Loading...
HomeMy WebLinkAbout20041764 Ver 4_More Info Received_20101115 (2)C,=F1 KimleyHom and Associates, Inc. November 15, 2010 Ms. Natalie Landry NC Division of Water Quality (DWQ) 3800 Barrett Drive Raleigh, NC 27609 Re: DWQ Project #04-1764 VGr y Response to Notice of Violation 2010 WQ-0012 Shiloh Crossing Shopping Center Wake and Durham Counties, NC Dear Ms. Landry: G 4141h "e, ¦ 3001 Weston Parkway Cary, NC 27513 On behalf of Wal-Mart Stores East, LP (Wal-Mart) and Shiloh-Morrisville, LLC (Shiloh), Kimley-Horn and Associates, Inc. (KHA) is re-submitting the enclosed additional information originally provided on September 27, 2010 in response your letter dated June 28, 2010 regarding the above Notice of Violation. This submittal is intended to completely supersede the submittal made on September 27, 2010 and can be reviewed as such. In order to provide complete responses to all of the items listed in the subject NOV, the following are provided: 1) Detailed responses for item nos. 3, 4, 5, 6, 8, and 9 listed in the subject NOV and DWQ's subsequent response dated June 28, 2010. As requested, specific documentation, analysis, implementation plans, and schedule are proposed for each item with a goal of completely resolving each issue. 2) A Modification request for the WQC (DWQ #04-1764). For clarity and simplicity we are providing the Modification request with an updated PCN Application with the intent that any approval could be an addendum to the existing approval only addressing the additional items. The Modification request is primarily intended for the proposed impacts to Stream No. 1 below Shiloh Glenn Drive, as described herein, as well as to address the inadvertent impact to and proposed restoration of the Neuse riparian buffer at Stream Impact No. 2 below level spreader no. 4, as well as additional permanent buffer impacts as required for the extension of stormwater bypass channels at level spreaders 1 and 4 and Sediment Basin #7/Wetland E. 3) A revised Stormwater Management Plan to address two specific stormwater BMPs (Sediment Basin 2 and Wetland E). These BMPs were originally intended to be included as part of the Final Stormwater Management Plans for Phases II and III for DWQ Water Quality Certification (WQC) DWQ# 04- 1764 (See Stormwater Management Plans, following). Based on our understanding of the WQC, it will not be necessary to modify the WQC to ¦ TEL 919 677 2000 FAX 919 677 2050 CIIIIIIIIIIIIIIIIF1 KimleyHan and Associates, Inc. address this issue. However, written approval from DWQ for the Stormwater Management Plan is required to satisfy the requirements of the WQC. In regards to Pond A, we believe it will be possible to re-grade and replant the pond to match the approved Stormwater Management Plan for Phase I. Additionally, we also believe Level Spreader Nos. 1 to 4 substantially comply with the approved Stormwater Management Plan for Phase 1, except as described herein. The information presented here is intended to address the all of the items noted by DWQ. Once accepted in writing by DWQ, Wal-Mart and Shiloh will seek to implement the attached plans and modifications according to the proposed schedule. If you need any additional information, or if you have any questions, please do not hesitate to contact me at (704) 319-5698. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. GCS ??1? Austin L. Watts, P.E. Enclosures: Responses to DWQ's Requested Responses Request to Modify the WQC Figures Stormwater Manage Plans Appendix ? mmm? KimlandAssatiatesey-Horn , Inc. Memorandum To: Natalie Landry, Division of Water Quality From: Austin Watts, Kimley-Horn and Associates, Inc. Date: November 15, 2010 Subject: Additional Responses to Notice of Violation (NOV 2010 - WQ 0012) Shiloh Crossing The following responses are provided in addition to the responses provided by Wal- Mart dated April 30, 2010. These responses consider DWQ's Review of the Reponses to the NOV dated June 28, 2010 as well as feedback gathered at the meeting among Danny Smith and Natalie Landry of DWQ and Austin Watts and Todd St. John of KHA on May 26, 2010. The additional responses to the listed items from DWQ are in italics, below: Nos. 2 and 7) "Please provide documentation showing erosion and sediment control practices in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices." "Provide NPDES rainfall and BMP monitoring records for the temporary skimmer basin (Extended Detention Pond B) that is covered under the Division of Land Resources-Delegated Local Program Wake County Erosion and Sedimentation Control Permit program." Monitoring records are included via the CD attached to this submittal. Monitoring relative to Basin 2 (Wetland B) was discontinued once the overall site was stabilized( including areas immediately upstream of Basin 2). The monitoring records ceased during January 2010. No. 3) Existing stream dimensions must be maintained above and below locations of each culvert. Provide documentation showing that Stream Impact #1 culvert has been installed in such a manner that the original stream profiles are not altered above and below the culvert. a. Show that the culvert has not and will not cause aggradation or erosion of the stream up or down stream of the culvert. b. Show that the culvert provides for continuity of water movement and can adequately accommodate high water or flood conditions. The intent of the original culvert installation was to avoid altering the stream profile above and below the culvert and to allow aquatic life passage by placing the culvert 6" below the existing stream invert. In this situation, placing the culvert as described above resulted