Loading...
HomeMy WebLinkAbout20202014 Ver 1_Meeting Request Review_20201221ID#* 20202014 Version* 1 Regional Office* Wilmington Regional Office - (910) 796-7215 Reviewer List* Holley Snider Pre -Filing Meeting Request submitted 12/21/2020 .......................................................................................................................................................................................................................................................... Contact Name * Allyn Teilborg Contact Email Address* oldferrymarina@gmail.com Project Name* Old Ferry Marina Revision 2020 Project Owner* Project County* Owner Address: Old Ferry Marina Inc. Onslow Street Address 150 Old Ferry Road Address Line 2 aty Sneads Ferry Rbstal / Zip Code 28460 Is this a transportation project?* r Yes r No State / Frovince / Region NC Country USA Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit W Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Brad Connell Please give a brief project description below. Adjust Existing Dock Usage to Better Serve Dry Dock Customers Please give a couple of dates you are available for a meeting. 12/23/2020 12/24/2020 12/30/2020 1 /5/2021 Please attach the documentation you would like to have the meeting about. Project Narrative.pdf 97.09KB pdr only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 12/21/2020 Reviewer Meeting Request Decision Has a meeting been scheduled?* (-- Yes C No Project Narrative Old Ferry Marina Revision 2020 November 3, 2020 To accommodate; Dry Dock Boat Launch and Retrieval, Late Arrivals and Early Departures. A — Double length of current drop in dock, from 25' to 50'. Double length of retrieval dock from 75' to 150', (widen to 8', for social distancing). B - Relocate 3 slips by adding 50' slip and 2 — 25' slips. This allows 3 previous locations to be dedicated to dry dock; For late arrivals after closing time, and early departing fisherman before we open at 8:00. Therefore this would be slip count neutral. C — Add two handicap access finger piers for short term access of dry dock customers only. All of the above would be built with pilings, wooden cross beams and decking boards at heights the same as current docks they would attach to. All are intended to facilitate dry dock storage operation. The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. The project proponent hereby requests that the cerifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.