Loading...
HomeMy WebLinkAbout20191428 Ver 1_Certification of Completion_20201229 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 12/29/2020 1:08:16 PM(Start) BIMS Updated by Carpenter,Kristi 12/29/2020 3:20:04 PM(DOT Project) • The task was assigned to Carpenter,Kristi 12/29/2020 1:08 PM $ a�.srarEa Certification of Completion NORTH CAROLINA Enrlronmental Quality Staff Review DWR Project#:* 20191428 Version:* 1 Reviewer List* Joanne Steenhuis:eads\jhsteenhuis CERTIFICATION SUBMITTED ON 12/29/2020 Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules,and any subsequent modifications,the applicant is required to submit it to the DWR 401 &Buffer Permitting Branch. This form may be returned to DWR by the applicant,the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Is this a Public Transportation Project? rJ Yes r No USACE Permit# DWR Project#: 20191428 Version: 1 County: Duplin 401 Water Quality Certification Issued Date: 10/24/2019 Applicant: NCDOT Division 3 Project Name: Pipe Replacement SR 1546 Bill Sutton Road-Burial Waiver Request Supplemental Attachments: Click the upload button or drag and drop files here to attach docurrent SR 1546_401 Completion 1.19MB Form.signed.pdf FCF only Who will be submitting the Certification of Completion? r Applicant C' Agent r Certified Professional Agent's Certification ....................................................................................................................................................................................................................................................................................................................................................................................................... I, hereby state that,to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and specifications, and other supporting materials. 17 By checking the box and signing box below, I certify that: 0 I have given true,accurate, and complete information on this form; o I agree that submission of the"Certificate of Completion"form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit the"Certificate of Completion"form." Printed Name: Sean Farrell Signature !WC Water Resources ENVIRONMENTAL QUALITY PAT MCCRORY Governor DONALD R. VAN DER VAART secretary S. JAY ZIMMERMAN !),rector NCDWR Project No.: 20191428 County: Duplin Applicant: NCDOT - Division3 Project Name: NCDOT - Pipe Replacement SR 1546 Bill Sutton Road Burial Waiver Date of Issuance of 401 Water Quality Certification: 10/24/2019 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, Sean Farrell , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Digitally signed by Sean Farrell 12/29/2020 Date: 2020.12.29 13:01:55 -05'00' Date: Engineer's Certification Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permiee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date State of North Carolina (Environmental Quality I Water Resources 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Phone: 919-807-6300