HomeMy WebLinkAbout20201434 Ver 1_401 Application_20201223 (3)II U�
/ �//
Meuse River��
I�— EFFLUENT 13
I_ DISCHARGE
SITE
IMP T \^�
141 1 C� � �� IM E N
DISCHARGE AR M
PIPE IMP CT
CADE r AERATOR AR L —
��� �) I ACT
IMPACT ° REA K IMPACT
swift Creed �� AREA J AREA I IMPA T
�i IMPACT
AREAG
IMPACT AREA H
� \
........... .• p--
��i AREA F ACCESS
ROAD
y EFFLUENT
�� -i AREA O \ FORCE
MAIN
l � Q-
7 ----
GCE (37
M dd/e CreeK
IMPACT j AREA E — —_ 1Ap`1N �pN�
L
0
RC AEA D
Al
Q z
\ anch �i - Y
U
IMPACT�� IMPACT
4 MGD // � AREA B AREA C
WWTF IMPACT --_�
SITE REA A
1 Ct
F I
0
_ i /\ �° I
COUNTY HOME RD
� � L
FIGURE 1: OVERALL IMPACT AREA MAP
0 0.2 0.4 Hazen WETLAND, STREAM, AND BUFFER IMPACT MAPS
mommomE== Mile 210 WASTEWATER TREATMENT FACILITY
_ OHN�TON (UNTYJ EFFLUENT FORCE MAIN
1 inch = 0.4 mile NORTH•CAROLINA Johnston County, North Carolina
PERMANENT WETLAND IMPACT / CONVERSION ICI EFFLUENT FORCE MAIN
TEMPORARY WETLAND IMPACT / CONSTRUCTION /\/ LIMITS OF DISTURBANCE
20' MAINTAINED CORRIDOR
NEUSE RIVER BUFFER
JURISDICTIONAL STREAM
JURISDICTIONAL WETLAND
W1-T - RIVERINE SWAMP FOREST
TEMPORARY IMPACT"'
DURING CONSTRUCTION L
(DEPICTED ON FIGURES
2AND 3)'
_V _EWM_f F21R
JS-'
'"—;III
' STREAM LOSES CHANNELIZATION'
AND FLOWS OVERLAND
THROUGH-RIVERINE SWAMP FOREST WETLAND
Aim
W1: RIVERINE SWAMP FOREST',���
TOTALS FOR IMPACTS TO W1 - W1 IS DEPICTED ON FIGURES 2 AND 3
W1-T = 0.03 AC -TOTAL TEMPORARY IMPACT DURING CONSTRUCTION
W1-P = 0.06 AC - TOTAL PERMANENT IMPACT FROM CONVERSION��
W1-P - RIVERINE SWAMP FOREST
CONVERSION IMPACT FOR
MAINTAINED ACCESS CORRIDOR
(DEPICTED ON FIGURES 2 AND 3)
FIGURE 2 : IMPACT AREA A
0 20 40 Hazen WETLAND, STREAM, AND BUFFER IMPACT MAPS
NFeet 210 WASTEWATER TREATMENT FACILITY
1 inch = 40 feet _ OHN�ION UNTYJ f. EFFLUENT FORCE MAIN
NORTH•CAROLINA,. Johnston County, North Carolina
PERMANENT WETLAND IMPACT / CONVERSION
TEMPORARY WETLAND IMPACT / CONSTRUCTION
I' L
JL
^� EFFLUENT FORCE MAIN
LIMITS OF DISTURBANCE
20' MAINTAINED CORRIDOR
J NEUSE RIVER BUFFER
JURISDICTIONAL STREAM
C3 JURISDICTIONAL WETLAND
,STREAM LOSES CHANNELIZATION
/ AND FLOWS OVERLAND THROUGH
A RIVERINE SWAMP FOREST WETLAND
1
JLJLI'III
�IvRIN2v1nO1 S;
JL JL t JLJLJLJ JLJLJL ---------
