HomeMy WebLinkAboutNCC205902_ESC Approval Submitted_20201230ROY COOPER�SUTFQ�
Governor
MICHAEL S. REGAN
Secretary
Wow
BRIAN WRENN
NORTH CAROLINA
Director
Environmental Quality
December 16, 2020
LETTER OF APPROVAL WITH MODIFICATIONS
Davidson Land Development, LLC
ATTN: Lanny Hedrick, Owner
5930 E. Old US Hwy 64
Lexington, NC 27292
RE: Project Name: Glen Oaks Phase 2, 3 & 4
Acres Approved: 15
Project ID: DAVID-2021-021
County: Davidson
City: Lexington
Address: Glenoaks Dr.
River Basin: Yadkin-PeeDee
Stream Classification: C
Submitted By: Summey Engineering Associates, PLLC
Date Received by LQS: December 8, 2020
Plan Type: New -Express
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall
expire three (3) years following the date of approval, if no land -disturbing activity has been
undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $100 annual permit fee. After the fee is
received, you will receive the COC via email. You MUST obtain the COC prior to commencement
of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please
direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul
Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the
new responsible party is required to apply for his/her own COC.
North Carolhta Department of Environmental Quality I DMston of Energy, Mineral and Land Resources
{^�!/� •���'j Winston-Salem Regional Office 1 450 Hanes Mill Road Suite 3001 Winston-Salem, North Carolina 27103
�^��� 336776.9800
Letter of Approval with Modifications
Davidson Land Development, LLC
December 16, 2020
Page 2 of 3
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan
is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules
may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. This permit allows for a land -disturbance,
as called for on the application plan, not to exceed the approved acres. Exceeding the acreage
will be a violation of this permit and would require a revised plan and additional application fee.
You are requested to file an amended form if there is any change in the information included on
the form. In addition, it would be helpful if you notify this office of the proposed starting date for
this project. Your cooperation is appreciated.
Sincerely,
Za hary tz, EI
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCG01 Fact Sheet
cc: Christian Vestal, PE of Summey Engineering Associates, PLLC (via email)
WSRO file
Letter of Approval with Modifications
Davidson Land Development, LLC
December 16, 2020
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Glen Oaks Phase 2, 3 & 4
Project ID: DAVID-2021-021
County: Davidson
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. This plan only covers land -disturbing activity associated with installation of measures,
clearing, and grubbing. Grading of the site for any activity not specified on this plan, including
mass grading, installation of a roadway, or construction, will require a separate approval. The
measures must be removed and stabilized prior to closeout, and plan cannot be closed out or
transferred in sections. [15A NCAC 413, G.S. 113A-57(3,5)]
2. Per Section 6.20 of the North Carolina Erosion and Sediment Control Planning and Design
Manual, diversions that will stay in place longer than 30 working days should be seeded and
mulched as soon as they are constructed to preserve dike height and reduce maintenance.
[G.S. 113A-57(2)]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities