Loading...
HomeMy WebLinkAboutSW6160401_20201228 SCM Supplement_Infiltration Basin_Rev.5_20201229Permit No. (to be provided by DWQ) �OF WATFgo ��H -n r r lei STORMWATER MANAGEMENT PERMIT APPLICATION FORM o NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project Name USAJFKSWCS D-Area Campus Regional Stormwater System Contact Person Lewis Hutchins Phone Number 7579617750 Date 7/28/2020, Resubmitted 12/28/2020 Drainage Area Number As identified on plans II. DESIGN INFORMATION Site Characteristics Drainage area 839,375.00 ftz Impervious area 477,853.00 ftZ Percent impervious 56.93 % Design rainfall depth 1.80 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SA Waters Minimum design volume required Design volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Minimum required volume Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area s. iu in 0.13 in/hr 31.83 ft3/sec 8.68 ft3/sec -23.15 ft3/sec 11,334.00 ft3 18,128.00 ft3 OK for non -SA waters ft3 ft3 ft3 ft3 ft3 HSG "A" 7.50 in/hr 255.00 fmsl 0.10 days OK N/A :1 OK 267.00 fmsl OK 269.33 fmsl 10,800.00 ftZ 269.53 fmsl 180.00 ft 60.00 ft 10,800.00 ftZ Form SW401-Infiltration Basin-Rev.5 11Apr2011 Parts I. & II. Design Summary, Page 1 of 3 Permit No (to be provided by DWQ) Additional Information Maximum runoff to each inlet to the basin? Length of vegetative filter for overflow Distance to structure Distance from surface waters Distance from water supply well(s) Separation from impervious soil layer Naturally occuring soil above shwt Bottom covered with 4-in of clean sand? Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger storms? Pretreatment device provided ac-i n N/A ft OK 16.00 ft OK 600.00 ft OK >1000 ft OK 25.00 ft OK 25.00 ft OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Manufactured Treatment Device Form SW401-Infiltration Basin-Rev.5 11Apr2011 Parts I. & II. Design Summary, Page 2 of 3 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. NTJ Ex. Permit 1. Plans (1" 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. NTJ Ex. Permit 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: Bypass structure, Maintenance access, Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, Vegetated filter, and Pretreatment device. NTJ Ex. Permit 3. Section view of the infiltration basin (1" = 20' or larger) showing: Pretreatment and treatment areas, and Inlet and outlet structures. NTJ Ex. Permit 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. NTJ Ex. Permit 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. NTJ CG501 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized. NTJ Narrative 7. The supporting calculations. NTJ Narrative 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. N/A N/A 9. A copy of the deed restrictions (if required). Form SW401-Infiltration Basin-Rev.4 Page 3 of 3 Part III. Required Items Checklist, Page 3 of 3