HomeMy WebLinkAboutNC0026689_Pretreatment Compliance Inspection Form_20201231N'r-10 NORTH CAROLINA DIVISION OF WATER RESOURCES
PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT
Water Resources
ENVIRONMENTAL. QUALITY
BACKGROUND INFORMATION [Complete Prior To PCI; Review Program Info Database Sheet(s)]
1. Control Authority (POTW) Name: Town of Denton
2. Control Authority Representative(s): Troy Branch
3. Title(s): Pretreatment Coordinator/WWTP ORC
4. Last Inspection Date: 11/20/19 Inspection Type (Check One): ® PCI ❑ Audit
5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ® YES ❑ NO
6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO
Order Type, Number, Parameters:
1 CAN [Aral hi 1 \r-fid
Main Program Permit Number MM/DD/YY
I N I C 1 0 10 1 216 161819 1 112 117 1 20
Are Milestone Dates Being Met? ❑ YES ❑ NO
7. Current Number Of Significant Industrial Users (SIUs)?
I 1
8. Number of SIUs With No IUP, or With an Expired IUP?
0
9. Number of SIUs Not Inspected By POTW in the Last Calendar Year?
1 0
10. Number of SIUs Not Sampled By POTW in the Last Calendar Year?
0
11. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods?
0
12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods?
0
13. Number of SIUs in SNC with Pretreatment Schedule?
0
14. Number of SIUs on Schedules?
0
15. Current Number Of Categorical Industrial Users (CIUs)?
0
16. Number of CIUs in SNC?
0
POTW INTERVIEW
17. Since the Last PCI, has the POTW had any NPDES Limits Violations?
If Yes, What are the Parameters and How are these Problems Being Addressed?
The POTW has likely identified the source of the exceedance and is making
upgrades to correct the problem.
18. Since the Last PCI, has the POTW had any Problems Related to an Industrial
Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased
Sludge Production, Etc.)?
If Yes, How are these Problems Being Addressed?
19. Which Industries have been in SNC for Limits or Reporting during either SNC for
of the Last 2 Semi -Annual Periods? Not Been Published for Public SNC for
Notice?(May refer to PAR if Excessive SIUs in SNC) Not Pul
20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order,
Has a Signed Copy of the Order been sent to the Division?
21. Are Any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which
Ones?
®YES El NO
Dichlorobromomethane
exceedance in 12/19, 3/20, 7/20
El YES ®NO
Limits: Stratford Metals, Clarios, Suiza
Reporting: None
lished: None
None
® YES ❑ NO
LM-2020-0035, LV-2020-0261,
LV-2020-0262
LTMP/STMP FILE REVIEW:
22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO
23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO
24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ❑ YES ® NO Is Table Adequate? ❑ YES ❑ NO
25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ❑ YES ® NO Division Inspector, please verify.
26. If NO to 23 - 26, list violations Not listed on July 2020 DMR. Revised DMR submitted with data
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 1
27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO
If yes, which ones? Eliminated:
Added:
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 2
28. PRETREATMENT PROGRAM ELEMENTS REVIEW— Please review POTW files, verify POTW has copy of Program Element in their
files, complete with supporting documents and copy of PERCS Approval Letter, and dates consistent with Program Info:
Program Element
Last Submittal
Date In file?
Last Approval
Date In file
Date Next Due,
If Applicable
Headworks Analysis (HWA)
09/07/2016
® Yes ❑ No
11/10/2016
® Yes ❑ No
09/01/2021
Industrial Waste Survey (IWS)
05/11/2020
® Yes ❑ No
08/05/2020
® Yes ❑ No
03/21/2025
Sewer Use Ordinance (SUO)
01/04/2013
® Yes ❑ No
01/18/2013
® Yes ❑ No
Enforcement Response Plan (ERP)
12/31/2019
® Yes ❑ No
03/17/2020
® Yes ❑ No
Short Term Monitoring Plan (STMP)
08/09/2017
® Yes ❑ No
10/24/2017
® Yes ❑ No
INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION)
29. User Name
1. Century Hosiery, Inc. IF 2.
3.
30. IUP Number
0001
31. Does File Contain Current Permit?
® Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
32. Permit Expiration Date
12/31/2025
33. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A
----
34. Does File Contain Permit Application Completed Within One Year Prior to
® Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
Permit Issue Date?
35. Does File Contain an Inspection Completed Within Last Calendar Year?
® Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
36. a. Does the File Contain a Slug/Spill Control Plan?
a. ®Yes ❑No
a. ❑Yes ❑No
a. ❑Yes ❑No
b. If No, is One Needed? (See Inspection Form from POTW)
b. ❑Yes ❑No
b. ❑Yes ❑No
b. ❑Yes ❑No
37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic
❑Yes❑NoON/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
Organic Management Plan (TOMP)?
38. a. Does File Contain Original Permit Review Letter from the Division?
a. ®Yes ❑No
a. ❑Yes ❑No
a. ❑Yes ❑No
b. All Issues Resolved?
b.❑Yes❑No®N/A
b.❑Yes❑No❑N/A
b.❑Yes❑No❑N/A
39. During the Most Recent Semi -Annual Period, Did the POTW Complete its
®Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
Sampling as Required by IUP, including flow?
40. Does File Contain POTW Sampling Chain -Of -Custody Forms?
® Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
41. During the Most Recent Semi -Annual Period, Did the SIU Complete its
❑Yes❑NoON/A
❑Yes❑No❑N; A
❑Yes❑No❑N/A
Sampling as Required by IUP, including flow?
