Loading...
HomeMy WebLinkAbout20180665 Ver 1_Notice of Initial Credit Release SAW-2018-00451_20201022Strickland, Bev From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Thursday, October 22, 2020 12:14 PM To: Tsomides, Harry; Wiesner, Paul; Aaron Earley; Shawn Wilkerson Cc: Tugwell, Todd J CIV USARMY CESAW (US); Haywood, Casey M CIV (USA); Davis, Erin B; Wilson, Travis W.; Bowers, Todd; Stanfill, Jim; Hamstead, Byron A; Baumgartner, Tim; McLendon, C S CIV USARMY CESAW (USA); Smith, Ronnie D CIV USARMY CESAW (USA) Subject: [External] Notice of Initial Credit Release/ NCDMS Alexander Farm Mitigation Site/ Alexander Co./ SAW-2018-00451 Attachments: Alexander Farm_100048_CT 01_STR_Initial Release.pdf Follow Up Flag: Follow up Flag Status: Flagged EExternal email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to (@nc.Rov Good afternoon, The 15-Day Record Drawing review for the Alexander Farm Mitigation Site (SAW-2018-00451) ended October 20, 2020. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review followed the streamlined review process. All comments received from the NCIRT are incorporated within this email. Please provide a response to comments by replying to this email. There were no objections to issuing the initial credit release. Please find attached the current signed ledger. USACE Comments, Kim Browning: The proposed and As -Built mitigation plan assets are consistent (4,258.100 SMUs), but the approved mitigation plan length and the As -Built lengths differ (6,555 LF vs 6,519 LF). The As -Built credits should be adjusted to reflect the actual amount built unless the difference is from areas that were not for credit. Please verify. DWR Comments, Erin Davis: 1. Rock was added at 13 locations within the project. A few questions: a. Were other stabilization options considered prior to deciding to harden these areas? b. Was placement of rock within existing wetlands accounted for as permanent impacts in the submitted PCN? Rock placed near stations 112+00, 113+00, 115+00, 144+50, and 166+50 appear to overlap the wetland polygons on the redline drawings. DWR requests an additional photo point near Station 118+00 focusing on the culvert crossing connection. 3. DWR appreciates the bulleted descriptions of field changes included in the baseline report. We would request that a few more words be added to changes "due to site/field conditions" in order to provide context. 4. In future baseline reports, please note if monitoring locations have changed from locations shown in the approved mitigation plan monitoring figure (this isn't meant to include shift of a few feet in the field). The IRT regularly comment on gauge and plot locations during the draft mitigation plan review and need to be aware of changes in order to compare documents. EPA Comments, Todd Bowers: * Excellent spread of photos highlighting stream structures, veg plots and gauges. I would recommend adding photos of culverts at the cattle crossing easement break and at the road. * Recommend identifying the unknown oak species as Quercus alba as it is the only other oak species that was planted especially since they were just planted. I hope this gets rectified in the MY1 report. * Recommend adding a beaver contingency to the Adaptive Management plan in Section 4.1. * Late planting date (April 17, 2020) is noted and that the earliest date of MY1 monitoring will be October 17, 2020. (approximately 180-days post planting) * Species change noted in planting plan. No concerns with substitutions. * Recommend adding wetland indicator status to planting plans for vernal pools planting zone. * 2.0 credit ratio for restoration work on Reaches 1A and 1B noted; due to contracted credit requirement. Please contact the mitigation office if you have questions. Thanks Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers Mitigation Project Name Alexander Farm DMS ID 100048 River Basin Catawba Cataloging Unit 03050101 County Alexander BROWN ING.KIMBERLY.DANIELLE.1527683510 USACE Action ID 2018-00451 DWR Permit 2018-0665 Date Project Instituted 1/26/2018 Stream/Wet. Service Area Catawba 03050101 Date Printed 9/3/2020 Digitally signed by BROWN ING.KIMBERLY.DANIELLE.1527683510 Date: 2020.10.22 1 1:38:43-04'00' Signature of Official Approving Credit Release Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 1,277.430 1,277.430 0.000 1,277.430 2020 9/3/2020 3 - Year 1 Monitoring 10.00% 425.810 2021 4 - Year 2 Monitoring 10.00% 425.810 2022 5 - Year 3 Monitoring 10.00% 425.810 2023 6 - Year 4 Monitoring 5.00% 212.905 2024 7 - Year 5 Monitoring 10.00% 425.810 2025 8 - Year 6 Monitoring 5.00% 212.905 2026 9 - Year 7 Monitoring 10.00% 425.810 2027 Stream Bankfull Standard 10.00% 425.810 2022 Totals 1,277.430 Total Gross Credits 4,258.100 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1,277.430 Total Percentage Released 30.00% Remaining Unreleased Credits 2,980.670 Notes Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 4,577.000 Warm Stream Enhancement II 1,260.000 Warm Stream Preservation 718.000 Debits Warm Stream Warm Stream Restoration Restoration Credits Equivalent Credits (Beginning Balance (mitigation credits) 1 4,186.3001 71.8001 Page 1 of 2 Mitigation Project Name USACE Action ID 2018-00451 DWR Permit 2018-0665 Date Project Instituted 1/26/2018 Stream/Wet. Service Area Catawba 03050101 Date Printed 9/3/2020 Alexander Farm DMS ID 100048 River Basin Catawba Cataloging Unit 03050101 County Alexander Released Credits 1,255.890 21.540 Unrealized Credits 0.000 0.000 Converted Credits 0.000 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 1,255.890 21.540 Remaining Balance (Unreleased credits) 2,930.410 50.260 Total Remaining Balance (Released and Unreleased credits) 4,186.300 71.800 Page 2of2