Loading...
HomeMy WebLinkAbout20171045 Ver 1_Notice of Initial Credit Release_20201113Strickland, Bev From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Friday, November 13, 2020 2:28 PM To: Tugwell, Todd J CIV USARMY CESAW (US); Haywood, Casey M CIV (USA); Davis, Erin B; Wilson, Travis W.; Leslie, Andrea J; Bowers, Todd; Hamstead, Byron A Cc: Reid, Matthew; Aaron Earley; Shawn Wilkerson; Allen, Melonie; Wiesner, Paul; Harmon, Beth; Stanfill, Jim; McLendon, C S CIV USARMY CESAW (USA); Smith, Ronnie D CIV USARMY CESAW (USA) Subject: [External] Notice of Initial Credit Release/ NCDMS Key Mill Mitigation Site/ Surry Co./ SAW-2017-01504 Attachments: Key Mill_100025_STR_YD 101_Initial Release.pdf Follow Up Flag: Follow up Flag Status: Flagged External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Good afternoon, The 15-Day Record Drawing review for the Key Mill Mitigation Site (SAW-2017-01504) ended November 11, 2020. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review followed the streamlined review process. All comments received from the NCIRT are incorporated in this email. Please address IRT concerns in the MY1 Report. There were no objections to issuing the initial credit release. Please find attached the current signed ledger. DWR comments, Erin Davis: 1. In the IRT mitigation plan review, Mac echoed DMS' comment regarding the usage of log sills on steeper gradient tributaries with consideration for long term channel stability. WEI's response was to revise construction plans to incorporate more boulder sills. Given the high number of substitutions back to log sills, DWR's concern still stands. These areas should be closely inspected during monitoring for signs of instability. 2. DWR is ok with the planted material species and quantity substitutions, except for green ash. If green ash dominated areas establish during monitoring (based on plot data and site visit observations), DWR may request supplemental planting based on long term canopy closure concerns due to the emerald ash borer. 3. DWR does not believe the change in planted area warrants a reduction in ratio of credits. However, if construction equipment used for the restoration reach entered the forested buffer, then the area should be monitored for signs of woody vegetation stress/death and supplemental planted as necessary. 4. There appears to be multiple riprap swales/outlets shown on the record drawings but not the approved mitigation plan design drawings: Sheet 1.6— BMP outlet near 155+00 and floodplain riprap near 155+75, Sheet 1.7—vernal pool/BMP outlet near 159+75, and Sheet 1.9 — outlet near 165+75. Please call these areas out on future redline drawings and provide a justification for the hardening measure in the baseline report. Please contact the mitigation office if you have questions. Have a good weekend, Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers Mitigation Project Name Key Mill Site DMS ID 100025 River Basin Yadkin Cataloging Unit 03040101 County Surry USACE Action ID 2017-01504 DWR Permit 2017-1045 Date Project Instituted 5/25/2017 Stream/Wet. Service Yadkin 03040101 Date Printed 30/9/2020 BROWNING.KIMBERLY.DANIELLE.1527683510 Digitally signed by BROWN ING.KIMBERLY.DANIELLE.1527683510 Date: 2020.11.13 14:06:35-05'00' Signature of Official Approving Credit Release 1 - For NCDMS, no credits are released during the first milestone 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria have been met: 1) Approved of Final Mitigation Plan 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property. 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan. 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankfull event performance standard has been met. Credit Release Milestone Cool Stream Credits Project Credits Scheduled Releases% Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 1,832.190 1,832.190 0.000 1,832.190 2020 10/9/2020 3 - Year 1 Monitoring 10.00% 610.730 2021 4 - Year 2 Monitoring 10.00% 610.730 2022 5 - Year 3 Monitoring 10.00% 610.730 2023 6 - Year 4 Monitoring 5.00% 305.365 2024 7 - Year 5 Monitoring 10.00% 610.730 2025 8 - Year 6 Monitoring 5.00% 305.365 2026 9 - Year 7 Monitoring 10.00% 610.730 2027 Stream Bankfull Standard 10.00% 610.730 2022 Totals 1 1,832.190 Total Gross Credits 6,107.300 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1,832.190 Total Percentage Released 30.00% Remaining Unreleased Credits 4,275.110 Notes Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Cool Stream Restoration 5,535.000 Cool Stream Enhancement II 1,260.000 Cool Stream Preservation 683.000 Page 1 of 2 Mitigation Project Name Key Mill Site DMS ID 100025 River Basin Yadkin Cataloging Unit 03040101 County Surry USACE Action ID 2017-01504 DWR Permit 2017-1045 Date Project Instituted 5/25/2017 Stream/Wet. Service Yadkin 03040101 Date Printed 30/9/2020 Debits Cool Stream Restoration Credits Cool Stream Restoration Equivalent Credits Beginning Balance (mitigation credits) 6,039.000 68.300 Released Credits 1,811.700 20.490 Unrealized Credits 0.000 0.000 Converted Credits 0.000 0.000 Owning Program Req. Id TIP # Project Name USACE DWR DCM Remaining Balance (Released credits) 1,811.700 20.490 Remaining Balance (Unreleased credits) 4,227.300 47.810 Total Remaining Balance (Released and Unreleased credits) 6,039.000 68.300 Page 2 of 2