Loading...
HomeMy WebLinkAbout310562_30 day poa_20201225PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-562 Facility Name: Duplin Marketing Certified Operator Name: Derek Brown County: Duplin Operator Number: AWA19632 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name11D: 5pillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1860 N 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations_ Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. `Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Duplin Marketing Phone Facility Own ``er/Manager (print) (l VN� Date: Facility Owner/Manager (signat re) 910-282-6582 12/28/2020 il. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 1860 line m = 160.6 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5_ Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 160.6lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o_ tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN 13ALANCE FOR FIELD (lbs.) column r x s v_ application window' SowSpa 1 Small Grain 1.71 21.35 36.5 March --Sept SowSpa 3 Small Grain 1.45 23.90 34.7 March -Sept 4 Small Grain 227 38.33 87.0 March -Sept 5 Small Grain 3.33 21.28 70.9 March -Sept 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 229.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 160.6 lb. PAN PoA (30 Day) 2121 /00 x. Crop's remaining PAN balance (line v from section 111) = 229.0 lb. PAN y. Overall PAN balance (w - x) _ -68 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2011100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelldentifier (ID): 11860 7 2. Current liquid volume in 25 yrJ24 hr_ storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr_ storm & structural freeboard 20.1 inches c. line b -- line a (inches in red zone) = 2.1 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 67077 ft2 e. line c112 x line d x 7.48 gallonslft3 87804 gallons 3. Projected volume of waste liquid produced during draw down period f_ temporary storage period according to structural design 180 days g_ volume of waste produced according to structural design 49452 ft3 h. current herd # 1500 certified herd #1 1500 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I_ current waste analysis dated 1 12/3/2020 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 49452 ft' ® ft3 39128 ft3 110430 gallons 0.81 Ibs/1000 gal. 160.6 Ibs. PAN PoA (30 Day) 2121 /00