-1 1 1 JL I JL JL -------
-�L' JL -1 1 1 JL . 1- -1 -
S _
-1 1- -! JL I I I
r W1-P - RIVERINE SWAMP FOREST
CONVERSION IMPACT FOR
MAINTAINED ACCESS CORRIDOR
(DEPICTED ON FIGURES 2 AND 3)
IL 'L !' I_ It JL
IL L IL
IL L IL
----------------
-------------
W1-T - RIVERINE SWAMP FOREST
TEMPORARY IMPACT
DURING CONSTRUCTION
(DEPICTED ON
FIGURES 2 AND 3)
W1: RIVERINE SWAMP FOREST
TOTALS FOR IMPACTS TO W1 - W1 IS DEPICTED ON FIGURES 2 AND 3
W1-T = 0.03 - TOTAL TEMPORARY IMPACT DURING CONSTRUCTION
W1-P = 0.06 - TOTAL PERMANENT IMPACT FROM CONVERSION
FIGURE 3 : IMPACT AREA B
0 20 40 Hazen WETLAND, STREAM, AND BUFFER IMPACT MAPS
NFeet 210 WASTEWATER TREATMENT FACILITY
1 inch = 40 feet _ OHN�ION UNTYJ f. EFFLUENT FORCE MAIN
NORTH•CAROLINA,. Johnston County, North Carolina
TEMPORARY OPEN WATER IMPACT / CONSTRUCTION ICI EFFLUENT FORCE MAIN
TEMPORARY STREAM IMPACT / CONSTRUCITON LIMITS OF DISTURBANCE
JURISDICTIONAL STREAM
OPEN WATER
I®\q
S1 - INTERMITTENT STREAM
NON -BLUE LINE STREAM
TEMPORARY IMPACT
DURING CONSTRUCTION
EXISTING
RECLAIMED
WATER
PIPE
01 - MAN-MADE POND
TEMPORARY IMPACT
DURING CONSTRUCTION
01 - MAN-MADE POND
0.01 AC - TEMPORARY IMPACT DURING CONSTRUCTION
S1 - INTERMITTENT STREAM
NON -BLUE LINE STREAM
40 FT - TEMPORARY IMPACT DURING CONSTRUCTION
FIGURE 4 : IMPACT AREA C
0 20 40 Hazen WETLAND, STREAM, AND BUFFER IMPACT MAPS
NFeet 210 WASTEWATER TREATMENT FACILITY
1 inch = 40 feet _ OHN�ION UNTYJ f. EFFLUENT FORCE MAIN
NORTH•CAROLINA,. Johnston County, North Carolina
® ZONE 1 PERMANENT BUFFER IMPACT / MAINTAINED CORRIDOR EFFLUENT FORCE MAIN
® ZONE 2 PERMANENT BUFFER IMPACT / MAINTAINED CORRIDOR LIMITS OF DISTURBANCE
® ZONE 1 TEMPORARY BUFFER IMPACT / CONSTRUCTION 15' MAINTAINED CORRIDOR
* + ZONE 2 TEMPORARY BUFFER IMPACT / CONSTRUCTION J NEUSE RIVER BUFFER
TEMPORARY STREAM IMPACT / CONSTRUCITON JURISDICTIONAL STREAM
JURISDICTIONAL WETLAND
---
0 IJLJLJLe \
JL JL JL JL JL
-1 JL JL '
EXISTING ; JL - JL\
{ S2 - PERENNIAL STREAM
RECLAIMED ; \ JL JL I JL JL JL\ 1 TEMPORARY IMPACT
WATER
\- JL'�.� ', JL JL J JL JL JL 1 11 DURING CONSTRUCTION
JL JL
CULVERT
I
B1-FORESTED BUFFER
TEMPORARY IMPACT TO
BUFFER ZONES 1 AND 2
DURING CONSTRUCTION
+ . ��� * + * \ B2 - FORESTED BUFFER