in the culvert being submerged because of a large bedrock outcrop immediately ¦ 3001 Weston Parkway Cary, NC 27513 TEL 919-677-2000 FAX 919-677-2050 below the culvert outlet. The submersion of the culvert has resulted in aggradation within and for about 15 to 20 feet above the culvert inlet. To resolve this issue it is proposed that a notch be provided in the bed rock in order to lower the stream invert, creating a situation where the culvert invert is 6" below the downstream streambed invert. Please seethe attached plans, documentation, and modeling results that support the proposed plan (Figures 1, 2, 3, and Appendix). The aggradation immediately above and within the culvert is caused by the fact that the culvert is submerged creating depositional conditions. Typically it is assumed a culvert will scour when the flow velocity within the culvert is 3 feet per second (fps) or greater, often referred to as the scour velocity. Under the existing (submerged) conditions the Shiloh Glen culvert will not reach a flow velocity of 3 fps when runoff discharges are less than 15 cubic feet per second (cfs). Most rain events will result in discharges less than 15 cfs within this system so sediment will tend to deposit in and around the culvert. The proposed plan would remove the submerged conditions, thereby reducing the discharge needed to reach the scour velocity from 15 cfs or greater to approximately 2.5 cfs. As such the sediment would naturally tend to transport downstream resulting significantly less aggradation. Also, it is anticipated that providing the notch in the bed rock will result in little to no change in stream functions for the impacted stream reach, since the current substrate is bed rock and the proposed substrate will also be bedrock. The current accumulation of sediment within the culvert will be removed and properly disposed of prior to notching the bedrock and only natural sediment bed loads will subsequently pass through. The table below summarizes the culvert performance under two different discharges and tail water conditions. The tail water conditions represented are the existing conditions versus the proposed conditions (cutting a notch in the bedrock downstream of the culvert). The discharges were selected to demonstrate the difference in culvert performance under the two tail water conditions. It is assumed that a 3 fps velocity would scour the pipe clean of sediment. In the proposed conditions (0.5 foot tail water) a discharge event that reaches 2.5 or greater cfs would scour the pipe clean of sediment. However, under the existing conditions (3 foot deep tail water) a much larger discharge event of 15 cfs is required to reach sour velocity according to the modeling results. In smaller, much more frequent discharge events (< 1 year return interval) as well as during the descending leg of larger events, the potential for aggradation within and around the culvert is relatively high in the existing versus the proposed conditions. As such, notching the bedrock to reduce the tail water condition to 0.5 feet would greatly reduce the potential for upstream aggradation that is occurring today. Upstream Conditions 30" RCP Shiloh Glenn Discharge Existing Conditions (3 ft tail water) Notched Bedrock (0.5 ft tail water) Depth (ft) Velocity (fps) Depth (ft) Velocity (fps) 2.5 cfs 2.4 0.51 0.52 3.4 15 cfs 2.6 3.1 1.3 5.8 It is also offered that the site be monitored the site for 3 years in order to document the stability of the system. The monitoring would include taking photos from the some vantage points, upstream, downstream, and at the culvert 2 times per year and submitting a brief memo to DWQ once per year documenting the results. Additionally, in the previous response documentation was provided supporting the fact that the existing system will not substantially alter stream functions as compared to the pre-existing conditions. In other words, the backwater created by the system only occurs at higher discharge rates and lasts less than an hour or two longer than a pre-existing conditions flood event. A reportfrom the geotechnical engineer was also provided indicating that the road and retaining wall system were designed to withstand temporary impoundment resulting from flood conditions. (The previous response is included in the Appendix.) Schedule to complete: Assuming cooperation from all parties, this can be completed by the end of February. No. 4) Provide documentation showing the as-built condition of the stormwater drainage system at Stream Impact #2 and provide documentation of appropriate buffer authorizations for existing impacts. The as-built conditions are depicted in figure 8 in gray. The buffer strip at level spreader 4 was inadvertently cleared during construction. It is proposed that the entire, cleared 50 foot Neuse buffer be replanted with native hardwood species as depicted in Figures 8 and 9. Level spreader 4 was designed assuming a completely forested filter strip. The plans also include a level spreader bypass channel that should resolve DWQ Response Item no. 9 as it relates to level spreader no. 4 as well. The proposed bypass channel is intended to segregate the bypass discharge from the diffuse flow in the buffer strip. Schedule to complete: Assuming cooperation from all parties, this can be completed by the end of February. No. 5) Provide a Plan that addresses non-diffuse flow in the Neuse Riparian Buffer Zones 1 and 2 for the entire site. Figures 4, 6 and 7 address the areas of Neuse buffer erosion (gullies) associated with the level spreaders, level spreader bypasses, and the outlet of Pond, as well as a small area of concentrated flow