POTW conducts
sampling
41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports
®Yes❑No❑N/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
on time?
42a. For categorical IUs with Combined Wastestream Formula (CWF), does file
❑Yes❑No®N/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
include process/dilution flows as Required by IUP?
42b. For categorical IUs with Production based limits, does file include
❑Yes❑No®N/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
production rates and/or flows as Required by IUP?
43a. During the Most Recent Semi -Annual Period, Did the POTW Identify All
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
Limits Non -Compliance from Both POTW and SIU Sampling?
None
43b. During the Most Recent Semi -Annual Period, Did the POTW Identify All
❑Yes❑NoON/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
Reporting_Non-Compliance from SIU Sampling?
44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self-
a.❑Yes❑No®N/A
a.❑Yes❑No❑N/A
a.❑Yes❑No❑N/A
Monitoring Violations?
b. Did Industry Resample and submit results to POTW Within 30 Days?
b.❑Yes❑No®N/A
b.❑Yes❑No❑N/A
b.❑Yes❑No❑N/A
c. If applicable, Did POTW resample within 30 days of becoming aware of
c.❑yes❑No®N/A
e.❑Yes❑No❑N/A
e.❑Yes❑No❑N/A
SIU limit violations in the POTW's sampling of the SIU?
46. During the Most Recent Semi -Annual Period, Was the SIU in SNC?
❑
Yes
®
No
❑
Yes
❑
No
❑
Yes
❑
No
47. During the Most Recent Semi -Annual Period, Was Enforcement Taken as
❑Yes❑No®N/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)?
48. Does the File Contain Penalty Assessment Notices?
❑Yes❑No®N/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
49. Does The File Contain Proof Of Penalty Collection?
❑Yes❑No®N/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
50. a. Does the File Contain Any Current Enforcement Orders?
a.❑Yes❑No®N/A
a.❑Yes❑No❑N/A
a.❑Yes❑No❑N/A
b. Is SIU in Compliance with Order?
b.❑Yes❑No®N/A
b.❑Yes❑No❑N/A
b.❑Yes❑No❑N/A
51. Did the POTW Representative Have Difficulty in Obtaining Any of This
Yes ® No
ElYes ElNo
El Yes El No
Requested Information For You?
E
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 3
FILE REVIEW COMMENTS:
The files were complete and well organized.
INDUSTRY INSPECTION ICIS CODING:
Main Program Permit Number MMIDDIYY
1. Industry Inspected:
2. Industry Address:_
3. Type of Industry/Product:
4. Industry Contact:
Phone
Fax:
Title:
5. Does the POTW Use the Division Model Inspection Form or Equivalent? ❑ YES ❑ NO
6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly?
Comments:
A.
Initial Interview
❑ YES ❑ NO
B.
Plant Tour
❑ YES ❑ NO
C.
Pretreatment Tour
❑ YES ❑ NO
D.
Sampling Review
❑ YES ❑ NO
E.
Exit Interview
❑ YES ❑ NO
Industrial Inspection
Comments:
OVERALL SUMMARY AND COMMENTS:
Comments: A very well run program.
Requirements:
Recommendations:
NOD: ❑ YES ®NO
NOV: ❑ YES ® NO
QNCR: ❑ YES ® NO
POTW Rating:
Satisfactory X Marginal Unsatisfactory
PCI COMPLETED BY: Jim Gonsiewski DATE: 12/31/2020
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 4
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 IS I 3 I NCO026689 I11 121 20/12/17 I17 18 n 19 L G j 201
21111111111111111111111111111111111111111111 f6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 CA ---------------------- Reserved -------------------
67
70 �s LJ � 71 I tyI 72 L Ln, � 73LLI74 71
J 1 1 1 1 L L j80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
10:10AM 20/12/17
16/08/01
Denton WWTP
300 Council Access Rd
Exit Time/Date
Permit Expiration Date
Denton NC 27239
11:15AM 20/12/17
21/02/28
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
///
Troy B Branch/ORC/336-859-4460/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Kenneth W Gamble,PO Box 306 Denton NC 272390306/Town Manager/336-859-4231/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Records/Reports 0 Pretreatment
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Jim J Gonsiewski DocuSigned by: DWR/Division of Water Qua lity/336-776-9704/ 12/31/2020
Alex Lowe"°°'°�� DWR/WSRO WQ/336-776-9689/
E197B66F179D45F...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
DocuSigned by:
v & k}&& for Lon snider 12/31/2020
LN
�— 5548B6co265c47A...
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type (Cont.)
31 NCO026689 I11 12I 20/12/17 117 18 1 p l
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
On December 17, 2020 a Pretreatment Compliance Inspection (PCI) was performed by Jim
Gonsiewski and Alex Lowe of the Winston-Salem Regional Office. Mr. Troy Branch was present for the
inspection. The purpose of this inspection was to determine the effectiveness of the Town's
pretreatment program, which includes reviewing the files, POTW plant performance, industry
monitoring data, and adherence to the enforcement response plan (ERP).
The pretreatment program at the facility is compliant and very well run. There were NPDES limit
exceedances for dichlorobromomethane in December 2019, March 2020, and July 2020. The POTW
has been working on a solution to eliminate these exceedances.
Page#
Permit: NC0026689
Inspection Date: 12/17/2020
Owner - Facility: Denton VWVfP
Inspection Type: Pretreatment Compliance
Yes No NA NE
Page#