* + + \ PERMANENT IMPACT TO
BUFFER ZONES 1 AND 2
pFt\PN \ \ FOR MAINTAINED ACCESS
�CORRI DOR
+*++* F FZE \ \1
S2 - PERENNIAL STREAM
35 FT - TOTAL TEMPORARY IMPACT DURING CONSTRUCTION
131 - FORESTED BUFFER
TEMPORARY IMPACT DURING CONSTRUCTION
1188 SF - TOTAL TEMPORARY IMPACT TO ZONE 1 2
1026 SF - TOTAL TEMPORARY IMPACT TO ZONE 2
B2 - FORESTED BUFFER
PERMANENT IMPACT FOR MAINTAINED ACCESS CORRIDOR 1 1
905 SF - TOTAL PERMANENT IMPACT TO ZONE 1 I I
633 SF - TOTAL PERMANENT IMPACT TO ZONE 2 I I
FIGURE 5 : IMPACT AREA D
0 20 40 Hazen WETLAND, STREAM, AND BUFFER IMPACT MAPS
NFeet 210 WASTEWATER TREATMENT FACILITY
1 inch = 40 feet _ OHN�ION UNTYJ f. EFFLUENT FORCE MAIN
NORTH•CAROLINA,. Johnston County, North Carolina
ZONE 2 TEMPORARY BUFFER IMPACT / CONSTRUCTION
B3 - NON -FORESTED BUFFER
TEMPORARY IMPACT TO
BUFFER ZONE 2 DURING
CONSTRUCTION
B3 - NON -FORESTED BUFFER
TEMPORARY IMPACT DURING CONSTRUCTION
1252 SF - TOTAL TEMPORARY IMPACT TO ZONE 2
^� EFFLUENT FORCE MAIN
LIMITS OF DISTURBANCE
J NEUSE RIVER BUFFER
JURISDICTIONAL STREAM
.7
� _ _ CULVERT
FIGURE 6 : IMPACT AREA E
0 20 40 Hazen WETLAND, STREAM, AND BUFFER IMPACT MAPS
NFeet - 210 WASTEWATER TREATMENT FACILITY
1 inch - 40 feet--G�OHN_ ON UN� EFFLUENT FORCE MAIN
NORTH•CAROLINA Johnston County, North Carolina
TEMPORARY WETLAND IMPACT / CONSTRUCTION EFFLUENT FORCE MAIN
LIMITS OF DISTURBANCE
CZ JURISDICTIONAL WETLAND
EXISTING
RECLAIMED
W2-T - NON -FORESTED WETLAND WATER
TEMPORARY IMPACT DURING CONSTRUCTION PIPE
(DEPICTED ON FIGURES 7, 8, 9, AND 10)
EXISTINQ MAIN I IJED C0RRIQOR
b b b
�L �L I I I I I I I �L �L �L �L �L �L �L �' JL I I I I I t I I I I
JL JL I I I IL -11 1 1 1 1 1 1 1 1, 1 1 JL JL JL 1; �L I I I I I I I I I-. jL- I
J� �L �L �L �L �L �LOR STEDJWJLAL DAL I jL jL 1L ,�L jL jL jL jL �' jL I I I �L �L �L �L �L �L �L �L
�L �L
W2-T - NON -FORESTED WETLAND (EXISTING MAINTAINED EASEMENT)
TOTAL FOR IMPACT TO W2 - W2 IS DEPICTED ON FIGURES 7, 8, 9, AND 10
0.491 AC - TOTAL TEMPORARY IMPACT DURING CONSTRUCTION
0 20 40
Hazen
FIGURE 7 : IMPACT AREA F
WETLAND, STREAM, AND BUFFER IMPACT MAPS
NFeet
1 inch = 40 feet
_ OHUNTYJ f.
210 WASTEWATER TREATMENT FACILITY
EFFLUENT FORCE MAIN
NORTH•CAROLINA,.
