Loading...
HomeMy WebLinkAbout820647_Plan of Action (POA)_20200622 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number. 82-647 County: Sampson Facility Name: 3731 AWA Certified Operator Name: Wayne Sanderson Operator Number: 17903 1. Current liquid level(s)in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid'level in the lagoon to the_bottom of the spillway for lagoons with,spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 3731 Spillway(Y or N): N Level(inches): 19.5 2. Check all applicable items Liquid level is within the.designed structural freeboard elevations of one or more structures. Five and 30.day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges- ` X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable:range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section 1.11 tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered"in the facility's.CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the-receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit ' I hereby certify that I have reviewed the information listed above and included within the attached.Plan of Action,and to the best of my knowledge and ability,the-information is accurate and correct. Murphy Brown, LLC Phone: 910-293-3434 Facili per an el/Tint) � Date: 6/22/2020 Facility Owner/Manager(signature) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND1OR 25 Y HR.STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 3731 line m= 342.7 2. Structure ID: line m= • 3. Structure ID: line m= 4. Structure ID: line m= 5. Structure ID:. line m= 6. Structure ID: line m= n. linesI +2+3+4+5+6= 342.7 III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAY PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 o.tract# p.field# q. crop r.acres s.remaining IRR-t.TOTAL PAN 2 PAN balance BALANCE FOR (lb/acre) FIELD(Ibs.) column r x s 2312 8 Corn 9.87 74.99 740.2 Sub 8 Corn 9.91 124.76 1236.4 1State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v.Total PAN available for all fields(sum of column t)= 1976.5 IV.FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied(line n from section II)= 342.7 PoA(30 Day)2/21/00 x. Crop's remaining PAN balance(line v from section III)= 1976.5 y. Overall PAN balance(w-x)= -1634 Line y must show as a deficit. If line y does not show as a deficit, list course of action here iincl haul,depopulation, herd reduction, etc. For pump&haul and herd reduction options, recalcule on new information. If new fields are to be included as an option for lowering lagoon level,add PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to facility; provide information regarding the herd population and lagoon freeboard levels at the re NARRATIVE: Irrigation onto existing spray fields will continue as weather and field conditions permit Additior for pumping if needed. • • PoA(30 Day)2/21/00 PLAN OF ACTION(PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): 3731 2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard a. current liquid level according to marker 19.5 b. designed 25 yr./24 hr.storm &structural freeboard 19.0 c. line b-line a(inches in red zone)= -1 d. top of dike surface area according to design (area at below structural freeboard elevation) 157136 e. line c/12 x line d x 7.48 gallons/ft3 -48974 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 g. volume of waste produced according to structural design 211483 h. current herd# 2000 certified herd# 2000 actual waste produced = current herd# x line g = 211483 certified herd# i. volume of wash water according to structural design 0 j. excess rainfall over evaporation according to design 94719 k. (lines h+i +j)x 7.48 x 30 days/line f= 381732 4. Total PAN to be land applied during draw down period I. current waste analysis dated 6/11/2020 1.03 m. ((lines e+k)/1000)x line I= . 342.7 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA(30 Day)2/21/00 II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 1 line I= 19316 gallons 2. structure ID: 2 line I = 34658 gallons 3. structure ID: 3 line I = 413294 gallons 4. structure ID: 4A ' line I = 92719 gallons 5. structure ID: line I = gallons 6. structure ID: line I = gallons • n. lines 1 + 2 +3 +4+5+ 6= 559987 gallons o. line n/27154= 20.62 acre-inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD" 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are • not considered available to receive waste. p. tract# q. field# r. soil type s. crop t. acres u.remaining v.maximum w.maximum IRR-2 PAN application rate application balance (in/hr) amount(inches) (lb/acre) 4625 P5 Norfolk millet 26.40 181 0.5 1 4621 P6 Wagram millet 23.30 190 0.6 1 4621 P7 Wagram millet 29.96 190 0.6 1 4621 SS Wagram coastal bermuda 5.66 260 0.6 1 x.total acres available during 5 day draw down (sum of column t)= 85.32 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE line o = 0.24 inches per acre to be applied within 5 days PoA(t.Day)2/2 i/u0 line x If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul,depopulation, herd reduction, etc. For pump&haul and herd reduction options, recalculate new hydraulic load based on new information. WARREN SWINE FARMS KING FARM 82-13 Plan to land apply hydraulic load: 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar down in field; "trafficability"across soils; will soils absorb application without runoff, etc.) Wet. Concerned with pivot movement so aerway will be used on sandiest portions of the farm, first. 2. Date and amount of last rainfall event? DATE: 06/20/20 AMOUNT: 0.20 inches 3. Dates of last waste application event per field: 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in line"n"at appropriate seasonal (i.e. winter) application rates within 5 days? yes 5. Irrigation schedule for next 5 days-include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposed changes in application rates and amounts; and any other information for consideration. Irrigate with pivot and solid set as field conditions improve. Aerway will be used as well. Extra land available, if needed , to be used with aerway. PoA(5 Day)2/21/00