Loading...
HomeMy WebLinkAbout820583_Inspection_20200729 Division of Water Resources Sly i t 2d L,d Facility Number - S 0 Division of Soil and Water Conservation 0 Other Agency f:4 0 Type of Visit: C 11 om lance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: :a Departure Time: f/;tbP.- County: gel- era Region:-4 Farm Name: L4`1 �,eS PPe,r) e,61,1 Owner Email: Owner Name: =-.1.--ki(;5'r -P.? )O & Phone:. - 1 Mailing Address: Physical Address: - Facility Contact: CU,L,�rt ) t c ttif 1_ El Title: Phone: Onsite Representative: !t Integrator: Ms Certified Operator: L!tit U"S tit Pt-lb Certification Number: 1 ¶/07 Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish Layer Dairy Cow Wean to Feeder Non-Layer Dairy Calf Feeder to Finish dfg-n Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other Discharges and Stream Impacts 1.Is any discharge observed from any part of the operation? ❑ Yes E N6`❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? _ ❑.Yes ❑ No E"NA ❑ NE b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No Q-A ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No EK. ❑ NE 2.Is there evidence of a past discharge from any part of the operation? ❑ Yes IE'No ❑ NA 0 NE 3.Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes LINO ❑ NA ❑NE of the State other than from a discharge? Page 1 of 3 2/4/2015 Continued Facility Number: 4 . Date of Inspection:O 7) Waste Collection&Treatment 4.Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes ❑ No L[ _N-A ❑ NE a.If yes,is waste level into the structural freeboard? ❑ Yes ❑ No [ 1 ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard(in): Observed Freeboard(in): 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ❑ No [}N23T ❑ NE (i.e.,large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes ❑ No ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR 7.Do any of the structures need maintenance or improvement? ❑ Yes ❑ No [NA ❑ NE 8.Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ No 13-N*—❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9.Does any part of the waste management system other than the waste structures require ❑ Yes ❑ No [ ❑ NE maintenance or improvement? Waste Application 10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes ❑ No.. Q NA--❑ NE maintenance or improvement? 11.Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes ❑ No D" 1�A ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NE 15.Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ No []-Ids' ❑ NE 16.Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No 1A ❑ NE acres determination? 17.Does the facility lack adequate acreage for land application? ❑ Yes ❑ No 0,NA ❑ NE 18.Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No Q A ❑ NE Required Records&Documents 19.Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes 01° ❑ NA ❑ NE 20.Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes ato ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21.Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes To ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1"Rainfall Inspections ❑Sludge Survey 22.Did the facility fail to install and maintain a rain gauge? ❑ Yes [co ❑ NA ❑ NE 23.If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes `ru ❑ NA ❑ NE Page 2 of 3 2/4/2015 Continued Facility Number: Sq-- - g Date of Inspection: ,]rj aGj 24.Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ® ❑ NA ❑ NE 25.Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes Eric ❑ NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26.Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes 12 No ❑ NA ❑ NE 27.Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes [(No ❑ NA ❑ NE Other Issues 28.Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No Q"l1A ❑ NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No _A ❑ NE If yes,contact a regional Air Quality representative immediately. 30.Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No 0 ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31.Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes ❑ Nor ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No atcrA ❑ NE 33.Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes ❑ No ❑"1<A ❑ NE 34.Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No Q'vA ❑ NE Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). Lvez_v ,fir _ C i`t OU-St:f V\-4' La16191A el CCU/Ltd 0 C,01 V 6c.cfr ee(( r6 -3 0 -G s Reviewer/Inspector Name: � (,( 319bJ n Phone: 433--.'" :3734.-[ Reviewer/Inspector Signature: f 1 "1 A'.' Date: ' cil., 2-t Page 3 of 3 2/4/2015