Johnston County, North Carolina
TEMPORARY WETLAND IMPACT / CONSTRUCTION EFFLUENT FORCE MAIN
LIMITS OF DISTURBANCE
CZ JURISDICTIONAL WETLAND
W2-T - NON -FORESTED WETLAND EXISTING
TEMPORARY IMPACT DURING CONSTRUCTION RECLAIMED
(DEPICTED ON FIGURES 7, 8, 9, AND 10) WATER
PIPE
I
I I I I',JL JL �, 11L'I I I I I I ICI I I I I I I I I �L 1l I I I I I I I
IIIIILILIIIaJLJLJLJLtIIJLIIIIIIJLIII1";lI I I I I I I
I I I jL jLjL j� 1 1 jLFQ,RE,STT TT�Ay jL I I I� I I I I I I",
I��C,IJL�( JLJLII�L'JLJLJL�JLL�JLLJLJLL�JLLJLJLIIII I I I I I�L
W2-T - NON -FORESTED WETLAND (EXISTING MAINTAINED EASEMENT)
TOTAL FOR IMPACT TO W2 - W2 IS DEPICTED ON FIGURES 7, 8, 9, AND 10
0.491 AC - TOTAL TEMPORARY IMPACT DURING CONSTRUCTION
0 20 40
Hazen
FIGURE 8 : IMPACT AREA G
WETLAND, STREAM, AND BUFFER IMPACT MAPS
NFeet
1 inch = 40 feet
_ OHUNTYJ f.
210 WASTEWATER TREATMENT FACILITY
EFFLUENT FORCE MAIN
NORTH•CAROLINA,.
Johnston County, North Carolina
TEMPORARY WETLAND IMPACT / CONSTRUCTION EFFLUENT FORCE MAIN
LIMITS OF DISTURBANCE
CZ JURISDICTIONAL WETLAND
W2-T - NON -FORESTED WETLAND
EXISTING TEMPORARY IMPACT DURING CONSTRUCTION
RECLAIMED (DEPICTED ON FIGURES 7, 8, 9, AND 10)
WATER
PIPE
I
17 _7
EXISTING MAtNTAINEP CQRRIDQR
�L �L �L �L �L �L �L �L I I I TR�LS,TID�WE�LA�ID�' JL'I �.
,-
�L
�L �L
W2-T - NON -FORESTED WETLAND (EXISTING MAINTAINED EASEMENT)
TOTAL FOR IMPACT TO W2 - W2 IS DEPICTED ON FIGURES 7, 8, 9, AND 10
0.491 AC - TOTAL TEMPORARY IMPACT DURING CONSTRUCTION
0 20 40
Hazen
FIGURE 9 : IMPACT AREA H
WETLAND, STREAM, AND BUFFER IMPACT MAPS
NFeet
1 inch = 40 feet
_ OHUNTYJ f.
210 WASTEWATER TREATMENT FACILITY
EFFLUENT FORCE MAIN
NORTH•CAROLINA,.
