HomeMy WebLinkAbout310064_Sludge Survey_20201229ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANI£L SMITH
Director
Hobart B. Brinson
Brad Brinson Farm
PO Box 131
Chinquapin, NC 28521
Dear Hobart B. Brinson:
NORTH CAROLINA
Environmental Quality
December 29, 2020
Subject: Sludge Survey Testing Dates
Certificate of Coverage No. AWS310064
Brad Brinson Farm
Animal Waste Management System
Duplin County
The Division of Water Resources (Division) received your sludge survey information on
December 21, 2020. With the survey results, you requested an extension of the sludge survey
requirement for the three lagoons at the Brad Brinson Farm facility. Due to the amount of
treatment volume available, and the rate of sludge accumulation for the lagoon, the Division
agrees that a sludge survey is not needed until December 31, 2024 for all three lagoons.
The next sludge survey for the three lagoons at Brad Brinson Farm should be performed before
December 31, 2024. Please retain this letter and keep it with your farm records for reference.
Please call me at (919) 707-3665 if you have any questions.
Sincerely,
,��sssyyD��ocuSigned by:
�i�L2�R. l `RiLo�rtiR.
1697B2C85B414 8...
Miressa D. aroma
Animal Feeding Operations Program
cc: Wilmington Regional Office, Water Quality Regional Operations Section
Permit File AWS310064
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1 1636 Mail Service Center I Raleigh, North Carolina 27699-1636
N11H fH (:Ai(1!.INA �
0O'torenwm—talQ"I 919,707.9000