Loading...
HomeMy WebLinkAbout20201979 Ver 1_More Info Received_20201221Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑Public/Government ®Private/Community c. (i) Dock(s) and/or pier(s) (ii) Number 1 (iii) Length 613' (iv) Width 6' (v) Floating [-]Yes ®No e. (i) Are Platforms included? ®Yes ❑No If yes: (ii) Number 1 (iii) Length 22' (iv) Width 16' (v) Floating ❑Yes ®No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 2 (ii) Number of slips existing i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel ®Open water; no dredging required ❑Other; please describe: k• Typical boat length: 16' & 26' m. (i) Will the facility have tie pilings? ❑Yes ®No (ii) If yes number of tie pilings? El This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ®No d. (i) Are Finger Piers included? ❑Yes ®No If yes: (ii) Number (iii) Length (iv) Width (v) Floating ❑Yes ®No f. (i) Are Boatlifts included? ®Yes ❑No If yes: (ii) Number 2 (iii) Length 16' & 13' (iv) Width 13' & 12' h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ("wet slips") only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Open Runabout I. (i) Will the facility be open to the general public? ❑Yes ®No 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. C. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 3 of 4) m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ❑No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) El This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Government ®Private/Community (ii) Number 1 (iii) Length 32' (iv) Width 14' Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): b. Number ❑Commercial ❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. e. Arc of the swing 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 4 of 4) 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. 36' to the east & 20' to the west 2,850' to the east & 1,150' to the west Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 1,888' e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. d. Water depth at waterward end of structure at NLW or NWL : @ NLW 8. OTHER El This section not applicable a. Give complete description: The access pier will have an elevated portion (min. 6' above NHW & min. 6' in width) over the channel portion of the approx. 40' wide near shore slough which is approx. 8" to 10" deep at NLW. A covered 16' x 22' platform will be located between the boathouse and boatlift. 11 /4/20 Date Project Name Eric Pollard Applicant Name 9- 2.i Anant Applicant Signature 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Narrative As acting agent for Eric Pollard, who owns 110 Sea Level Lane, Sneads Ferry, in Onslow County, N.C, I am submitting the enclosed CAMA Major Permit Application for a proposed private docking facility adjacent to Alligator Bay off of the AIWW. Mr. Pollard would like to construct a new pier (6' x 613') including an elevated portion (min. of 6' in width and elevated 6' above NHW) over the channel portion of the existing near shore slough, a covered platform (16' x 22') which will be located in between a boathouse (14' x 32') on the west side and a 12' x 13' boatlift on the east side. The applicant is requesting a 14' x 32'boathouse which will contain a 13' x 16' boatlift in order to protect his new 26' (not including the motor) center console (with an 8" draft) from the elements. These structures are proposed to be located in existing water depths of approx. -2' @ NLW and would extend approx. 70' into Alligator Bay which measures approximately 1,888' at the location of the proposed project thus, conforming to the 1/4 width of the waterbody limitation and will not encroach into either of the adjacent 15' riparian corridor setbacks. Since the project meets the exceptions found in the NCDWR GC4175 the online Pre -Filing - Meeting -Request is not required. • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. Please feel free to contact me if you need any additional information or have any questions. ALLIGATOR BAY N C I i LEGEND CO 5• Q — oc Seibau 0 W L I OlbaUc Q / Marsh � 0I o 0i I i c= NLW Q I I = Portion to be Elevated i Proposed Propos�d `}- Bo �thouse Bollift1 O � I I I Eosedl i red I Platform "I - NLW Uplands NHW %! ' —r ------— Uplands j Marsh ,,.Marsh, .01 �. NHW - I i 1 / i -MATCH LINE' Sheet 3 of 5 I� MATCH LINE' Sheet 4 of 5 0 cn - Marsh, L� NHW NLW s ` .NLW- -Slough P NHW L P 100, Elliott Family L Eric Pollard Wilbur & Susan Bolin Living Trust 110 Sea Level Lane 106 Sea Level Lane 114 Sea Level Lane Sneads Ferry Sneads Ferry Sneads Ferry Eric Pollard 110 Sea Level Lane Sneads Ferry Onslow County Drawn By Debbie Wilson Revised 11 /4/20 Scale: 1" = 50' Sheet 2 Lof 5 N - � -ALLIGATOR BAY co o®= Marsh ..Q a) O=NLW M O = Water Depths 0 Relative to NLW -0 ,5 -�I IE--15 = Slip Numbers Setback ' I Setback v oProposed t U 0-21- Boathouse 2 , U l 14' -�,16' THn2l ' Q 22'2' I2 32' I -2' 1 2' INV Proposed Covered Platform 35' - NLW - NHW 4 — ,, - 14, Uplands i ' i Uplands i NHW F- . CD j= % Q_ Marsh,...,` ,Marsh z O " 6' i Match Line Sheet 2 of 5 Eric Pollard 110 Sea Level Lane Sneads Ferry Onslow County Drawn By Debbie Wilson Revised 11/4/20 Scale: 1" = 30' Sheet 4 of 5