Johnston County, North Carolina
® ZONE 1 TEMPORARY BUFFER IMPACT / CONSTRUCTION ~ EFFLUENT FORCE MAIN
* + ZONE 2 TEMPORARY BUFFER IMPACT / CONSTRUCTION /1V LIMITS OF DISTURBANCE
TEMPORARY WETLAND IMPACT / CONSTRUCTION NEUSE RIVER BUFFER
JURISDICTIONAL STREAM
JURISDICTIONAL WETLAND
EXISTING
+ +
RECLAIMED
++
+++
/ WATER
/
O
/ PIPE
+
/ S3 - JURISDICTIONAL DITCH
++*
DEPICTED ON FIGURES 10, 11, 12 AND 13)
='
+ U
/ / IMPACT IS ON FIGURE 13
+
+
1, * *
+ +
Q
/
I + +
2
I 1
�* +'+
G9
I I
_ *+*+
2
I I
"
I
*+ ++�
*
;;
I
I I W2-T - NON -FORESTED WETLAND
+
"'_ __
I EXISTING MAINTAINED CORRIDOR
' +++
I I TEMPORARY IMPACT DURING CONSTRUCTION
++ +
I I (DEPICTED ON FIGURES 7, 8, 9, AND 10)
+++
I I
+
* +
I B4 - NON -FORESTED BUFFER
+
I TEMPORARY IMPACT TO BUFFER
* + +
I ZONES 1 AND 2 DURING CONSTRUCTION
I
+ + *
+ +
-
I (DEPICTED ON FIGURES 10, 11, 12 AND 13)
I ---
I IL , ZONE
2
ZONE 1
1
1 I I I
I
I
I
1,
I 1 I I
I 1
1 1 W2-T - NON -FORESTED WETLAND
1 1 " 0.491 AC - TOTAL TEMPORARY IMPACT DURING CONSTRUCTION
1 1 W2 IS DEPICTED ON FIGURES 7, 8, 9, AND 10
1 1
I I B4 - NON -FORESTED BUFFER
I , TOTAL FOR IMPACT TO B4 - B4 IS DEPICTED ON FIGURES 10, 11, 12, AND 13
1 \
\ e TEMPORARY IMPACT DURING CONSTRUCTION
\ e 25980 SF - TOTAL TEMPORARY IMPACT TO ZONE 1
11310 SF - TOTAL TEMPORARY IMPACT TO ZONE 2
FIGURE 10: IMPACT AREA
0 20 40 Hazen WETLAND, STREAM, AND BUFFER IMPACT MAPS
NFeet OHN210 WASTEWATER TREATMENT FACILITY
�i'ON UN
1 inch = 40 feet - EFFLUENT FORCE MAIN
NORTH•CAROLINA Johnston County, North Carolina
® ZONE 1 TEMPORARY BUFFER IMPACT / CONSTRUCTION
* + ZONE 2 TEMPORARY BUFFER IMPACT / CONSTRUCTION
^V EFFLUENT FORCE MAIN
LIMITS OF DISTURBANCE
J NEUSE RIVER BUFFER
JURISDICTIONAL STREAM
JURISDICTIONAL WETLAND
B4 - NON -FORESTED BUFFER
TOTAL FOR IMPACT TO B4 - B4 IS DEPICTED ON FIGURES 10, 11, 12, AND 13
TEMPORARY IMPACT DURING CONSTRUCTION
25980 SF - TOTAL TEMPORARY IMPACT TO ZONE 1
11310 SF - TOTAL TEMPORARY IMPACT TO ZONE 2
EXISTING
RECLAIMED
WATER
PIPE
WOPI.A
B4 - NON -FORESTED BUFFER +
TEMPORARY IMPACT TO BUFFER*+*
ZONES 1 AND 2 DURING CONSTRUCTION * • * + * + * + *-+ * + * + * +
(DEPICTED ON FIGURES 10, 11, 12 AND 13)
'+ +
_-
++++ _____----_----- -_
+++++ ��pp --
le
�� ++*+ pG� '`- ----------------------
i + + +
i * * P�
♦ �
f �
I �
I �
I
I �
i
S3 - JURISDICTIONAL DITCH
♦ Oil, (DEPICTED ON FIGURES 10, 11, 12 AND 13)