adjacent to the point where Shiloh Glenn Drive crosses Stream no. 1. The repair plans specifically address DWQ Response Item nos. 5 and no. 9 (Figures 4, 6 and 7). There is already an Operation and Maintenance Agreement (O&M) in place for these devices as part of the approved Phase I Stormwater Plan. Schedule to complete: Assuming cooperation from all parties, this can be completed by the end of February. No. 6) Provide documentation that shows the final stormwater management facilities for Phase 1 were constructed in accordance with the approved stormwater management plans received on May 15, 2007. Include in this documentation an As-Built for Wetland A, the wetland plantings and associated soil conditioning for Wetland A, and verification from the engineer that the fence on the spillway will not impede water flow or unduly block debris resulting in impeded water flow during a large rain event. The responses to item Nos. 4, 5, 6, and 9 document the instances where the stormwater management facilities were not constructed according to the approved stormwater management plans or where they are not performing to the intent of the plans. Each of the responses above proposes the remedy to address each issue noted in the above- listed items. In regards to Wetland A, based on the as-built survey provided by the contractor, it should be physically possible to bring Wetland A into compliance with the approved Phase 1 Stormwater Plan (See Figure 5). Figure 5 depicts the as-built survey contours in blue overlain with the approved plans contours in red. It is proposed that the contours between elevation 361 and 354 could be re-graded to substantially achieve 3:1 side slopes. Side slopes above the 361 contour adjacent to the retaining wall and the development to the north should not be considered as part of the Wetland A BMP, and as such, could be steeper than 3:1. In order to bring the pond bottom into compliance with DWQ requirements, top soil will be brought in to establish final elevations below the 355 contour from the top of the shallow land and below, but not including the forebays or micropools. Wetland A can then be replanted per the approved plans. Also, an ICPR model was run to determine if the fence over the emergency spillway would impede water flow or block debris resulting in impeded water flow during a large rain event. The outcome of the model substantiated that the stage for the 100 year, 24- hour storm event is 0.63 feet above the stage of the emergency spillway. Where the bottom of the fence is less than 0.63 feet above the spillway a potion of the bottom of the fence will be removed to satisfy the required depth over the spillway to convey large storm events. Schedule to complete: Assuming cooperation from all parties, this can be completed by the end of April in order to complete the herbaceous vegetation planting in optimal conditions. Please see response to Item #8 and Figure PC-1 by Priest, Craven and Associates, Inc. for proposed extension of a permanent bypass channel from the outlet pipe of Sediment Basin #71Wetland E to address non-diffuse flow into the Neuse Buffer in this area No. 8) Remove the temporary skimmer basin (Extended Detention Wetland E) or convert to an extended detention wetland. Sediment Basin #2: All areas in and around Sediment Basin #2 that are bare or have sparse groundcover will be prepared and have permanent healthy groundcover/vegetation established in accordance with the approved plans and specifications. Currently the watershed draining to Sediment Basin #2 is mostly stable and all areas that are not currently stable will be prepared and reseeded to establish permanent groundcover in accordance with the approved plans. In addition, only a very small amount of impervious surface currently drains to the device. Shiloh Morrisville, LLC is in the final construction plan reviews by the Town of Morrisville to issue construction plan approval on Phase 2 of the Shiloh Crossing development. During Phase 2 development, this device will be utilized as a Temporary Sediment Basin. Wake County has already completed their review of the Phase 2 erosion control plans and has given the plans conditional approval. Once the Town of Morrisville approves the Phase 2 construction plans, Wake County will issue the grading permit, Phase 2 construction will commence, and Sediment Basin #2 will be utilized for the Phase 2 construction. Once Phase 2 construction is complete and the watershed is stabilized, Sediment Basin #2 will be converted to a permanent wetland BMP to treat a portion of the runoff from outparcel development on the lots in Phase 2. The full conversion to the permanent BMP device shall take place within 6 months of closing out the Erosion and Sediment Control Permit for Phase 2. This will allow sufficient time to plant the permanent wetland vegetation in the optimal season. If Phase 2 construction has not commenced within 6 months of the date DWQ approves the 401 modification, the Sediment Basin #2 will be removed and the area will be stabilized in accordance with Wake County seeding specifications. Sediment Basin #7: Sediment Basin #7 is proposed to be converted to a "small" wetland to treat the volume of runoff from the 1" storm that is currently discharging into the device from an existing 36" RCP storm pipe network as described below. All areas in and around Sediment Basin #7 that are bare or have sparse groundcover will be prepared and have permanent healthy groundcover/vegetation established in accordance with the approved plans and specifications. The upstream invert of the 30" outlet pipe of Sediment Basin #7 will be lowered to