Loading...
HomeMy WebLinkAbout20201838 Ver 1_Pre-Filing Meeting Request_20201202 tie R•.'. DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnWmnnacnlrtl Qua fay ID#* 20201838 Version* 1 Regional Office* Mooresville Regional Office-(704)663-1699 Reviewer List* Donna Hood Pre-Filing Meeting Request submitted 12/2/2020 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Tina Sekula Contact Email Address* tsekula@jmt.com Project Name* Tory Path Road At Grade Rail Closure Project Owner* NCDOT Rail Division (Anamika Laad) Project County* Union Owner Address: Street Address 1 South Wilmington Street Address Line 2 1553 Mail Service Center City State/Bovine/Region Raleigh NC Fbstal/Zip Code Country 27699 United States Is this a transportation project?* ( Yes r No Type(s)of approval sought from the DWR: fJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification I— Shoreline Stabilization Does this project have an existing project ID#?* (' Yes r No Please list all existing project ID's associated with this projects.* WBS#80000.2.1.20 Do you know the name of the staff member you would like to request a meeting with? Donna Hood usually handles NCDOT projects. Please give a brief project description below.* The project proposes to close the existing grade crossing at Tory Path Road and connect Tory Path Road to Helms Road with a new extension on a new alignment.The proposed rail crossing closure at Tory Path Road is referred to as Phase I of the P-5748 Helms Road grade separation STIP project.The grade crossing at Helms Road will remain open with a reconfiguration of the crossing until the completion of Phase 2. Please give a couple of dates you are available for a meeting. 1/12/2021 1/19/2021 1/20/2021 1/27/2021 2/2/2021 Please attach the documentation you would like to have the meeting about. Final NRTR F-14288 Tory Path Road.pdf 9MB Project Submittal Interim Form.pdf 53.86KB SAW-2019-01336 F 14288 PJD SIGNED(1).pdf 1.17MB Tory Path Road Project Data Sheet.pdf 163.74KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature Submittal Date 12/2/2020