♦/ ��i IMPACT IS ON FIGURE 13
FIGURE 11: IMPACT AREA J
0 20 40 Hazen WETLAND, STREAM, AND BUFFER IMPACT MAPS
NFeet - 210 WASTEWATER TREATMENT FACILITY
1 inch - 40 feet _ OHN�iON UNTYJ EFFLUENT FORCE MAIN
— NORTA•CAROLINA Johnston County, North Carolina
® ZONE 1 TEMPORARY BUFFER IMPACT / CONSTRUCTION EFFLUENT FORCE MAIN
* + ZONE 2 TEMPORARY BUFFER IMPACT / CONSTRUCTION LIMITS OF DISTURBANCE
J NEUSE RIVER BUFFER
JURISDICTIONAL STREAM
B4 - NON -FORESTED BUFFER
TOTAL FOR IMPACT TO B4 - B4 IS DEPICTED ON FIGURES 10, 11, 12, AND 13
TEMPORARY IMPACT DURING CONSTRUCTION
25980 SF - TOTAL TEMPORARY IMPACT TO ZONE 1
11310 SF - TOTAL TEMPORARY IMPACT TO ZONE 2
/
/
/
/
/
/
/
/
B4 - NON -FORESTED BUFFER / +
TEMPORARY IMPACT TO BUFFER / +
ZONES 1 AND 2 DURING CONSTRUCTION / +-
(DEPICTED ON FIGURES 10, 11, 12 AND 13)
EXISTING /
RECLAIMED // + + +
WATER / +++'
PIPE
/ +*
+++;/
- - / ++++++
*+*++++++++t+ + / ++++* G
---_---- + +-
++++++++ + +f++
+ +- + + + + + +_- - + + /
+ +- + + + + -
+++++++++++++
-----------------------
T.ING Mg -IN TA1NEp AREA - �7
=»__ -
_ - /
________ -----
_________________________
------ -
-/
------ ------
— — — - — /
i
S3 - JURISDICTIONAL DITCH
(DEPICTED ON FIGURES 10, 11, 12 AND 13)
IMPACT IS ON FIGURE 13
FIGURE 12: IMPACT AREA K
0 20 40 Hazen WETLAND, STREAM, AND BUFFER IMPACT MAPS
NFeet 210 WASTEWATER TREATMENT FACILITY
1 inch = 40 feet _ OHN�ION UNTYJ f. EFFLUENT FORCE MAIN
NORTH•CAROLINA,. Johnston County, North Carolina
® ZONE 1 TEMPORARY BUFFER IMPACT / CONSTRUCTION
* * ZONE 2 TEMPORARY BUFFER IMPACT / CONSTRUCTION
TEMPORARY STREAM IMPACT/CONSTRUCITON
ACCESS ROAD
EXISTING
RECLAIMED i
WATER
PIPE
2 /
B4 - NON -FORESTED BUFFE-2 /
TEMPORARY IMPACT TO (IFFER /
ZONES 1 AND 2 DURING CONSTRUCTION
(DEPICTED ON FIGURES 10, 11, 12 AND 13)
^� EFFLUENT FORCE MAIN
LIMITS OF DISTURBANCE
NEUSE RIVER BUFFER
JURISDICTIONAL STREAM
B4 - NON -FORESTED BUFFER
TEMPORARY IMPACT TO BUFFER
ZONES 1 AND 2 DURING CONSTRUCTION
(DEPICTED ON FIGURES 10, 11, 12 AND 13)
♦ / S3 - JURISDICTIONAL DITCH
mor
TEMPORARY IMPACT DURING CONSTRUCTION
(DEPICTED ON FIGURES 10, 11, 12 AND 13)
♦ ♦♦ S3 - JURISDICTIONAL DITCH
♦ ♦ TOTAL FOR IMPACT TO S3 - S3 IS DEPICTED ON FIGURES 10, 11, 12 AND 13
♦ ♦♦ 149 FT - TOTAL TEMPORARY IMPACT DURING CONSTRUCTION
♦�" ♦ B4 - NON -FORESTED BUFFER
