Loading...
HomeMy WebLinkAbout20180063 Ver 1_As-built site visit minutes_20200904Strickland, Bev From: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil> Sent: Friday, September 4, 2020 12:26 PM To: Bradley Breslow; Davis, Erin B; Tugwell, Todd J CIV USARMY CESAW (US); Bowers, Todd; Wilson, Travis W.; Leslie, Andrea J; Haywood, Casey M CIV (USA); Kim Browning Cc: Ryan Medric; Matthew Deangelo; Frasier Mullen; David Godley Subject: RE: [External] Carolina Bison as -built site visit minutes Follow Up Flag: Follow up Flag Status: Flagged External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Good afternoon, After the Carolina Bison as -built meeting, the IRT had some discussion about the Carolina Bison vegetation and the IRT agreed that action removing some of the substitute vegetation like black walnut and crab apple was needed. The next step would be for RES to propose solutions for both IRT concerns regarding the vegetation substitutions and the multiple riprap bmp's added within the CE. The proposal should also provide an update on the project fencing status and include a map of the areas in question. Thank you Erin for your comment. Does anyone else from the IRT have additional comments about the project or the minutes summary prior to RES submittal? Regards, Steve Kichefski Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District, Asheville Field Office 151 Patton Avenue, Suite 208 Asheville, NC 28801 (828)-271-7980 Ext. 4234 (828)-933-8032 cell The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 to complete the survey online. From: Bradley Breslow <bbreslow@res.us> Sent: Friday, August 14, 2020 8:30 AM To: Davis, Erin B <erin.davis@ncdenr.gov>; Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski @usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Bowers, Todd <bowers.todd@epa.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Cc: Ryan Medric <rmedric@res.us>; Matthew Deangelo <mdeangelo@res.us>; Frasier Mullen <fmullen@res.us>; David Godley <dgodley@res.us> Subject: [Non-DoD Source] RE: [External] Carolina Bison as -built site visit minutes No problem, Erin. We will update with that comment and get the report loaded to Laserfiche. Thanks, Brad Breslow Regulatory Manager, Southeast RES I res.us Direct: 919.209.1062 1 Mobile: 847.774.8404 From: Davis, Erin B <erin.davis@ncdenr.gov> Sent: Friday, August 14, 2020 7:42 AM To: Bradley Breslow <bbreslow@res.us>; Steve Kichefski <Steven.1.kichefski@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (US)<Todd.J.Tugwell@usace.army.mil>; Bowers, Todd <bowers.todd@epa.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil> Cc: Ryan Medric <rmedric@res.us>; Matthew Deangelo <mdeangelo@res.us>; Frasier Mullen <fmullen@res.us>; David Godley <dgodlev@res.us> Subject: [EXTERNAL] RE: [External] Carolina Bison as -built site visit minutes Brad, Thanks for sending these minutes. I would just rephrase the "nothing to do now' statement under the planting plant section. My recollection was that the IRT was going to discuss and get back to you with next step requirements. Also, please upload the as -built report and drawings to the DWR Laserfiche (DWR# 20180063 V.1). Many thanks, Erin From: Bradley Breslow [mailto:bbreslow@res.us] Sent: Wednesday, August 12, 2020 4:45 PM To: Steve Kichefski <Steven.1.kichefski@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Bowers, Todd <bowers.todd@epa.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Davis, Erin B <erin.davis@ncdenr.gov>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil> Cc: Ryan Medric <rmedric@res.us>; Matthew Deangelo <mdeangelo@res.us>; Frasier Mullen <fmullen@res.us>; David Godley <dgodlev@res.us> Subject: [External] Carolina Bison as -built site visit minutes External email. Do not click links or open attachme report.spam@nc.gov Hello all, Thank you for attending our as -built site visit last week for the Carolina Bison mitigation site in the RES French Broad 05 UMBI. I have attached the meeting minutes for your review, comment, or otherwise approval. Please let us know if you have any feedback. Thank you, Brad Breslow Regulatory Manager, Southeast RES I res.us Direct: 919.209.1062 1 Mobile: 847.774.8404