Loading...
HomeMy WebLinkAboutNC0030210_Authorization to Construct_19920121MPDE:i DOCUWEMT SCANNIM6 COVER SHEET NPDES Permit: NC0030210 Charlotte / Mallard Creek WWTP Docum nt Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) Permit Modification Complete File - Historical Engineering Alternatives (EAA) Staff Comments Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: January 21, 1992 This dacumeat is printed on reuse paper -:ignore any coanteat on the reirerse side AOO1 10� State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management - 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor William W. Cobey, Jr., Secretary January 21, 1992 Mr. Joe C. Stowe, Jr., Director Charlotte -Mecklenburg Utility Department 5100 Brookshire Boulevard Charlotte, NC 28216 George T. Everett, PhD Director Subject: Permit No. NCO030210 Authorization to Construct Charlotte -Mecklenburg Utility Department Mallard Creek Wastewater Treatment Facility Mecklenburg County Dear Mr. Stowe: A letter of request for an Authorization to Construct was received November 12, 1991 by the Division and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the operation of the subject facility to provide for biological nutrient removal, the construction of centrifuge sludge thickening, a sludge storage area, a sludge conveyor, expanded sludge and gas storage, and all associated appurtenances with discharge of treated wastewater into Mallard Creek which is classified Class C waters in the Yadkin -Pee Dee River Basin. This Authorization to Construct is issued in accordance with Part III paragraph B of NPDES Permit No. NCO030210 issued June 8, 1990, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0030210. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Environmental Management. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. Regional Offices Asheville Fayetteville Mooresville Raleigh Washington Wilmington Winston-Salem 704/251-6208 919/486-1541 704/663-1699 919/733-2314 919/946-6481 919/395-3900 919/896-7007 Pollution Prevention Pays P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer The Mooresville Regional Office, phone no. 704/663-1699, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. �\ until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC 27626-0535. The subject wastewater treatment and disposal facilities shall be connected to an operational publicly owned wastewater collection system within 180 days of its availability to the subject facilities, if the subject wastewater treatment or disposal facilities are in noncompliance with the terms and conditions of the NPDES permit, the Authorization to Construct, or the governing statutes or regulations. Prior to the initiation of these connection activities, appropriate approval must be received from this Division. Upon classification of the facility by the Certification Commission, the Perminee shall employ a certified wastewater treatment plant operator to be in responsible charge of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to the classification assigned to the wastewater treatment facilities by the Certification Commission. Once the facility is classified, the Petmittee must submit a letter to the Certification Commission which designates the operator in responsible charge within thirty days after the wastewater treatment facilities are 50% complete. A copy of the approved plans and specifications shall be maintained on file by the Pertrrittee for the life of the facility. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Environmental Management in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Mr. Lindsay L. Mize telephone number 919/733- 5083. cc: Mecklenburg County Health Department Mooresville Regional Office, Water Quality Training and Certification Unit Facilities Assessment Unit 10� U ��� � �. � � � I Otte � •- ' ` "`1 ' ' 1 ` 00 awl�o•� �...i% l 40 ., �, l� ; � � Ali , .��.., ��\. � � ;�r �. , ; � - " 1' ` , , l /I , � � < ; . -• �—',r-= ; �, --•-' . �; ,, �,/ � • �_ i. � •` `�OO�� � , \. `\ems , � , . �1 \ � � � . � '• / �r >� _ - ` ate. l .l 1. �.�.. ,.� \„ � : / '�-`". ' I i+ -mil. M - •' , 1V • \ r � ` � ��!f I 1 • �'' . ` `,`--. �. \ �-' . 1 b00 L 1 �" � \ l't` •' � � �= s % '� �,i •'it'd „��/,J: � ., ; ( 1 J � �-� i �. Op fj ra Oslo 1 8 � � � • f `%1 ''/ � � %; lid/J �' � i ��� ; �'( -; ,I • ` ,� • / / -mow � ` / •' •' U `� . i� , ...,� l , t. /' � , �' \` � � , •. . To: Permits and Engineering Unit Water Quality Section Date: Novembe T19, 1991 AUTHORIZATION TO CONSTRUCT ' ,.,•. NPDES PERMIT REPORT AND RECOMMENDATIONS`.:County: Mecklenburg �' ' .� �;,•� NPDES Permit No.: NCO030210 PART I - GENERAL INFORMATION 1991 r•. , 1. Facility and Address: Mallard Creek WWTP Charlotte - Mecklenburgl Utility Dept. fr;yr, 5100 Brookshire Blvd. ~__ Charlotte, North Carolina 28216 2. Date ofiInvestigation: August 5, 1991 3. Report Prepared By: Kim H. Colson, Environmental Engineer I 4. Person Contacted and Telephone Number: Joe Alexander, Plant Chemist, (704) 547-0680 5. Discharge Point(s), List for all discharge Points: - Latitude: 3500191 52" Longitude: 80 41' 54" Attach a USGS Map Extract and indicate treatment plant site and discharge point on map. USGS Quad No.: F 16 SW USGS Quad Name: Harrisburg, NC r expansion and upgrading): There 6. Size (land available for p pg g) appears to be adequate land available for expansion and upgrading. 7. Topography (relationship to flood plain included): Flat to moderate slopes; the WWTP appears to be protected from the 100 year flood. 8. Location of Nearest Dwelling: None within 500 feet; however there are several housing developments under construction on the south side of Mallard Creek. ti r Page Two PART II - DESCRIPTION OF DISCHARGE AND TREATMENT WORKS 1. Type of Existing Treatment Facility: Existing treatment consists of an influent pump station, bar screen, primary clarifiers, trickling filters, first stage aeration, first stage clarifiers, second stage aeration, second stage clarifiers, effluent polishing lagoon, gas chlorination with contact 'basin, anaerobic sludge digestion, sludge drying beds, and standby power supply. 2. Type of Proposed Treatment Facility: Phase I (conversion to a single stage activated sludge process) under construction at the present time, will consist of mechanical screening, grit removal, additional primary clarification, new final clarifiers, effluent filters, and UV disinfection (with chlorine as backup disinfection). Phase II will consist of converting the operation of the WWTP to provide for biological nutrient removal (BNR), flow equalization (which will replace the polishing lagoon), expanded sludge and gas storage, centrifuge sludge thickening, and sludge loading area. 3. Sludge Handling and Disposal Scheme: Sludge is treated by anaerobic digestion and sludge drying beds. Final disposal is by land:application via Permit No. WQ0000057. 4. Treatment Plant Classification: Less than 5 points; no rating (include rating sheet). Class IV 5. SIC Code s : 4952 Wastewater Code(s): Primary: 01 Secondary: 36 Main Treatment Unit Code: 11503 PART III - EVALUATION AND RECOMMENDATIONS This Office has reviewed the plans and specifications for phase II of the permitted expansion (from 3.0 MGD to 6.0 MGD) at the subject facility, and has no objection to the issuance of the Authorization to Construct. Signature of Report Preparer Date Water Quali Regional Su rvisor Date f 0a, 4A&i) fi --- To: Permits and Engineering Unit Water Quality Section Date: August 12, 1991 NPDES STAFF REPORT AND RECOMMENDATIONS County: Mecklenburg NPDES Permit No.: NC003021'0 4 MRO No. 91-16 5' �''�``4 r• (EjjJ PART I - GENERAL INFORMATION AUG 1 S 1991 1. Facility and Address: Mallard Creek WWTP Charlotte - Mecklenburg i,UtIkd WRT BRANCH Department 5100 Brookshire Blvd. Charlotte, North Carolina 28216 2. Date of Investigation: August 51 1991 3. Report Prepared By: Kim H. Colson, Environmental Engineer I 4. Person Contacted and Telephone Number: Joe Alexander, Plant Chemist, (704) 547-0680 5. Directions to Site: From the intersection of US Hwy 29 and the US Hwy 29 and Interstate 85 connector road, travel northeast on US Hwy 29 approximately 1.6 miles. Turn right onto the,Mallard Creek WWTP entrance road. The WWTP is located at the end of the road. 6. Discharge Point(s), List for all discharge Points: - Latitude: 350 19' 52" Longitude: 80° 41' 54" Attach a USGS Map Extract and indicate treatment plant site and discharge point on map. USGS Quad No.: F 16 SW 7. Size (land available for expansion and upgrading): There appears to be adequate land available for expansion and upgrading. 