♦ ♦♦ TOTAL FOR IMPACT TO B4 - B4 IS DEPICTED ON FIGURES 10, 11, 12, AND 13
♦♦ ♦♦ TEMPORARY IMPACT DURING CONSTRUCTION
♦♦ .♦ 25980 SF - TOTAL TEMPORARY IMPACT TO ZONE 1
♦♦ 11310 SF - TOTAL TEMPORARY IMPACT TO ZONE 2
FIGURE 13: IMPACTAREA L
0 20 40 Hazen WETLAND, STREAM, AND BUFFER IMPACT MAPS
NFeet - 210 WASTEWATER TREATMENT FACILITY
1 inch - 40 feet--G�OHN_ ON UN� EFFLUENT FORCE MAIN
NORTH•CAROLINA Johnston County, North Carolina
PERMANENT WETLAND IMPACT / CONVERSION EFFLUENT DISCHARGE PIPE
TEMPORARY WETLAND IMPACT / CONSTRUCTION LIMITS OF DISTURBANCE
20' MAINTAINED CORRIDOR
JURISDICTIONAL WETLAND
IJLJLJLJLI,tJLJ JLJLJLJLIIII�,IIII I_�4-III
IJLJLJLJL1JLJLJ JL JL JL JL I I I I I 'I I I I--t I,III
JLJLJLJL t JLJLJLJLJLJL III II'III I', I
W3-T - BOTTOMLAND . JL JLJL JL JL JL JL J.1, JL JLI I ', I I' __t_)l ; I
HARDWOOD FOREST JL JLJL IL JL JL JL I I I I I I I I I I IL I I I I I' I& I
TEMPORARY IMPACT JL JL JL JL JL JL JL I TT�M� IJAF WIOIID F�OF EV I v,, jL I I I
DURING CONSTRUCTION
(DEPICTED ON FIGURES 14 AND 15) JL JL JL JL JL JL JL JL JL JL JL I I I
JL JL JL JL I I I I
IL I!
PIT
,TOVILANI HEAR W 1_2 TR�FS ,
JL JL JL JL JL JL JL J
W3-P - BOTTOMLAND HARDWOOD FOREST
CONVERSION IMPACT FOR
MAINTAINED ACCESS CORRIDOR
(DEPICTED ON FIGURES 14 AND 15)
W3 - BOTTOMLAND HARDWOOD FOREST
TOTAL FOR IMPACT TO W4 - W4 IS DEPICTED ON FIGURES 14 AND 15
W3-T = 0.067 AC - TOTAL TEMPORARY IMPACT DURING CONSTRUCTION
W3-P = 0.131 AC - TOTAL PERMANENT IMPACT FROM CONVERSION
FIGURE 14: IMPACT AREA M
0 20 40 Hazen WETLAND, STREAM, AND BUFFER IMPACT MAPS
NFeet 210 WASTEWATER TREATMENT FACILITY
Oxrr_ rr urr
—��� EFFLUENT FORCE MAIN
1 inch = 40 feet
NORTA•CAROLINA Johnston County, North Carolina
ON
ZONE 1 PERMANENT BUFFER IMPACT / MAINTAINED CORRIDOR ~ EFFLUENT DISCHARGE PIPE
ZONE 2 PERMANENT BUFFER IMPACT / MAINTAINED CORRIDOR LIMITS OF DISTURBANCE
ZONE 1 TEMPORARY BUFFER IMPACT / CONSTRUCTION 15' MAINTAINED CORRIDOR
ZONE 2 TEMPORARY BUFFER IMPACT / CONSTRUCTION
PERMANENT STREAM IMPACT / RIP RAP
PERMANENT WETLAND IMPACT / CONVERSION
TEMPORARY STREAM IMPACT / CONSTRUCITON
TEMPORARY WETLAND IMPACT / CONSTRUCTION
I
JLJL'-L -I
JL JL . - I ZONE 1
JL JL II14%
JL JL 11 -1
JL JL -11�-1
JLJL-1 A-1 t
ILIL-1-11�-1�
Ti
20' MAINTAINED CORRIDOR
30' TURNAROUND AREA
NEUSE RIVER BUFFER
JURISDICTIONAL STREAM
JURISDICTIONAL WETLAND
