HomeMy WebLinkAbout20171045 Ver 1_Notice of Initial Credit Release_20201113Strickland, Bev
From: Browning, Kimberly D CIV USARMY CESAW (USA)
<Kimberly.D.Browning@usace.army.mil>
Sent: Friday, November 13, 2020 2:28 PM
To: Tugwell, Todd J CIV USARMY CESAW (US); Haywood, Casey M CIV (USA); Davis, Erin B;
Wilson, Travis W.; Leslie, Andrea J; Bowers, Todd; Hamstead, Byron A
Cc: Reid, Matthew; Aaron Earley; Shawn Wilkerson; Allen, Melonie; Wiesner, Paul; Harmon,
Beth; Stanfill, Jim; McLendon, C S CIV USARMY CESAW (USA); Smith, Ronnie D CIV
USARMY CESAW (USA)
Subject: [External] Notice of Initial Credit Release/ NCDMS Key Mill Mitigation Site/ Surry Co./
SAW-2017-01504
Attachments: Key Mill_100025_STR_YD 101_Initial Release.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Good afternoon,
The 15-Day Record Drawing review for the Key Mill Mitigation Site (SAW-2017-01504) ended November 11, 2020. Per
Section 332.8(o)(9) of the 2008 Mitigation Rule, this review followed the streamlined review process. All comments
received from the NCIRT are incorporated in this email. Please address IRT concerns in the MY1 Report. There were no
objections to issuing the initial credit release. Please find attached the current signed ledger.
DWR comments, Erin Davis:
1. In the IRT mitigation plan review, Mac echoed DMS' comment regarding the usage of log sills on steeper gradient
tributaries with consideration for long term channel stability. WEI's response was to revise construction plans to
incorporate more boulder sills. Given the high number of substitutions back to log sills, DWR's concern still stands. These
areas should be closely inspected during monitoring for signs of instability.
2. DWR is ok with the planted material species and quantity substitutions, except for green ash. If green ash
dominated areas establish during monitoring (based on plot data and site visit observations), DWR may request
supplemental planting based on long term canopy closure concerns due to the emerald ash borer.
3. DWR does not believe the change in planted area warrants a reduction in ratio of credits. However, if construction
equipment used for the restoration reach entered the forested buffer, then the area should be monitored for signs of
woody vegetation stress/death and supplemental planted as necessary.
4. There appears to be multiple riprap swales/outlets shown on the record drawings but not the approved mitigation
plan design drawings: Sheet 1.6— BMP outlet near 155+00 and floodplain riprap near 155+75, Sheet 1.7—vernal
pool/BMP outlet near 159+75, and Sheet 1.9 — outlet near 165+75. Please call these areas out on future redline
drawings and provide a justification for the hardening measure in the baseline report.
Please contact the mitigation office if you have questions.
Have a good weekend,
Kim
Kim Browning
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers
Mitigation Project Name
Key Mill Site
DMS ID
100025
River Basin
Yadkin
Cataloging Unit
03040101
County
Surry
USACE Action ID 2017-01504
DWR Permit 2017-1045
Date Project Instituted 5/25/2017
Stream/Wet. Service Yadkin 03040101
Date Printed 30/9/2020
BROWNING.KIMBERLY.DANIELLE.1527683510 Digitally signed by BROWN ING.KIMBERLY.DANIELLE.1527683510
Date: 2020.11.13 14:06:35-05'00'
Signature of Official Approving Credit Release
1 - For NCDMS, no credits are released during the first milestone
2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and
posted to the NCDMS Portal, provided the following criteria have been met:
1) Approved of Final Mitigation Plan
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property.
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan.
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankfull event performance standard has been met.
Credit Release Milestone
Cool Stream Credits
Project Credits
Scheduled
Releases%
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
#Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
1,832.190
1,832.190
0.000
1,832.190
2020
10/9/2020
3 - Year 1 Monitoring
10.00%
610.730
2021
4 - Year 2 Monitoring
10.00%
610.730
2022
5 - Year 3 Monitoring
10.00%
610.730
2023
6 - Year 4 Monitoring
5.00%
305.365
2024
7 - Year 5 Monitoring
10.00%
610.730
2025
8 - Year 6 Monitoring
5.00%
305.365
2026
9 - Year 7 Monitoring
10.00%
610.730
2027
Stream Bankfull Standard
10.00%
610.730
2022
Totals
1 1,832.190
Total Gross Credits
6,107.300
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
1,832.190
Total Percentage Released
30.00%
Remaining Unreleased Credits
4,275.110
Notes
Contingencies (if any)
Project Quantities
Mitigation Type
Restoration Type
Physical Quantity
Cool Stream
Restoration
5,535.000
Cool Stream
Enhancement II
1,260.000
Cool Stream
Preservation
683.000
Page 1 of 2
Mitigation Project Name
Key Mill Site
DMS ID
100025
River Basin
Yadkin
Cataloging Unit
03040101
County
Surry
USACE Action ID 2017-01504
DWR Permit 2017-1045
Date Project Instituted 5/25/2017
Stream/Wet. Service Yadkin 03040101
Date Printed 30/9/2020
Debits
Cool Stream
Restoration
Credits
Cool Stream
Restoration
Equivalent
Credits
Beginning Balance (mitigation credits)
6,039.000
68.300
Released Credits
1,811.700
20.490
Unrealized Credits
0.000
0.000
Converted Credits
0.000
0.000
Owning Program
Req. Id
TIP #
Project Name
USACE
DWR
DCM
Remaining Balance (Released credits)
1,811.700
20.490
Remaining Balance (Unreleased credits)
4,227.300
47.810
Total Remaining Balance (Released and Unreleased credits)
6,039.000
68.300
Page 2 of 2