8. Topography (relationship to flood plain included): Flat to moderate slopes; the WWTP appears to be protected from the 100 year flood. 9. Location of Nearest Dwelling: None within 500 feet; however there are several housing developments under construction on the south side of Mallard Creek. Page Two 10. Receiving Stream or Affected Surface Waters: Mallard Creek a. Classification: C b. River Basin and Subbasin No.: Yadkin - Pee Dee 030711 c. Describe receiving stream features and pertinent downstream uses: General "C" classification uses downstream. PART II - DESCRIPTION OF DISCHARGE AND TREATMENT WORKS 1. Type of Wastewater: 94% Domestic 6% Industrial a. Volume of Wastewater: 3.0 MGD (Design Capacity) 6.0 MGD (Proposed Expansion) b. Types and quantities of industrial wastewater: Primarily wastewater from the production of plastics materials and synthetic resins. C. Prevalent toxic constituents in wastewater: d. Pretreatment Program (POTWs only): Approved 2. Production Rates.(industrial discharges only) in Pounds: N/A 3. Description of Industrial Process (for industries only) and Applicable CFR Part and Subpart: N/A 4. Type of Treatment (specify whether proposed or existing): The existing treatment consists of an influent pump station, bar screens, primary clarifiers, trickling filters, first stage aeration, first stage clarifiers, second stage aeration, second stage clarifiers, effluent polishing lagoon, chlorine (gas) contact basin, anaerobic sludge digestion, sludge drying beds, and standby power supply. Proposed treatment will be implemented in two phases. Phase I will consists of mechanical screening, grit removal, additional primary clarification, single stage activated sludge process, new final clarifiers, effluent filters, and UV disinfection (with chlorine as backup disinfection). Phase II will consists of operation of the WWTP as a biological nutrient removal (BNR) plant, flow equalization (which will replace the polishing lagoon), expanded sludge and gas storage,, centrifuge sludge thickening, and sludge loading area. 5. Sludge Handling and Disposal Scheme: Sludge is treated by anaerobic digestion and sludge drying beds. Final disposal is by land application via Permit No. WQ00000057. 6. Treatment Plant Classification: Less than 5 points; no rating (include rating sheet). Class IV Page Three 7. SIC Code(s): 4952 Wastewater Code(s): Primary: 01 Secondary: 36 PART III - OTHER PERTINENT INFORMATION 1. Is this facility being constructed with Construction Grants Funds (municipals only)? No 2. Special monitoring requests: None 3. Additional effluent limits requests: None 4. Air Quality and/or Groundwater concerns or hazardous waste utilized at this facility that may.impact water quality, air quality or groundwater? Air Quality concerns should be obtained regarding the burn off of digester gas from the anaerobic digesters. There are no known Groundwater concerns nor is there any known Hazardous waste utilized at this facility. 5. Other: N/A PART IV - EVALUATION AND RECOMMENDATIONS The permittee, Charlotte - Mecklenburg Utility Department, has applied for permit renewal for the Mallard Creek WWTP. The WWTP is currently expanding from 3.0 MGD to 6.0 MGD. Phase I of the expansion process is under construction at the present time. Phase II of expansion will start shortly. The second downstream monitoring location is very difficult to access for the WWTP personnel. Downstream monitoring may need to be modified. If a residual chlorine limit is implemented, it is uncertain whether the WWTP could meet the limit without modification to the treatment process. This office recommends that the subject permit be renewed Signature of ReportPrreparer Date Water Quality REf4ional Supervisor D to D llwWffffr--K1 An x wil �0 �� t�1n