TOP OF BANK
RDINARY HIGH WATER
B5 - FORESTED BUFFER NEUSE RIVER
1 ZONE 2-TEMPORARY IMPACT DURING CONSTRUCTION
Y ('
B6-FORESTED BUFFER
ZONE 2-PERMANENT IMPACT FOR MAINTAINED ACCESS ROAD
II 1L ICI
. IL I
B7-FORESTED BUFFER
ZONE 1-TEMPORARY IMPACT DURING CONSTRUCTION
S4 - PERENNIAL STREAM - NEUSE RIVER
60 FT - TOTAL TEMPORARY IMPACT DURING
CONSTRUCTION INCLUDING COFFER DAM
S5 - PERENNIAL STREAM - NEUSE RIVER
30 FT - TOTAL PERMANENT IMPACT FROM
RIP RAP AREA BELOW DISCHARGE POINT
W3 - BOTTOMLAND HARDWOOD FOREST
TOTAL FOR IMPACT TO W4 - W4 IS DEPICTED ON FIGURES
14 AND 15
W3-T = 0.067 AC - TOTAL TEMPORARY IMPACT DURING
CONSTRUCTION
W3-P = 0.131 AC - TOTAL PERMANENT IMPACT FROM
CONVERSION
S4 - PERENNIAL STREAM - NEUSE RIVER
TEMPORARY IMPACT DURIJ CONSTRUCTION
INCLUDING COFFER DAM
S5 - PERENNIAL STREAM - NEUSE RIVER
PERMANENT IMPACT FROM RIP RAPAREA
BELOW DISCHARGE POINT
B8-FORESTED BUFFER
ZONE 1-PERMANENT IMPACT FOR MAINTAINED
ACCESS ROAD AND TURNAROUND AREA
W3-T - BOTTOMLAND HARDWOOD FOREST
TEMPORARY IMPACT DURING CONSTRUCTION
(DEPICTED ON FIGURES 14 AND 15)
W3-P - BOTTOMLAND HARDWOOD FOREST
CONVERSION IMPACT FOR
MAINTAINED ACCESS CORRIDOR
(DEPICTED ON FIGURES 14 AND 15)
B5 - FORESTED BUFFER
TEMPORARY IMPACT DURING CONSTRUCTION
305 SF - TOTAL TEMPORARY IMPACT TO ZONE 2
B6 - FORESTED BUFFER
PERMANENT IMPACT FOR ACCESS ROAD
304 SF - TOTAL PERMANENT IMPACT TO ZONE 1
B7 - FORESTED BUFFER
TEMPORARY IMPACT DURING CONSTRUCTION
749 SF - TOTAL TEMPORARY IMPACT TO ZONE 2
B8 - FORESTED BUFFER
PERMANENT IMPACT FOR MAINTAINED ACCESS
ROAD AND TURNAROUND AREA
720 SF - TOTAL PERMANENT IMPACT TO ZONE 1
FIGURE 15: IMPACT AREA N
0 20 40 Hazen WETLAND, STREAM, AND BUFFER IMPACT MAPS
NFeet TYJ 210 WASTEWATER TREATMENT FACILITY
1 inch = 40 feet ___OHNION _ UN(EFFLUENT FORCE MAIN
-t NORTH•C A ROL IN AU Johnston County, North Carolina
ACCESS ROAD
JURISDICTIONAL STREAM
JURISDICTIONAL PERENNIAL STREAM IS CULVERTED UNDER AN EXISTING DIRT ROAD
THAT WILL BE USED FOR AN ACCESS ROAD.
NO IMPROVEMENTS TO THE ACCESS ROAD OR CULVERT ARE PROPOSED.
EXISTING CULVERT
EXISTING DIRT ROAD
(TO BE USED FOR ACCESS)
FIGURE 16: IMPACTAREA O
0 20 40 Hazen WETLAND, STREAM, AND BUFFER IMPACT MAPS
NFeet - 210 WASTEWATER TREATMENT FACILITY
1 inch - 40 feet--G�OHN_ ON UN� EFFLUENT FORCE MAIN
NORTH•CAROLINA Johnston County, North Carolina