Loading...
HomeMy WebLinkAbout090203_30 day POA_20201228PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 9-203 County: Bladen Facility Name: Mr. Holmes Complex Certified Operator Name: Victor Sultan Operator Number: AWA26076 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon 6 Lagoon Name/ID: 2042 3082 3084 3086 3081 4205 5pillway(Y or N): N N N N N N Level(inches): 15 15 19 25 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. K Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP_ Operation will be partially or fully depopulated. `Attach a complete schedule with corresponding anirnal units and dates fro depopulation `if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Murphy Brown, LLC Phone Facility Owner/Manager (print) M-1 C� Date: Facility Owner/Manager (signature) 910-293-3434 12/28/2020 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: - ? r)$ I fine m = 110- S-Ib PAN 2. Structure ID: 389.2-- 3 o k, line m = 1-1 1. v lb PAN 3. Structure ID: 399r5-- yOs fine m = lb PAN 4. Structure ID: 3093 line m = lb PAN 5. Structure ID: 3084 line m = 2701.7 lb PAN 6. Structure ID: 3090 line m = lb PAN 'llctll n.lines 1+2+3+4+5+6= 2•r6lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIFr] I'MIRINC; YNis An nnv p>=Rinn o. tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s o. application window' H43 Wheat 120.01 45.52 5462,9 Sept -April Al-12 Wheat 92.55 48.43 4482.2 Sept -April A54-1 Small Grain 18.85 80.70 1521.2 Sept -April A54-2 Small Grain 49.79 80.70 4018.1 Sept -April H63 Wheat 61.54 99.10 6098.6 Sept -April H64 Wheat 102.58 80.39 8246.4 Sept -April State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 29829.3 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE ---x w. Total PAN to be land applied (line n from section II) _ 1b. PAN PoA (30 Day) 2/21/00