HomeMy WebLinkAbout820557_Structure Evaluation Inspection_20180927 StructureatEvaluatio.n inspection
Facility Number: • -= �.� 7 Date:_
Time in: / 0 Time out: (5.
Farm Name:
. .Farm 91�1 address:
Owner Name: t .L -�� Phone
Facility Contact:
Onsite Representative: Integrator:L
Certified Operator: .- Cert. Number -
Is storage capacity less than adequate? Yes No
If yes is waste level,into the structural freeboard? Yes No 'd
Was non-compliant=level reported to DWR - " -POA 'received _.
Structure: 1: 2 3 4 5 6
Identifier:
Spillway?
Designed Freeboard (in.): C . ;: rg.._.'
Observed Freeboard (in.): ' - -
Are there any immediate threats to the:integrity of-any of the structures
observed? Yes No :
Do any structures lack adequate markers as required by the permit?Yes No -
Does any part of the waste_Management system need repair Yes No
Condition of1field's
Condition of receiving crop
•
Comments:
` t.. `— /2/00'`,� e'
/uy e S %l�
c ��: .
r/�x�� e.9 7 1 5 I.s'9z.��°G� .