elevation 322.0 to allow for a micropool to be installed at the riser. The appropriate modifications to the temporary riser structure will be made to accommodate lowering of the outlet pipe. With the modification of the temporary riser structure, an 8" plug valve with stem, stem guide, and handle will be added in the riser at the bottom elevation of the micropool (322.0) to allow for draining of the "small" wetland and micropool for maintenance purposes. See attached design details (Sheet C-01 Stormwater Wetland E). In order to eliminate the direct discharge into and through the Neuse River Buffer that currently exists from the outlet pipe of Sediment Basin #7, we propose to install a permanent rip-rap bypass channel along the property line from the 30" outlet pipe of Sediment Basin #7 to the existing creek. See attached proposed plan view and cross section of the permanent rip rap bypass channel (Figure PC-1 by Priest-Craven). We have included additional permanent buffer impacts with this request for installation of this permanent bypass channel. We are proposing a 20' swath parallel to the property line as a permanent impact to the Neuse Buffer for installation and maintenance of the new permanent bypass channel. A healthy dense stand of natural wetland vegetation has become established in the bottom of Sediment Basin #7 See picture below. -,V- F w L ? g 4i E" r 7+? WT"- In lieu of disturbing, grading, and replanting the bottom of the existing basin to establish a stormwater wetland, we propose to: 1. Install a forebay at the existing 36" pipe discharging into the device 2. Install a micropool at the modified outlet structure. 3. Hand remove the cloth baffles and let the remaining footprint of the device remain in its existing condition with minimal disturbance and continue to establish on its own. 4. Install a modified riser structure and lower the top elevation of the modified riser to 1 foot above the existing normal pool elevation determined in the field. By doing this, excessive depth in the water quality pool will not be stacked on top of the existing wetland vegetation for an extended period of time once the skimmer is removed. The elevation of the water quality orifice will be set to the existing normal pool elevation as determined at the time of construction to maintain the existing normal pool depth. Please see the attached worksheets, plan views, and cross sections for additional design details. Please note the following items pertaining to Sediment Basin V. This device will be utilized as a Sediment Basin in future Shiloh Crossing - Phase 3 construction. Sediment Basin #7 will be converted to the "small" wetlands proposed above within 6 months of the date DWQ approves the 401 modification. In the future, when an Erosion and Sediment Control Permit is issued by Wake County on the Phase 3 development at Shiloh Crossing, the "small" wetlands will be removed and the device will be converted back to a sediment basin for use during the Phase 3 construction. Once Phase 3 construction is complete and the watershed is stabilized, Sediment Basin #7 will be converted to a permanent wetland BMP to treat a portion of the runoff from outparcel development on the lot(s) in Phase 3. The full conversion to the permanent BMP shall take place within 6 months of closing out the Erosion and Sediment Control Permit for Shiloh Crossing -Phase 3. This will allow sufficient time to plant the permanent wetland vegetation in the optimal season. No. 9) Provide documentation showing the level spreaders were constructed and installed as designed. Submit a Plan that addresses the Operation and Maintenance problems at all level spreaders, including a timeline. All of the level spreaders appear to have been constructed and are functioning per the intent of the plans except as specifically noted hereafter. Erosion swales/gullies have developed at level spreaders 1 and 2. The proposed repairs are proposed in Figures 6, 7, 8, and 9. Additionally, level spreader 3 was constructed 3 feet shorter than designed (56 feet versus a 59 foot design length); however, it appears to be functioning adequately, and, as such, it is recommended that it not be modified at this time. There is already an Operation and Maintenance Agreement (O&M) in place for these devices as part of the approved Phase I Stormwater Plan. Schedule to complete: Assuming cooperation from all parties, this can be completed by the end of February. 4/401 Modification Request J, I f 14 r i , ?.--'--'A^" r+*-`rs7r*r' TT -^^^ ?^^;r.•*-„ ?- -i-- "m'n^rm,?.•? C],=F1 Kimley-Horn and Assodates, Inc. November 15, 2010 Mr. Ian McMillan, Supervisor NC Division of Water Quality (DWQ) 2521 Crabtree Blvd., Suite 250 Raleigh, NC 27604 Mr. Jamie Shem Raleigh Regulatory Field Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Re: Additional Information SAW-2004-21479-292 and DWQ Project #04-1764 Request to Modify Permit Verification and Water Quality Certification Shiloh Crossing Shopping Center Wake and Durham Counties, NC Dear Mr. McMillan and Mr. Shem: On behalf of Wal-Mart Stores East, LP, (Wal-Mart) and Shiloh-Morrisville, LLC (Shiloh), Kimley-Horn and Associates, Inc. (KHA) is submitting the enclosed additional information in the request to modify the above referenced approvals (submitted September 27, 2010) to additional, temporary impacts to Stream No. 1 (UT to Stirrup Iron Creek) and restoration of inadvertent impacts to Neuse Riparian Buffer along Stream No. 2 with additional impacts from the level spreader 4 bypass channel. Also, additional permanent Neuse buffer impacts are proposed for the extension of the bypass channel at Level Spreader #1 and the outlet pipe of Sediment Basin #7. This additional information is intended to completely supersede the modification requested dated September 27, 2010 and should be reviewed as such. This request is required as part of an effort to resolve a Notice of Violation (NOV-2010-WQ-0012) from the Division of Water Quality. The information enclosed herein, provides an explanation and justification for the proposed impacts. The documentation associated with this request is in addition to the previous submittals and is intended to serve as an addendum to all of the previously submitted information for simplicity and clarity. Figures la, lb, 8a, and 8b depict the additional impacts in relation to previously approved impacts. Additionally, since the impacts jurisdictional areas are temporary in nature, no mitigation has been proposed at this time. The impacts are summarized below: ¦ 3001 Weston Parkway Cary, NC 27513 ¦ TEL 919 677 2000 FAX 919 677 2050 KimleyHom and Associates, Inc. 1) Temporary Stream Impacts to Stream No. 1 (Figures la, lb, 2, 3, and 4) - A detailed description of the impact and need for the impact can be found in the response to Item No. 3, "Additional Responses to Notice of Violation (NOV 2010 - WQ 0012)" provided herein. The impact will be temporary in nature and should not substantially alter stream functions. Additionally, the construction access would be through a over-head utility easement corridor with maintained vegetation. Any temporary buffer impacts from construction would be returned to original grade and re-planted with a permanent native grass seed mix. Additional temporary stream impact requested: 75 feet 2) Riparian Buffer Restoration adjacent to Stream No. 2 (Figures 8 and PC-1) - A detailed description of the impact and need for the impact can be found in the response to Item Nos. 4, 5, and 9, "Additional Responses to Notice of Violation (NOV 2010 - WQ 0012)" and the PCN Application provided herein. Except for the impacts from the level spreader and Wetland E bypasses, the impact is temporary in nature since the buffer will be re- forested. Please see the table below copied from the included PCN outlining the proposed additional impacts. Please reference the PCN for more details. Reason for Impact Stream Name Zone 1 Impact (sf) Zone 2 Impact (sf) Accidental Stream 2 754 1108 clearing/Proposed restoration Additional Stream 1 and 1208 587 stormwater outlets Stream 2 The proposed modifications to the Stormwater Management Plan should not result in any additional impacts to jurisdictional features or Neuse riparian buffers. It is assumed that the proposed changes to the Stormwater Management Plan can be handled under the current Water quality Certification pending additional written approval of the Stormwater Management Plan for the changes. If you need any additional information, or if you have any questions, please do not hesitate to contact me at (704) 319-5698. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Austin L. Watts, P.E. o4- ?1LcLk vQ_? o'oF WA'F`9 y r Z; a w, Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PC Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ® Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 39 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ? Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ® Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Shiloh Crossing 2b. County: Wake 2c. Nearest municipality / town: Morrisville 2d. Subdivision name: Shiloh Crossing 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: Shiloh Morrisville LLC C/O US Real Estate LP 3b. Deed Book and Page No. Book 2008 Pg 1942 3c. Responsible Party (for LLC if applicable): US Real Estate 3d. Street address: 9830 Colonnade Blvd Suite 600 3e. City, state, zip: San Antonio, TX 78230 3f. Telephone no.: 856-988-8770 3g. Fax no.: 3h. Email address: jimspeake@gmail.com Page I of 14 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (If different from owner) 4a. Applicant is: ? Agent ® Other, specify: Developer/Joint Applicant with Owner 4b. Name: Wal-Mart Stores East, LP 4c. Business name (if applicable): 4d. Street address: 2001 SE 10'" Street 4e. City, state, zip: Bentonville, AR 72716 4f. Telephone no.: 479-204-3314 4g. Fax no.: 479-204-0934 4h. Email address: mark.goldsmith@wal-mart.com 5. Agent/Consultant Information (if applicable) 5a. Name: Austin Watts / Kevin Martin 5b. Business name (if applicable): Kimley-Horn and Assoc, Inc. / Soil & Environmental Consultants, PA 5c. Street address: 4651 Charlotte Park Drive / 11010 Raven Ridge Road 5d. City, state, zip: Charlotte, NC 28217 / Raleigh, NC 27614 5e. Telephone no.: 704-319-5698 1919-846-5900 5f. Fax no.: 704-333-0845 / 919-782-1288 5g. Email address: austin.watts@kimley-horn.com / kmartin@sandec.com Page 2 of 14 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification Lot 1 - (0747-03-406680), Lot 13 - (0747-04-604326), 1 a. Property identification no. (tax PIN or parcel ID): Lot 14 - (0747-04-503347), and Lot 15 - (0746-02- 697866) Latitude: 35.8656 Longitude: - 78.8445 1 b. Site coordinates (In decimal degrees): (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 115.7 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Stirrup Iron Creek proposed project: 2b. Water Quality Classification of nearest receiving water: C; NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is bounded by the proposed Northern Wake Expressway (NC-540) to the south and east, NC 54 (Chapel Hill Road) to the west, and Surles Court to the north. Industrial warehouses (Imperial Center) and forested land are adjacent to the north. The nearby vicinity is composed of industrial