HomeMy WebLinkAbout090203_30 Day POA_20201228 (2)PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number:
9-203
County: Bladen
Facility Name: Mr. Holmes Complex
Certified Operator Name: Victor Sultan Operator Number:
AWA26076
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon 6
Lagoon Name/ID: 2042 3082 3084 3086 3081 4205
5pillway(Y or N): N N N N N N
Level(inches): 15 15 19 25
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
K Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP_
Operation will be partially or fully depopulated.
`Attach a complete schedule with corresponding anirnal units and dates fro depopulation
`if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: as conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Murphy Brown, LLC Phone
Facility Owner/Manager (print)
M-1 C� Date:
Facility Owner/Manager (signature)
910-293-3434
12/28/2020
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: - ? r)$ I
fine m = 110- S-Ib PAN
2.
Structure ID: 389.2-- 3 o k,
line m = 1-1 1. v lb PAN
3.
Structure ID: 399r5-- yOs
fine m = lb PAN
4.
Structure ID: 3093
line m = lb PAN
5.
Structure ID: 3084
line m = 2701.7 lb PAN
6.
Structure ID: 3090
line m = lb PAN
'llctll
n.lines 1+2+3+4+5+6=
2•r6lb PAN
III. TOTAL
PAN BALANCE REMAINING FOR AVAILABLE CROPS
DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIFr] I'MIRINC; YNis An nnv p>=Rinn
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
o. application window'
H43
Wheat
120.01
45.52
5462,9
Sept -April
Al-12
Wheat
92.55
48.43
4482.2
Sept -April
A54-1
Small Grain
18.85
80.70
1521.2
Sept -April
A54-2
Small Grain
49.79
80.70
4018.1
Sept -April
H63
Wheat
61.54
99.10
6098.6
Sept -April
H64
Wheat
102.58
80.39
8246.4
Sept -April
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 29829.3 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
---x
w. Total PAN to be land applied (line n from section II) _ 1b. PAN
PoA (30 Day) 2/21/00