Loading...
HomeMy WebLinkAboutNC0026689_Pretreatment Compliance Inspection Form_20201231N'r-10 NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT Water Resources ENVIRONMENTAL. QUALITY BACKGROUND INFORMATION [Complete Prior To PCI; Review Program Info Database Sheet(s)] 1. Control Authority (POTW) Name: Town of Denton 2. Control Authority Representative(s): Troy Branch 3. Title(s): Pretreatment Coordinator/WWTP ORC 4. Last Inspection Date: 11/20/19 Inspection Type (Check One): ® PCI ❑ Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ® YES ❑ NO 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO Order Type, Number, Parameters: 1 CAN [Aral hi 1 \r-fid Main Program Permit Number MM/DD/YY I N I C 1 0 10 1 216 161819 1 112 117 1 20 Are Milestone Dates Being Met? ❑ YES ❑ NO 7. Current Number Of Significant Industrial Users (SIUs)? I 1 8. Number of SIUs With No IUP, or With an Expired IUP? 0 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 1 0 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0 11. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods? 0 12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods? 0 13. Number of SIUs in SNC with Pretreatment Schedule? 0 14. Number of SIUs on Schedules? 0 15. Current Number Of Categorical Industrial Users (CIUs)? 0 16. Number of CIUs in SNC? 0 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? The POTW has likely identified the source of the exceedance and is making upgrades to correct the problem. 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during either SNC for of the Last 2 Semi -Annual Periods? Not Been Published for Public SNC for Notice?(May refer to PAR if Excessive SIUs in SNC) Not Pul 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? 21. Are Any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? ®YES El NO Dichlorobromomethane exceedance in 12/19, 3/20, 7/20 El YES ®NO Limits: Stratford Metals, Clarios, Suiza Reporting: None lished: None None ® YES ❑ NO LM-2020-0035, LV-2020-0261, LV-2020-0262 LTMP/STMP FILE REVIEW: 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO 23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO 24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ❑ YES ® NO Is Table Adequate? ❑ YES ❑ NO 25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ❑ YES ® NO Division Inspector, please verify. 26. If NO to 23 - 26, list violations Not listed on July 2020 DMR. Revised DMR submitted with data NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 1 27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO If yes, which ones? Eliminated: Added: NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 2 28. PRETREATMENT PROGRAM ELEMENTS REVIEW— Please review POTW files, verify POTW has copy of Program Element in their files, complete with supporting documents and copy of PERCS Approval Letter, and dates consistent with Program Info: Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) 09/07/2016 ® Yes ❑ No 11/10/2016 ® Yes ❑ No 09/01/2021 Industrial Waste Survey (IWS) 05/11/2020 ® Yes ❑ No 08/05/2020 ® Yes ❑ No 03/21/2025 Sewer Use Ordinance (SUO) 01/04/2013 ® Yes ❑ No 01/18/2013 ® Yes ❑ No Enforcement Response Plan (ERP) 12/31/2019 ® Yes ❑ No 03/17/2020 ® Yes ❑ No Short Term Monitoring Plan (STMP) 08/09/2017 ® Yes ❑ No 10/24/2017 ® Yes ❑ No INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION) 29. User Name 1. Century Hosiery, Inc. IF 2. 3. 30. IUP Number 0001 31. Does File Contain Current Permit? ® Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 32. Permit Expiration Date 12/31/2025 33. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A ---- 34. Does File Contain Permit Application Completed Within One Year Prior to ® Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Permit Issue Date? 35. Does File Contain an Inspection Completed Within Last Calendar Year? ® Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 36. a. Does the File Contain a Slug/Spill Control Plan? a. ®Yes ❑No a. ❑Yes ❑No a. ❑Yes ❑No b. If No, is One Needed? (See Inspection Form from POTW) b. ❑Yes ❑No b. ❑Yes ❑No b. ❑Yes ❑No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic ❑Yes❑NoON/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A Organic Management Plan (TOMP)? 38. a. Does File Contain Original Permit Review Letter from the Division? a. ®Yes ❑No a. ❑Yes ❑No a. ❑Yes ❑No b. All Issues Resolved? b.❑Yes❑No®N/A b.❑Yes❑No❑N/A b.❑Yes❑No❑N/A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete its ®Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Sampling as Required by IUP, including flow? 40. Does File Contain POTW Sampling Chain -Of -Custody Forms? ® Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 41. During the Most Recent Semi -Annual Period, Did the SIU Complete its ❑Yes❑NoON/A ❑Yes❑No❑N; A ❑Yes❑No❑N/A Sampling as Required by IUP, including flow? POTW conducts sampling 41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports ®Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A on time? 42a. For categorical IUs with Combined Wastestream Formula (CWF), does file ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A include process/dilution flows as Required by IUP? 42b. For categorical IUs with Production based limits, does file include ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A production rates and/or flows as Required by IUP? 