Loading...
HomeMy WebLinkAbout710002_referral_20201210Division of Water Resources Facility Number - O Division of Soil and Water Conservation O Other Agency Visit: ` Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance for Visit: O Routine O Complaint O Follow-up ,(V Referral O Emergency O Other O Denied Access Date of Visit: Farm Name: 1 Owner Name: Mailing Address: Physical Address: Facility Contact: Arrival Time: L-- Departure Time: County: Region: Title: Owner Email: Phone: �M W Onsite Representative: V Integrator: Certified Operator: ,1 Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish oars Other Other Latitude: Phone: --Tro r3© 6 7 D Certification Number: Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer 1= ---- d , Non -Layer Design Current nry Pmiltrv' Canacitv Pon. Layers Non -Layers Pullets Turkeys Turkey Poults Other DischarSes and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes 10 ❑ NA ❑ NE ❑ Yes ❑ No ENA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No L ZNA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No eNA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes FZ/No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facility Number: jDate of inspection: ], Iv Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? s ❑ No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? Yes ❑ No ❑ NA ❑ NE Identifier: Structure 1 Structure 2 Structure 3 Structure 4 1 Spillway?: _ Designed Freeboard (in): _ Observed Freeboard (in): _ 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? Structure 5 Structure 6 ❑ Yes [] No `--❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes �Io ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes 6-No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes D" o ❑ NA ❑ NE maintenance or improvement? Waste Application ,—{I�l' 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ L Yes o ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes EE No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes dNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes Ejl<o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes F7:Wo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes E3 No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ✓ No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, che�thhppropriate box below. 0Yes o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard e Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes Inspections ❑ NA VNE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA Page 2 of 3 21412015 Continued Facility Number: 7A- —� Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes E31No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes To ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes 2<0 ❑ NA - ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ NoraeA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑.PLO ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA L"J &E ❑ Application Field ❑ Lagoon/storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes �No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes Q No ❑ NA ❑ NE 34. Does=the facility require a follow-up visit by the same agency? ❑ Yes �To ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). USG ,gyp �� ,� "l Z e YO Oac�� v�G i^, l C �,.r� S� l� S�°S 1 �;c k11" I } n ` r r1'c e-Q �ioctil'�` is �U '�St7�r� Uc^�' ',� 1!4 OS 7 O fC.e"�L • (,c,J • �j1 ("o Sck Li�-c as C­e P o'."j T-"­ wd 6(V- " POT �� �� Yy Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 J V W Phone: EZv 3�D 0 / Date: to iA 21412015