HomeMy WebLinkAbout20171045 Ver 1_NOTICE of As-Built Record Drawing_20201027Strickland, Bev
From:
Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>
Sent:
Tuesday, October 27, 2020 6:43 AM
To:
Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Davis, Erin B; Merritt, Katie;
Wilson, Travis W.; Hamstead, Byron A; Bowers, Todd; Leslie, Andrea J
Cc:
Reid, Matthew; Aaron Earley; Shawn Wilkerson; Allen, Melonie; Wiesner, Paul; Harmon,
Beth; Stanfill, Jim; McLendon, C S CIV USARMY CESAW (USA); Smith, Ronnie D CIV
USARMY CESAW (USA)
Subject:
[External] NOTICE of As-Built/Record Drawing / NCDMS Key Mill Site / Surry Co. /
SAW-2017-01504
Follow Up Flag: Follow up
Flag Status: Flagged
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Good morning,
The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section
332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT
review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day
comment deadline shown below. When providing comments please indicate if your concerns are great enough that you
recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may
not be considered.
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with
District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release.
15-Day Comment Start Date: October 27, 2020
15-Day Comment Deadline: November 11, 2020
45-Day Credit Release Approval Deadline: December 11, 2020
Proiect information and location of the FINAL As -Built Baseline Monitoring Report (M
Key Mill Mitigation Site
DMS Project # 100025
RFP# 16-006993 — Issued 9/16/2016
Institution Date: 5/25/2017 — Full Delivery
SAW-2017-01504
DWR# 20171045
Yadkin River Basin
Cataloging Unit 03040101
Surry County, North Carolina
Mitigation Plan Protect Credits:
6,106 SMUs (cool)
As-Built-MYO Protect Credits:
1
6,107.300 SMUs (cool)
* There is a 1.3 credit discrepancy from the mitigation Plan to MYO As -built. This is due to an asset rounding error in the
initial 2019 IRT approved mitigation plan.
Mitigation Plan Lengths/ Acreages:
7,478 ft.
As-Built-MYO Lengths/ Acreages:
7,437 ft.
* There is a length discrepancy from the Mitigation Plan to MYO As -built (41' less). This is due to encountering bedrock
and changing the alignment of Reach 1A (sheet 1.1 on the Record Drawings). This is also documented in the MYO report.
FD Provider: Wildlands Engineering, Inc. — Contact: Aaron Earley, aearly@wildlandseng.com, (704) 322-7754 ext. 109
NCDEQ- DMS PM: Matthew Reid, matthew.reid@ncdenr.gov, (828)-231-7912
FINAL As -Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DMS SharePoint site
here:
IRT-DMS SharePoint Page (Updated):
Blockedhttps://ncconnect.sharepoi nt.com/sites/1 RT-DMS/SitePages/Home.aspx
KeyM i I I_100025_MYO_2020. pdf
Blockedhttps://ncconnect.sharepoint.com/sites/IRT-
DMS/AsBui lt%20Report%20%20Drawi ng/Forms/AI Iitems.aspx?id=%2Fsites%2FI RT%2DDMS%2FAsBuilt%20Report%20/
20Drawing%2FKey%20Mill%20%28100025%29%2FKeyMill%5F100025%5FMYO%5F2020%2Epdf&parent=%2Fsites%2F1R
T%2DDMS%2FAsBu i It%20Report%20%20Drawi ng%2FKey%20M i l l%20%28100025%29
KeyM i I I_100025_AB_2020. pdf
Blockedhttps://ncconnect.sharepoint.com/sites/IRT-
DMS/As Built%20Report%20%20Drawing/Forms/AIIItems. aspx?id=%2Fsites%2FIRT%2DDMS%2FAsBuilt%20Report%20%
20Drawi ng%2FKey%20M i l l%20%28100025%29%2FKey%5FM i l l%5F100025%5FAB%5F2020%2Epdf&pa rent=%2Fsites%2F1
RT%2DDMS%2FAsBu i It%20Reoort%20%20Drawi nia % 2FKev%20M i I l%20%28100025%29
Please contact the Mitigation Office if you have any questions.
V/ r,
Casey Haywood
Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers
3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1
BUILDING STRONG