Loading...
HomeMy WebLinkAbout820625_30 DAY POA_20201226PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82 - 625 Facility Name: Certified Operator Name: County: Sampson Phillip Williams Farm Phillip Williams Operator #: AWA 19886 lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Lagoon Name (ID): 1 Spillway (Yes or No): No Level (inches): 18" 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as weather permits I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Phillip Williams Phone: Date: Facility Owner/Manager (signature) Cover Page Phillip Williams (82-625) PoA30day (12-28-20) 12/26/2020 Page 1 of 1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 12/26/2020 1. Structure Name/Identifier (ID): I Phillip Williams (82-625) 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 106,375 ft2 e. line c/12 x line d x 7.48 gallons/ft3 66,307 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 151,652 ft3 h. current herd # 4,600 certified herd # 4,600 actual waste produced = current herd # x line g = 151,652 ft' certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 67,200 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 272,836 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 9/18/2020 0.88 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 298.4 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Structure 1 Phillip Williams (82-625) PoA30day (12-28-20) Page 1 of 1 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Phillip Williams (82-625) line m = 298.4 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 298.4 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 3437 1 Small Grain 6.12 25.00 153.1 10/1 - 3/31 3437 2 Small Grain 0.64 25.00 16.1 10/1 - 3/31 3437 4-5 Small Grain 17.78 25.00 444.6 10/1 - 3/31 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 613.8 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 298.4 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 613.8 lb. PAN y. Overall PAN balance (w - x) = -315 lb. PAN Summary Phillip Williams (82-625) PoA30day (12-28-20) Page 1 of 2 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Waste will be applied as soon as weather permits. Summary Phillip Williams (82-625) PoA30day (12-28-20) Page 2 of 2