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify All ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Limits Non -Compliance from Both POTW and SIU Sampling? None 43b. During the Most Recent Semi -Annual Period, Did the POTW Identify All ❑Yes❑NoON/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A Reporting_Non-Compliance from SIU Sampling? 44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- a.❑Yes❑No®N/A a.❑Yes❑No❑N/A a.❑Yes❑No❑N/A Monitoring Violations? b. Did Industry Resample and submit results to POTW Within 30 Days? b.❑Yes❑No®N/A b.❑Yes❑No❑N/A b.❑Yes❑No❑N/A c. If applicable, Did POTW resample within 30 days of becoming aware of c.❑yes❑No®N/A e.❑Yes❑No❑N/A e.❑Yes❑No❑N/A SIU limit violations in the POTW's sampling of the SIU? 46. During the Most Recent Semi -Annual Period, Was the SIU in SNC? ❑ Yes ® No ❑ Yes ❑ No ❑ Yes ❑ No 47. During the Most Recent Semi -Annual Period, Was Enforcement Taken as ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)? 48. Does the File Contain Penalty Assessment Notices? ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 49. Does The File Contain Proof Of Penalty Collection? ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 50. a. Does the File Contain Any Current Enforcement Orders? a.❑Yes❑No®N/A a.❑Yes❑No❑N/A a.❑Yes❑No❑N/A b. Is SIU in Compliance with Order? b.❑Yes❑No®N/A b.❑Yes❑No❑N/A b.❑Yes❑No❑N/A 51. Did the POTW Representative Have Difficulty in Obtaining Any of This Yes ® No ElYes ElNo El Yes El No Requested Information For You? E NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 3 FILE REVIEW COMMENTS: The files were complete and well organized. INDUSTRY INSPECTION ICIS CODING: Main Program Permit Number MMIDDIYY 1. Industry Inspected: 2. Industry Address:_ 3. Type of Industry/Product: 4. Industry Contact: Phone Fax: Title: 5. Does the POTW Use the Division Model Inspection Form or Equivalent? ❑ YES ❑ NO 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ❑ YES ❑ NO B. Plant Tour ❑ YES ❑ NO C. Pretreatment Tour ❑ YES ❑ NO D. Sampling Review ❑ YES ❑ NO E. Exit Interview ❑ YES ❑ NO Industrial Inspection Comments: OVERALL SUMMARY AND COMMENTS: Comments: A very well run program. Requirements: Recommendations: NOD: ❑ YES ®NO NOV: ❑ YES ® NO QNCR: ❑ YES ® NO POTW Rating: Satisfactory X Marginal Unsatisfactory PCI COMPLETED BY: Jim Gonsiewski DATE: 12/31/2020 NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 4 United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 IS I 3 I NCO026689 I11 121 20/12/17 I17 18 n 19 L G j 201 21111111111111111111111111111111111111111111 f6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 CA ---------------------- Reserved ------------------- 67 70 �s LJ � 71 I tyI 72 L Ln, � 73LLI74 71 J 1 1 1 1 L L j80 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 10:10AM 20/12/17 16/08/01 Denton WWTP 300 Council Access Rd Exit Time/Date Permit Expiration Date Denton NC 27239 11:15AM 20/12/17 21/02/28 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data /// Troy B Branch/ORC/336-859-4460/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Kenneth W Gamble,PO Box 306 Denton NC 272390306/Town Manager/336-859-4231/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Records/Reports 0 Pretreatment Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Jim J Gonsiewski DocuSigned by: DWR/Division of Water Qua lity/336-776-9704/ 12/31/2020 Alex Lowe"°°'°�� DWR/WSRO WQ/336-776-9689/ E197B66F179D45F... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date DocuSigned by: v & k}&& for Lon snider 12/31/2020 LN �— 5548B6co265c47A... EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type (Cont.) 31 NCO026689 I11 12I 20/12/17 117 18 1 p l Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) On December 17, 2020 a Pretreatment Compliance Inspection (PCI) was performed by Jim Gonsiewski and Alex Lowe of the Winston-Salem Regional Office. Mr. Troy Branch was present for the inspection. The purpose of this inspection was to determine the effectiveness of the Town's pretreatment program, which includes reviewing the files, POTW plant performance, industry monitoring data, and adherence to the enforcement response plan (ERP). The pretreatment program at the facility is compliant and very well run. There were NPDES limit exceedances for dichlorobromomethane in December 2019, March 2020, and July 2020. The POTW has been working on a solution to eliminate these exceedances. Page# Permit: NC0026689 Inspection Date: 12/17/2020 Owner - Facility: Denton VWVfP Inspection Type: Pretreatment Compliance Yes No NA NE Page#