warehouses, commercial buildings, some single family residential homes, and forested land. The subject property was primarily wooded with mature hardwood trees. One single family residential building existed in the southwestern corner and some non-forested areas exist along the west side of the site along NC Highway 54. A USGS Topographic Quad Map and NRCS Soil Survey Map were included in the original application. Two perennial streams (unnamed tributaries to Stirrup Iron Creek) and six jurisdictional wetlands are located within the subject property. Stream 1 originates within the subject property and captures flow from on-site wetlands. Stream 1 flow west to east into Stream 2 near the northeastern comer. Once off the subject property, Stream 2 flows through a twin box culvert under NC-540 to the southeast to Stirrup Creek, which continues southeast to Lake Crabtree and Crabtree Creek. A CP&L easement for an overhead power transmission lines is located in the eastern portion of the subject property and generally runs north to south. Subsequently, the site has been partially developed to include the Wal-Mart and Sam's Club with the associated infrastructure. Shiloh Glenn Drive has also been constructed. See Plan Sheet 0-1 in the Appendix. 3b. List the total estimated acreage of all existing wetlands on the property: 1.577 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3,400 feet 3d. Explain the purpose of the proposed project: The project has created a development node along a major urban transportation corridor where Major Commercial has been identified on the Town of Morrisville's Land Use Plan. The development will create a regional shopping center that will serve the rapid residential growth in this area, will be adequately buffered from adjacent properties with no direct adjacency to residential homes. 3e. Describe the overall project in detail, including the type of equipment to be used: The constructed retail shopping center includes 2 big box stores. The unconstructed portion includes 10 outparcels, and a large flex retail area. Phase 1 will included construction of the on-site public road (Shiloh Glenn Drive), the big box buildings, and associated utility and stormwater improvements. Phase 2 will include portions of the private access (Lower Shiloh Way), outparcel development, and associated utility and stormwater improvements. Phase 3 will include the remaining portion of the private access and large flex retail area and associated stormwater improvements. Heavy equipment such as bulldozers and excavators and some blasting of rock may be required for grading and stormwater management. Several retaining walls will be constructed to minimize impacts. The water and sanitary sewer infrastructure has been installed within the roadways and parking areas to minimize impacts. Page 3 of 14 PCN Form - Version 1.3 December 10, 2008 Version 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: A jurisdictional determination has been issued for ® Yes ? No ? Unknown the on-site wetlands on 4/4/05 (USACE File #200421479) and a DWQ on-site stream buffer determination was made on 11/10/04 (DWQ EXP #04-1764). Refer to Attachment 1 for copies of these documents. 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: S&EC Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Documentation has already been provided in previous submittals. 5. Project History 5a. Have permits or certifications been requested or obtained for ®Yes ? No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. USACE issued the Section 404 Nationwide Permit (Action ID # SAW-2004-21479-292) and DWQ issued the Section 401 Water Quality Certification (Project #04-1764) for the project. This application represents the 4`h modification request. 6. Future Project Plans 6a. Is this a phased project? ® Yes ? No 6b. If yes, explain. The entire project is presented in this application. All impacts and environmental factors are included as part of this application including future Phase 2 and 3 development of the outparcel Lots 2 through 10 and Lot 12 flex retail area. No additional impacts are anticipated. Page 4 of 14 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ® Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) (if known) DWQ - non-404, other) (acres) or Temporary T) W1 ®P ? T Parking: Grading and Fill Forested ® Yes ? No ? Corps ? DWQ 0.019 W2 ®P ? T Road: Grading and Fill Forested ® Yes ? No ? Corps ? DWQ 0.108 W3 ®P ? T Road:Grading and Fill Forested ® Yes ? No ? Corps ? DWQ 279 W4 ® P ? T Road & Outparcels: Grading and Fill Forested ® Yes ? No El Corps ? DWQ 0.040 W5 ®P ? T Road: Grading & Fill Forested ® Yes ? No ? Corps ? DWQ 0.004 W6 ®P ? T Road: Grading and Fill and Utility Relocation Forested ® Yes ? No ? Corps ? DWQ 0.029 2g. Total wetland impacts 0.479 2h. Comments: Previously Authorized. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) intermittent DWQ - non-404, width (linear or Temporary (INT)? other) (feet) feet) (T) S1 ®P ®T Road: Culvert & UT to Stirrup Iron ® PER ? Corps 3 202` Dissipater Pads Creek Stream 1 ? INT ? DWQ S2 ®P ? T Road: Culvert & UT to Stirrup Iron ® PER ? Corps 15 147 Dissipater Pads Creek Stream 2 ? INT ? DWQ S3 ? P ? T ? PER ? INT ? Corps ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ ? PER ? Corps S5 ? P ? T _? INT ? DWQ ? PER ? Corps S6 ? PEI T ? INT ? DWQ 3h. Total stream and tributary impacts 376 3i. Comments: "This includes the 75 feet of newly proposed temorary impacts. 