Loading...
HomeMy WebLinkAbout20160980 Ver 1_Year 2 Monitoring Credit Release_20201119Strickland, Bev From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Sent: Monday, October 26, 2020 3:06 PM To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Haywood, Casey M CIV (USA); Davis, Erin B; Wilson, Travis W.; Bowers, Todd Subject: [External] SAW-2016-01989 / EBX-Neuse I, LLC / Neu -Con UMBI / Meadow Spring Mitigation Site Year 2 Monitoring Report Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Good afternoon, The below referenced Year 2 Monitoring Report review has been requested by EBX-Neuse I, LLC. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you intend to request a site visit prior to the Year 2 credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to EBX-Neuse I, LLC and the NCIRT along with District Engineer's intent to approve or disapprove this Year 2 Monitoring Report credit release. Sponsor: EBX-Neuse I, LLC Name: Neu -Con UMBI / Meadow Spring Mitigation Site USACE ID: SAW-2016-01989 River Basin: Neuse HUC: 03020201 County: Johnston CREDIT RELEASE: 10-percent of the total stream and wetland restoration and enhancement credits: 544 stream mitigation units, and 1.44 wetland mitigation units 15-Day Comment Start Date: October 26, 2020 15-Day Comment Deadline: November 10, 2020 45-Day Credit Release Approval Deadline: December 10, 2020 *NOTE: If a site visit is request by the IRT, comments are due 15 days after the site visit is complete. At this time an IRT site visit is not scheduled. Link to Meadow Spring Year 2 Monitoring Report can be found on RIBITS, under the Year 2 Monitoring Report: 1 https:Hurldefense.com/v3/_https://ribits.ops.usace.army.mil/ords/f?p=107:278:15616787353421::NO::P278 —BAN K_ID:4414_;!!HYmSToo!N6gYgAeXlz6YQY7oFGemVBFvwRKvkr- cg UiEYBkCcPLXQOkciWMIpALCEMJgodvOxJU$ Please select the arrow beside Year 2 Monitoring Report to view and/or download the documents. Best Regards, Sam Samantha Dailey Regulatory Project Manager U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 554-4884, Ext. 22 Samantha.j.dailey@usace.army.mil \I� DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE - WILMINGTON, NORTH CAROLINA 28403-1343 REPLY TO November 19, 2020 ATTENTION OF: Regulatory Division Action ID No. SAW-2016-01989 Re: Year 2 Monitoring Credit Release associated with the Neu -Con Umbrella Mitigation Bank, Meadow Spring Mitigation Site Mr. Brad Breslow EBX-Neuse I, LLC 3600 Glenwood Avenue, Suite 100 Raleigh, North Carolina 27612 Dear Mr. Breslow: This correspondence is in reference to the Neu -Con Umbrella Mitigation Bank, Meadow Spring Mitigation Site, located at 2082 Wilson's Mills Road, in Smithfield, Johnston County, North Carolina, within the Upper Neuse Cataloging Unit (03020201). The purpose of this letter is to confirm the release of stream and wetland restoration and enhancement credits associated with the Year 2 Monitoring activities for this project. Pursuant to the Mitigation Banking Instrument (UMBI) entitled, Neu -Con Umbrella Wetland Mitigation and Stream Restoration Bank, approved April 2, 2001 and amended April 10, 2009; the site -specific Meadow Spring Final Mitigation Plan (Plan) dated September 2018 and approved October 24, 2018; and the Meadow Spring Mitigation Site Year 2 Monitoring Report dated October 2020, 10 percent of the mitigation site's total restoration and enhancement credits shall be available for sale provided the Year 2 Monitoring Report demonstrates interim performance standards are being met. By copy of this correspondence, we confirm that you have satisfied the above requirements for the Year 2 Monitoring credit release, and 544 stream mitigation units (SMUs) and 1.44 wetland mitigation units (WMUs) are now available for sale. To date, 2803 SMUs and 7.2 WMUs (50 percent of the total restoration and enhancement credits and 100 percent of the total preservation credits) have been released for sale. Please be aware that the Long -Term Maintenance and Monitoring Performance Bond will expire on October 17, 2021. Failure to submit financial assurance prior to the expiration date may lead to a suspension in credit sales. Thank you for your interest in restoring and protecting waters of the United States. If you have questions regarding this letter, please contact Samantha Dailey, Raleigh Regulatory Field Office at Samantha. J.Dailey(a usace.army. miI or telephone (919) 554- 4884, Extension 22. Sincerely, Todd Tugwell Mitigation Project Manager Regulatory Division Electronic Copies Furnished: NCIRT Distribution List