Loading...
HomeMy WebLinkAbout820699_Sludge Survey (Testing Dates)_20200127 ti s1AT a , REGEIV r CZED RIMY COOPER a #11.,tikal Governor J 4 8 DE D /R � `�?MICHAEL S.REGAN '` 0S +,*c a -. JHN 220 2 ecretary s = LINDA CULPEPPER NORTH CAROLINA. Director Environmental Quality WQROS RAYiEOCLE�'c 'i;UNN orncE January 27, 2020 James.B Best TDM 30 (Best Bros.) 439 J B Wilson Rd Newton Grove,NC 28366 Subject:.Sludge Survey.Testing Dates Certificate of Coverage No: AWS820699 TDM 30 (Best Bros.), Animal Waste Management System Sampson County. . Dear.James B Best:' The Division of Water Resources (Division)received your sludge survey information on January 13, 2020. With the survey results, you requested an extension of the sludge survey requirement for Lagoon#1 at the TDM 30 (Best Bros:) facility. Due to the amount of treatment volume available, and the rate of sludge accumulation for the lagoon, the Division agrees that a sludge survey is not needed until December 31,.2024, The next sludge survey.for Lagoon#1 at TDM 30 (Best Bros.) should be performed before December 31,2024. Please retain this letter and keep it with your farm records for reference. Please call me at(919)707-3705 if you have any questions: Sincerely, X Heath C. Robinson Animal Feeding Operations Program cc: ( Fayetteville Regional Office,Water Quality Regional Operations Section Permit File AWS820699 D E Q- j North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11636 Mail Service Center 1 Raleigh,North Carolina 27699-1636 NORTH CAtgl MA. 0.1.thedm[ n.madriaar .919.707.9000 Sludge Survey Evaluation Form. Today's efiN/ .O .o Facility# -820699 Owner: 3t3 Lagoon ID'. . Lagoon 1 . Sludge Survey Received: 1/3/2020 Sludge Survey Performed: 1222/2019 Sludge Depth(Row 0):(ft) Existing Treatment Depth(Row P)'.(ft) Start Date: . .: _ 10/t14/1997 Date of previous Sludge Survey 12/26/2014 Previous Sludge Depth:(ft) Previous Treatment Depth:(ft) Time Since Previous Sludge Survey:(yrs) 5 Requested Extension:(yr) Requested Due Date: 12/31/2024 Rate of Sludge Accumulation:(ft/yr) 0.10 • Sludge Accumulation During Extenson Period:(ft) 0.50 Treatment Depth Available After Extension:(ft) 5.50 Sludge Level Okay?.. . YES, Ratio Estimates Based on Depth EXISTING EXEMPTION Ratio of Sludge Layer to Total Treatment Depth 0.29 0:35 Ratio of Sludge Depth Okay? YES EXISTING EXEMPTION Average Sludge Layer Thickness(T) 2.40 2.90 Depth of lagoon from top of bank to bottom soil surface(D) NA Slope=Horizontal/Vertical Side Slope(S) NA Length at the Top of the Inside Bank(L) IJ1 NA Width at the Top Inside Slope(W) NA Thickness of Existing Liquid Treatment Zone(Y) 6.00 : 5.50 Length at Midpoint of Sludge.Layer(Lm)=L-2S(D-(T/2)) #VALUE! #VALUE! Width at Midpoint of Sludge Layer(Wm)=W-2S(D-(T/2)) _ #VALUE! . #VALUE! Volume of Sludge(Vs)=L-m*Wm*T =-- --, =. - #VALUE! #VALUE! Volume of Sludge in Gallons(Vsg)=Vs*7.481 #VALUE! .. #VALUE_ Thickness of Total Treatment Zone(Z)=T+Y 8.40 8:40 Length at Midpoint of Total Treatment Zone'(Lz)=L-2(S)(D-(Z/2)) #VALUE! #VALUE!. Width at Midpoint of Total Treatment Zone(Wz)=W-2(S)(D-(Z/2)) #VALUE! #VALUE! Volume of Total Treatment Zone(Vz)=Lz*Wz*Z #VALUE!. #VALUE! Ratio(R)of Sludge Layer Volume to Total Treatment Volume #VALUE! . #VALUE! Sludge Volume Ratio Okay? #VALUEI Maximum Extension Until End of Permit.Cycle Next Survey to.be Done:.(Calendar Year) 12/1/20i24 Notification Letter Mailed: a o