Loading...
HomeMy WebLinkAbout20100966 Ver 1_401 Application_20101110o?aF WATF,9pG O O O 9 6 6 O 'c Office Use Only: Corps action ID no. DWQ project no. Form Version 1.0 November 2008 Pre-Construction Notification (PCN) Form A. Applicant Information COURTESY 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 39 or General Permit (GP) number: 1c. Has the NW P or GP number been verified by the Corps? ® Yes ? No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ? No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1 h. Is the project located within a NO DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Henson Project Site 2b. County: Watauga 2c. Nearest" municipality / town: Boone 2d. Subdivision name: AT V N/A 2e. NCDOT only, T.I.P. or state project no: N/A pEyR lQ `?' . i7c 3. Owner Information t?i'r-1TR A I OR 4 3a. Name on Recorded Deed: - Lisa Silber 4 `'? ?j. '` "., '.• 3b. Deed Book and Page No. 1523/843 ??'?, ?' i''_;,`':• `;; 3c. Responsible Party (for LLC if applicable): Lisa Silber 3d. Street address: 5018 E. Karen Drive ,!- 3e. City, state, zip: Scottsdale, AZ 85254 3f. Telephone no.: 818.879.3151 3g. Fax no.. 3h. Email address: Page 1 of 12 PCN Form - Version 1.0 November 2008 Version B. Project Information and Prior Project History 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes ®No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. PCN Form - November 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number- Type of Type of wetland Forested (Corps - 404, Area of impact (acres) Permanent (P) or impact (if known) DWQ - non-404, other) Temporary T - W1 ®P ? T QualityLow /Urban ? Yes ID No a DWQ 0.099 W2 ? P ? T ? Yes ? No ? Corps ? DWQ W3 ? P ? T ? Yes ? No ? Corps ? DW Q W4 ? P ? T ? Yes ? No ? Corps ? DWQ W5 ? P ? T ? Yes ? No ? Corps ? DW Q W6 ? P ? T ? Yes ? No ? Corps ? DWQ 2g. Total wetland impacts 0.099 ac 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. Stream impact Type of Stream name Perennial (PER) or Average stream width (feet) Impact length number - impact intermittent (INT)? (linear feet) Permanent (P) or Temporary (T) S1 ? P ? T ? PER ? INT S2 ? P ? T ? PER ? INT S3 ?P?T ?PER ?INT S4 ? P ? T ? PER ? INT S5 ?P?T ?PER ?INT S6 ? P ? T ? PER ? INT 3g. Total stream and tributary Impacts 0 3h. Comments: The -133 linear feet of Hodges Creek will be avoided during all ground-disturbing activities. Page 5 of 12 PCN Form - Version 1.0 November 2008 Version C. Proposed Impacts Inventory, continued 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all o en water impacts below. 4a. 4b. 4c. 4d. 4e. Open water impact number Name of waterbody Type of impact Waterbody type Area of impact (acres) - Permanent (if (P) or applicable) Temporary 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 0 impacts 4g. Comments: 2 PCN Form - November 2008 Version Proposed Impacts Inventory, continued 5. Pond or Lake Construction If and or lake construction pro osed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or (acres) number purpose of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 0 impacts 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ®No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then ou MUST fill out Section D of this form. 6a. ? Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact (square Zone 2 impact Permanent (P) for impact Stream name mitigation feet) (square feet) or Temporary required? T 131 ?P?T ?Yes ?No B2 ? PEI T ? Yes ? No B3 ?P?T ?Yes ?No 6h. Tota l buffer impacts 6i. Comments: Page 7 of 12 PCN Form - November 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The proposed work and associated impacts are intended create a commercial site, while minimizing impacts to aquatic resources. All disturbed areas will be immediately seeded upon completion (temporary & permanent seed + straw) and stabilized. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. All heavy equipment will be kept out of the stream during project construction. No hydraulic leaks will be tolerated on equipment working in or around the project area. . 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: warm, cool, cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h.. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 8 of 12 PCN Form - Version 1.0 November 2008 Version D. Impact Justification and Mitigation, continued 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone Reason for Impact Total impact (square feet) Multiplier Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 6c. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6d. Comments: PCN Form - November 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ? Yes ® No 1 b. If yes, then is a diffuse flow plan included? ? Yes ? No 2. Determination if the Project Requires a Stormwater Management Plan 2a. Does the project require a Non-404 Jurisdictional General Permit? ? Yes ® No 2b. Is the project subject to General Certification 3704 or 3705? ? Yes ® No 3. Determination of Stormwater Review Jurisdiction 3a. Is this project subject to any of the following state-implemented stormwater management programs (check all that apply)? ? Coastal counties ? HQW ? ORW If so, attach one copy of the approval letter from the DWQ and one copy of the ? Session Law 2006-246 approved stormwater management plan. ? Other: 3b. In which local government's jurisdiction is this project? Boone, NC 3c. Is this local government certified to implement a state stormwater program? ? Yes ® No If so, attach one copy of the approval letter from the local government and one copy of the approved stormwater management plan (or one copy of the approved Stormwater management plan stamped as approved). 4. Information Required for DWQ 401 Unit Stormwater Review 4a. What is the overall percent imperviousness according to the most current site plan? -0%- Car lot will be ravelled. 4b. Does this project contain any areas that meet the criteria for "high density" per General Certifications 3704 and 3705? ? Yes ® No 4c. If the site is over 24% impervious and/or contains high density areas, then provide a brief narrative description of the stormwater management plan. N/A 4d. Has a completed BMP Supplement Form with all required items been submitted for each stormwater BMP? ? Yes ® No Page 10 of 12 PCN Form - Version 1.0 November 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the El Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ? Yes ? No letter.) Comments: N/A 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): N/A 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in El Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. No future impacts are proposed to on-site jurisdictional areas. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A PCN Form - Version 1.0 November 2008 Version F. Supplementary Information, continued 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ? No impacts? El Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ® Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? BFEC contacted Bryan Tompkins with US Fish and Wildlife Service who has indicated that no Federal species of concern will be impacted as a result of the project. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential.fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA -- Office of Habitat Protection Division 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? North Carolina Historic Preservation Office - Renee Gledhill Early has received the site information and has responded with no reservations concerning cultural resources (see attached letter). 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b. If yes, explain how project meets FEMA requirements: This project proposes no impacts to the FEMA floodplain. Be. What source(s) did you use to make the floodplain determination? Property Survey Glen Henson 9/30/2010 Applicant/Agent's Printed Name Applicant/ gent's Signature (Agent's signature is valid only if an authorization letter from the applicant Date is provided.) Page 12 of 12 PCN Form - November 2008 Version rlro, ik--;41 � IN ij 17 00° 161 86° 163 33° 1675 00° 'f ? / ',',`'--'#!-'?i ?-/• sG 1 Cam:-•- .,. ?r_? . _:,?- , ,` ?,., ? ,,,,\??` 1•,?,?,., Alk" . - _?, .y .•1..:x.1: ` ••. •.:..• f . t• ? .) 66) 1 ,? (( W t4? \ ?. ? f. \? 1 ` •? egrlJ , ? ?1 ??• ' r?al10/ Z- ? I •220 . Y•• -J . ?? w ,y -?? -Z u beach s.d -` ??. • ' - C-1 t ? ? ? olJ/J? rl >> ? .S.?t? ???? ?ileld ? : •, ? 1? ?I ' ? - Z- ? (//t r Ci\ , 11 1 \1 II4 like U: ?? ,• •? ••t `•./` ?' 11' 1? - co tiu1 Ill 1 Ilo?.,./?? 1 • 1 C-? ,+ ?.\ ` k? ,,1• 1 j? C co) l co) -j c i ^ ? ,? 1'` ?`.'? . gyp' `` 1•? ?? ?'_ - BM I-46 • -3 1 Z- N -Z (CL co 51, ? 'r+ em !fir\ri , - J ( ' i S Q I f ; Q ll' / ? ? ji? -''?,.J1'1 ?) _:$' ? `•?...?I ?,.J 1, ? (?`i? 1, ? ? f- _ >>;?\.?_-_-'?'j ? .(. /•. ?' -`° -- W71301 17 r 0&4 1.6 1 6 1.6 3 3 3 1.6 6 0 0 Name: BOONE Location: 036.2072885° N 081.6862936° VV Date: 10/14/2010 Caption: Henson Site Location Map -Scale:-l-inch-equals-1333-fee - - -- - Copyright (C) 1998, Maptech, Inc.