Loading...
HomeMy WebLinkAbout20201146 Ver 1_Figure 10 - Conceptual Design UPDATE_20200831Strickland, Bev From: Bradley Breslow <bbreslow@res.us> Sent: Monday, August 31, 2020 3:56 PM To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Davis, Erin B Cc: Jessop, Jordan E CIV USARMY CESAW (USA); Kasey Carrere Subject: [External] FW: Newman Ranch: Concept Update Attachments: Figure 10 - Conceptual Design UPDATE - Newman Ranch_20200825.pdf Follow Up Flag: Follow up Flag Status: Flagged External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hello IRT members, Please see email below from Kasey to Jordan. Not sure if he has forwarded it yet, but I wanted to make sure you all know about the road closure on Shady Grove Road shown on the screenshot below. It would be best to take Elliott Bridge Road from the east as shown. Also, the concept has been updated since original prospectus submittal. Also, I am planning to bring some copies (and CDs) of the Dugout Draft Mitigation Plan for Jordan, Kim, and Erin. Please let me know if you have any questions/comments. Thanks! Brad Breslow Regulatory Manager, Southeast RES I res.us Direct: 919.209.1062 1 Mobile: 847.774.8404 From: Kasey Carrere <kcarrere@res.us> Sent: Monday, August 31, 2020 9:10 AM To: Jessop, Jordan E CIV USARMY CESAW (USA) <Jordan.E.Jessop@usace.army.mil> Cc: Bradley Breslow <bbreslow@res.us> Subject: RE: Newman Ranch: Concept Update Good Morning Jordan, Just following up from my last email about the concept and the Dugout Draft Mitigation Plan. I have attached the most recent concept in regards to Newman Ranch. Also, I wanted to bring to your attention that there is a road closure on Shady Grove Road. The property cannot be accessed from the west so I think it would be best to meet at the corner of Shady Grove Road and Buddy Barefoot Road. I have provided a screenshot of the new route below. Would you mind sending us a list of who all will be attending the meeting and their contact information? Nqrw M"Z i.,# I&LOtion 34 ' �Q•d Cta4wdliwdl"i salvrt In regard to the Dugout Draft Mitigation Plan, we plan on printing the draft mitigation plan today. Would you mind if we just brought the hard copies with us to give to you at the Newman Ranch site visit on Wednesday? If so, how many copies would you prefer? Thanks, Kasey Carrere Project Manager RES I res.us Mobile: 561.762.2334 From: Kasey Carrere Sent: Tuesday, August 25, 2020 6:08 PM To: 'Jessop, Jordan E CIV USARMY CESAW (USA)'<Jordan.E.Jessop@usace.army.mil> Cc: Bradley Breslow <bbreslow@res.us> Subject: RE: Newman Ranch: Concept Update HiJordan, Not a problem. We will be sure to include it in the prospectus with the comments after the site visit. We were planning to develop the whole parcel as a mitigation bank, but decided to submit a small component to the DMS RFP. We were not awarded based on our cost proposal; therefore, we have updated the concept to incorporate the area back into the overall bank development. We also plan to submit a draft mitigation plan to you soon for the SAW-2018-01883: Dugout Stream and Wetland Mitigation Site. Do you have a preference on how you would like the hard copies submitted to you and the IRT? Thanks, Kasey Carrere Project Manager RES I res.us Mobile: 561.762.2334 From: Jessop, Jordan E CIV USARMY CESAW (USA)<Jordan.E.Jessop@usace.army.mil> Sent: Tuesday, August 25, 2020 2:51 PM To: Kasey Carrere <kcarrere@res.us> Subject: [EXTERNAL] RE: Newman Ranch: Concept Update Hi Kasey, I apologize for the delay in getting back to you, I was on leave for a few days and then I've just been swamped. I was wondering about the status of that of that DMS site. We would ask you to integrate it into the prospectus with our comments, after the site visit. Thanks, Jordan From: Kasey Carrere <kcarrere@res.us> Sent: Thursday, August 13, 2020 10:26 AM To: Jessop, Jordan E CIV USARMY CESAW (USA)<Jordan.E.Jessop@usace.army.mil> Subject: [Non-DoD Source] Newman Ranch: Concept Update Hi Jordan, We have an update to the concept for the Newman Ranch project which will include a small section of approximately 3,365 LF of stream and 15.64 acres of wetland we were anticipating for a DIMS project. However, we are now including it in the bank instead. How would you like us to handle the change to the concept prior to the site visit? Nothing else with the concept has changed. Best regards, Kasey Carrere Project Manager RES I res.us Mobile: 561.762.2334 ILI1 s O Area 1 Legend Proposed Easement - 387.79 ac Restoration Project Parcel — — — Restoration (HWV) Mitigation Approach Enhancement II Enhancement Preservation ® Preservation - Re-establishment Rehabilitation M Long Leaf Pine 1 -: Restoration Stream Mitigation Reach ID Approach Length (ft) Ratio SMU MF1 Restoration 2,910 1 2,910.000 MF2 Restoration (HWV) 455 1 455.000 MF3-A Restoration 1,506 1 1,506.000 MF3-B Restoration 2,110 1 2,110.000 MF3-C Enhancement II 2,450 2.5 980.000 MF4-A Preservation 1,964 10 196.400 MF4-B Restoration 4,138 1 4,138.000 MF5-A Preservation 1,883 10 188.300 MF5-B Restoration 3,956 1 3,956.000 Total 21,372 16,439.700 Wetland Mitigation Wetland ID Approach Area (ac) Ratio WMU Area 1 Rehabilitation 58.59 1.5 39.060 Preservation 8.71 10 0.871 Area 2 Rehabilitation 23.72 1.5 15.813 Preservation 36.82 10 3.682 Area 3 Enhancement 11.07 2 5.535 Rehabilitation 6.99 1.5 4.660 Re-establishment 13.90 1 13.900 Area 4 Preservation 105.15 10 10.515 Enhancement 20.12 2 10.060 Preservation 23.67 10 2.367 Area 5 Enhancement 11.04 2 5.520 Re-establishment 11.29 1 11.290 Total 331.07 123.273 " Figure 10 - Concept Plan (Update) Date: 8/25/2020 w e Drawn by: MDE res Newman Ranch 0 750 1,500 Mitigation Project Checked by: BPB Feet Harnett County, North Carolina 1 inch = 1,500 feet