274 feet was previously authorized. All of the current, proposed, additional impacts are temporary. Page 5 of 14 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact (if applicable) Type of impact Waterbody type Area of impact (acres) number - Permanent (P) or Temporary T 01 ?P? T 02 ?P? T 03 ?P? T 04 ?P? T 4L Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then com fete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose of (acres) number pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5E Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No if yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 6 of 14 PCN Form -Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason for Buffer Zone 1 impact Zone 2 impact Permanent impact Stream name mitigation (square feet) (square feet) (P) or required? Temporary T_ Stream 1 and Stream 2 s B1 ®P ? T Grading & Fill Previously Authorized ® No 18,533 19,912 Impacts B2 ? P ® T Accidental clearing/Proposed Stream 2 ? Yes ® No 754 1108 restoration Additional ? Yes B3 ®P ? T stormwater Stream 1 and Stream 2 ® No 1208 587 outlets 6h. Total buffer impacts 20,495 21,607 6i. Comments: The accidental clearing will be replanted with trees per the attached Response to the NOV. The additional stormwater outlets will be extended at level spreaders 1 (Z1 631 sq ft, Z2 123 sq ft) and 4 (Z1 168 sq ft, Z2 52 sq ft). A bypass for Wetland E will also be provided (Z1 409 sq ft), Z2 412 sq ft).The dissipater at Wetland A will be also be repaired within the previously authorized footprint. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. ***Previously Approved Impacts*** The proposed development underwent multiple changes and revisions to avoid and minimize impacts to wetlands, streams, and riparian buffers. The design concept has considered preservation of these natural areas to help buffer the scale of the project and provide a pedestrian friendly sidewalks offering views into the wetlands and stream corridor. The location of the main site entrance along NC 54 was set by NCDOT based on breaks in control of access and required traffic signal spacing. Shiloh Glenn Drive was located to avoid impacts to stream buffers and wetlands while providing minimum capacity and adequate traffic patterns. A traffic circle has been used to allow a more perpendicular crossing of Stream 1 and reduce lanes from 3 to 2 to minimize impacts. In addition, a variance was obtained from the Town of Morrisville to reduce the design speed and pavement width for Shiloh Glenn Drive to further minimize stream impacts. Impacts to Stream 2 are unavoidable due to existing disturbance related to NC-540 construction required connection to the existing NCDOT Service Road to allow for traffic to Slater Road. The majority of the stormwater run-off from Shiloh Glenn Drive will be treated with level spreaders, however, a small area at the crossing of Stream 2 cannot be treated. Modification to increase Stream #2 impacts 20 linear feet required for the structural design of the culvert to comply with NCDOT standard guidelines for setback for guardrails and head wall heights. Impacts at Wetlands 3A and 3C were not originally considered; however, the Town of Morrisville required a private access to connect from the Shiloh Glenn Drive to Lower Shiloh Way to provide additional "stacking" on Shiloh Glenn Drive and to restrict the intersection with Lower Shiloh Way near Wetlands 2 and 3C to a "right-in/out and left over" movement for adequate traffic flow. Impacts to Wetlands 3A and 3C have been minimized with wing wall sections on both sides of the proposed culvert and the reduction in lanes from 3 to 2 at the crossing with the addition of the western most traffic circle. Impacts to Wetland 3 were avoided to the extent practicable to allow construction of Shiloh Glenn Drive. Design plans have been revised to protect sideslopes and add retaining walls on the south side of the Shiloh Glenn Drive to minimize the impacts to Wetlands 3A and 3C. Wetlands 5 and 6 have been almost entirely avoided. In addition, the existing hydrology of Wetlands 3 and 6 have been maintained with the proposed culverts and by-pass piping to allow the natural flow of stormwater to continue to release into these wetlands. Modification to increase Wetland #6 impacts 0.010 acres required to accommodate Page 7 of 14 PCN Form -Version 1.3 December 10, 2008 Version the relocation of the Progress Energy overhead transmission line.***Previously Approved Impacts*** The proposed additional impacts are explained in the the Response to the NOV, herein. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Avoidance and minimization are described in the attached Response to the NOV. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ® Yes ? No 2b. If yes, mitigation is required by (check all that apply): ® DWQ ® Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ® Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: All payments for required mitigation have been made to the EEP. 3b. Credits Purchased (attach receipt and letter) _ Type -Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ® Yes 4b. Stream mitigation requested: 548 linear feet 4c. If using stream mitigation, stream temperature: ® warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): 45,575 square feet 4e. Riparian wetland mitigation requested: 0.25 acres 4f. Non-riparian wetland mitigation requested: 0.25 acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: All impacts requiring mitigation have been made to the EEP. This was done prior to the current legislation requiring preference of a mitigation bank.See Appendix for the EEP Invoice and proof of payments. 