue as weather and field conditions permit.Estimated PAN available for bermuda. PoA(30 Day)2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): 1 2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard a. current liquid level according to marker 28.0 inches b. designed 25 yr./24 hr. storm &structural freeboard 32.5 inches c. line b-line a (inches in red zone) = 4.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 124551.6 ft2 e. line c/12 x line d x 7.48 gallons/ft3 349367 gallons 3. Projected volume of waste liquid produced during draw down period f: temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 277219 ft3 h. current herd# 1600 certified herd#1 1600 actual waste produced = current herd# x line g = 277219 ft3 certified herd# i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 105280 ft3 k: (lines h + i +j)x 7.48 x 30 days/line f= 476849 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/8/2019 2.55 lbs/1000 gal. m. ((lines e+ k)/1000)x line I = 2106.9 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the nextStructure tab shown below) PoA(30 Day)2/21/00