From: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>
Sent: Thursday, August 27, 2020 9:57 PM
To: Tugwell, Todd J CIV USARMY CESAW (US); Davis, Erin B; Wilson, Travis W.; Bowers,
Todd; Byron Hamstead; Leslie, Andrea J; Merritt, Katie; Jones, M Scott (Scott) CIV
USARMY CESAW (USA); McLendon, C S CIV USARMY CESAW (USA); Crumbley, Tyler A;
Kim Browning
Cc: Reid, Matthew; tomsic@waterlandsolutions.com; Wiesner, Paul
Subject: [External] RE: IRT Review Request: As -Built Baseline Monitoring Report (MYO) - Horne
Creek Tributaries (DMS#100026) - (SAW-2017-01510) (DWR#20171156) - Yadkin
03040101 (Surry County)
Follow Up Flag: Follow up
Flag Status: Flagged
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Please note the following:
A site visit with DMS is scheduled for September 15, 2020 and comments will be due September 30, 2020.
Thank you,
Casey Haywood
From: Haywood, Casey M CIV (USA)<Casey.M.Haywood@usace.army.mil>
Sent: Thursday, August 27, 2020 6:23 PM
To: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B
<erin.davis@ncdenr.gov>; 'Wilson, Travis W. <travis.wilson@ncwildlife.org>; 'Bowers, Todd <bowers.todd@epa.gov>;
Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Byron Hamstead <byron_Hamstead@fws.gov>;
Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Merritt, Katie <katie.merritt@ncdenr.gov>; Jones, M Scott (Scott) CIV
USARMY CESAW (USA) <Scott.Jones@usace.army.mil>; McLendon, C S CIV USARMY CESAW (USA)
<Scott.C.McLendon@usace.army.mil>; Crumbley, Tyler A <Tyler.A.Crumbley@usace.army.mil>; Browning, Kimberly D
CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>
Cc: Reid, Matthew <matthew.reid@ncdenr.gov>; tomsic@waterlandsolutions.com; Wiesner, Paul
<paul.wiesner@ncdenr.gov>
Subject: IRT Review Request: As -Built Baseline Monitoring Report (MYO) - Horne Creek Tributaries (DMS#100026) -
(SAW-2017-01510) (DWR#20171156) - Yadkin 03040101 (Surry County)
Good morning,
The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section
332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT
review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day
comment deadline shown below. When providing comments please indicate if your concerns are great enough that you
recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may
not be considered.
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with
District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release.
15-Day Comment Start Date: August 27, 2020 15-Day Comment Deadline: September 11, 2020 45-Day Credit Release
Approval Deadline: October 11, 2020
2020 is Monitoring Year 1 for this project.
Protect information and location of the FINAL As -Built Baseline Monitoring Report (MYO):
Horne Creek Tributaries Site
DMS Project # 100026
RFP# 16-006993 — Issued 9/16/2016
Institution Date: 5/25/2017 — Full Delivery
Yadkin River Basin
Cataloging Unit 0304101
Surry County, North Carolina
Mitigation Plan Protect Credits:
5,389.000 SMUs (warm)
As-Built-MYO Protect Credits:
5,389.000 SMUs (warm)
Mitigation Plan Lengths/ Acreages:
5,428 ft.
As-Built-MYO Lengths/ Acreages:
5,428 ft.
FD Provider: Water & Land Solutions — Contact: Christopher Tomsic, tomsic@waterlandsolutions.com, (828) 493-3287
NCDEQ- DMS PM: Matthew Reid, matthew.reid@ncdenr.gov, (828)-231-7912
FINAL As -Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DMS SharePoint site
here:
IRT-DMS SharePoint Page (Updated):
Blockedhttps://ncconnect.sharepoi nt.com/sites/I RT-DMS/SitePages/Home.aspx
HorneCrk_100026_MYO_2020. pdf
Blockedhttps://ncconnect.sharepoint.com/sites/IRT-
DMS/AsBuilt%20ReDort%20%20Drawinia/Forms/Allitems.asDx?id=%2Fsites%2FIRT%2DDMS%2FAsBuilt%20ReDort%20/
20Drawing%2FHorne%20Creek%20%28100026%29%2FHorneCrk%5F100026%5FMYO%5F2020%2Epdf&parent=%2Fsites
%2F1 RT%2DDMS%2FAsBu i It%20Reoort%20%20Drawi nia % 2FHorne%20Creek%20%28100026%29
HorneCrk_100026_AB_2020. pdf
Blockedhttps://ncconnect.sharepoint.com/sites/IRT-
DMS/AsBui lt%20Report%20%20Drawi ng/Forms/AI Iitems.aspx?id=%2Fsites%2FI RT%2DDMS%2FAsBuilt%20Report%20/
20Drawi ng%2FHorne%20Creek%20%28100026%29%2FHorneCrk%5F100026%5FAB%5F2020%2Epdf&parent=%2Fsites%
2F1 RT%2DDMS%2FAsBu i It%20Report%20%20Drawi ng%2FHorne%20Creek%20%28100026%29
Please let me know if you have questions or call to discuss.
V/ r,
Casey Haywood
Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers
3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1
BUILDING STRONG