Loading...
HomeMy WebLinkAbout20171045 Ver 1_NOTICE of As-Built Record Drawing_20201027Strickland, Bev From: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil> Sent: Tuesday, October 27, 2020 6:43 AM To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Davis, Erin B; Merritt, Katie; Wilson, Travis W.; Hamstead, Byron A; Bowers, Todd; Leslie, Andrea J Cc: Reid, Matthew; Aaron Earley; Shawn Wilkerson; Allen, Melonie; Wiesner, Paul; Harmon, Beth; Stanfill, Jim; McLendon, C S CIV USARMY CESAW (USA); Smith, Ronnie D CIV USARMY CESAW (USA) Subject: [External] NOTICE of As-Built/Record Drawing / NCDMS Key Mill Site / Surry Co. / SAW-2017-01504 Follow Up Flag: Follow up Flag Status: Flagged External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Good morning, The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: October 27, 2020 15-Day Comment Deadline: November 11, 2020 45-Day Credit Release Approval Deadline: December 11, 2020 Proiect information and location of the FINAL As -Built Baseline Monitoring Report (M Key Mill Mitigation Site DMS Project # 100025 RFP# 16-006993 — Issued 9/16/2016 Institution Date: 5/25/2017 — Full Delivery SAW-2017-01504 DWR# 20171045 Yadkin River Basin Cataloging Unit 03040101 Surry County, North Carolina Mitigation Plan Protect Credits: 6,106 SMUs (cool) As-Built-MYO Protect Credits: 1 6,107.300 SMUs (cool) * There is a 1.3 credit discrepancy from the mitigation Plan to MYO As -built. This is due to an asset rounding error in the initial 2019 IRT approved mitigation plan. Mitigation Plan Lengths/ Acreages: 7,478 ft. As-Built-MYO Lengths/ Acreages: 7,437 ft. * There is a length discrepancy from the Mitigation Plan to MYO As -built (41' less). This is due to encountering bedrock and changing the alignment of Reach 1A (sheet 1.1 on the Record Drawings). This is also documented in the MYO report. FD Provider: Wildlands Engineering, Inc. — Contact: Aaron Earley, aearly@wildlandseng.com, (704) 322-7754 ext. 109 NCDEQ- DMS PM: Matthew Reid, matthew.reid@ncdenr.gov, (828)-231-7912 FINAL As -Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DMS SharePoint site here: IRT-DMS SharePoint Page (Updated): Blockedhttps://ncconnect.sharepoi nt.com/sites/1 RT-DMS/SitePages/Home.aspx KeyM i I I_100025_MYO_2020. pdf Blockedhttps://ncconnect.sharepoint.com/sites/IRT- DMS/AsBui lt%20Report%20%20Drawi ng/Forms/AI Iitems.aspx?id=%2Fsites%2FI RT%2DDMS%2FAsBuilt%20Report%20/ 20Drawing%2FKey%20Mill%20%28100025%29%2FKeyMill%5F100025%5FMYO%5F2020%2Epdf&parent=%2Fsites%2F1R T%2DDMS%2FAsBu i It%20Report%20%20Drawi ng%2FKey%20M i l l%20%28100025%29 KeyM i I I_100025_AB_2020. pdf Blockedhttps://ncconnect.sharepoint.com/sites/IRT- DMS/As Built%20Report%20%20Drawing/Forms/AIIItems. aspx?id=%2Fsites%2FIRT%2DDMS%2FAsBuilt%20Report%20% 20Drawi ng%2FKey%20M i l l%20%28100025%29%2FKey%5FM i l l%5F100025%5FAB%5F2020%2Epdf&pa rent=%2Fsites%2F1 RT%2DDMS%2FAsBu i It%20Reoort%20%20Drawi nia % 2FKev%20M i I l%20%28100025%29 Please contact the Mitigation Office if you have any questions. V/ r, Casey Haywood Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers 3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 BUILDING STRONG