5. Complete If Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 8 of 14 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires Z Yes ? No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). All buffer impacts requiring mitigation were previously authorized and payment to the EEP was made prior to the establishment of legislation requiring preference of a mitigation bank. See Appendix for the EEP Invoice and proof of payments. 6h. Comments: The currently proposed impacts should not require riparian buffer mitigation. Page 9 of 14 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Yes No ® ? Comments: See attached documentation. Page 10 of 14 PCN Form - Version 1.3 December 10, 2008 Version 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ? Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The stormwater management plan for Phase 1 has been approved. The attached documentation describes how the plan will be properly implemented. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Phase 1: ""PREVIOUSLY APPROVED *** The final stormwater management facilities for Phase 1 (that includes Lot 1, Wal-Mart, Sam's Club, and Shiloh Glenn Drive) shall be constructed according to the approved stormwater management plans received on May 15, 2007. The stormwater drainage infrastructure and treatment facilities shall be constructed and operational prior to occupying any of the above buildings. Phase 2: Final grading and impacts to Wetlands #3C, #4, #6 will be based on the preliminary stormwater management plans received May 15, 2007. None of the building and infrastructure associated with Phase 2 (that includes Lots 2 through 10 and Lower Shiloh Way) will be occupied until the stormwater drainage infrastructure and treatment facilities are constructed and operational according to the approved stormwater management plans. Phase 3: Final grading will be based on the preliminary stormwater management plans received May 15, 2007. None of the building and infrastructure associated with Phase 3 (that includes Lot 12) will be occupied until the stormwater drainage infrastructure and treatment facilities are constructed and operational according to the approved stormwater management plans. The proposed development will disturb approximately 90.42 acres of the 115.7 total site acreage. Pre- development conditions include approximately 0.4 acres of impervious area and Post-development conditions include approximately 79.4 acres of impervious area. Approximately 25.23 acres of undisturbed grass and wooded area will continue to drain to the on-site perennial stream channel (unnamed tributary to Stirrup Iron Creek). Please note, construction will occur in phases with initial stormwater controls for Phase 1 limited to Extended Detention Wetland A for Lots 1, 13, and 14 and four level spreaders for Shiloh Glenn Drive. Stormwater controls will be constructed later for future Phase 2 development of Lots 2 through 10 including Extended Detention Wetlands B and C and for future Phase 3 development of Lot 12 including Extended Detention Wetlands D and E. The extended detention wetlands have been designed to treat the first 1-inch of stormwater run-off and remove 85% total suspended solids. They were designed and sized prior to the 2007 Stormwater BMP Manual, but while the Draft Manual was available. The design of Wetland A was also provided to meet Durham standards and requirements. The level spreaders have been designed per the bypass alternatives allowable by NCDENR for diffuse flow through buffers for compliance with DWQ's Level Spreader Design Guidelines, Final Version, Effective Date 1/1/2007. Nitrogen loading rates will effectively be reduced below the required 10 Ibs/acre/year per the Neuse Stormwater Rule (15A NCAC 2B .0235) for the entire site. Adequate storage will be provided to reduce post-development peak discharge flows to below pre-development peak discharge flows for the 1, 2 and 10-year storm events in accordance with the City of Durham's Stormwater Design Criteria and Town of Morrisville's Stormwater Runoff Management Policy that were in existance at the time. The project includes off-site roadway improvements to NC 54, NCDOT Service Road, and Surles Court, Slater Road, and Hopson Road intersections. Stormwater controls for widening of NC 54 adjacent to the site will be combined with existing run-off from NCDOT's R2000ab TIP and discharged into a velocity dissipater approximately 100-feet in front of Wetland 5. After diffuse flow through the wetland, the stormwater will be piped to bypass a portion of the site and discharge into Wetland 3 at the headwaters of Stream 1. Stormwater for the other off-site improvements for NCDOT maintained roads will be routed into the existing drainage structures. ® Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ® DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Durham and Morrisville Page 11 of 14 PCN Form - Version 1.3 December 10, 2008 Version ® Phase II ® NSW 3b. Which of the following locally-implemented stormwater management programs ? USMP apply (check all that apply): ? Water Sup ply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ® Yes ? No F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval El Yes ? No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ® Yes ? No or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after-the-fact permit application? ® Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Please see attached documentation. Page 12 of 14 PCN Form - Version 1.3 December 10, 2008 Version 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. The site is bounded by NC Railroad to the west, NC-540 to the south and east, and Imperial Center to the northwest. The only undeveloped area is to the northeast with access from Slater Road and existing NCDOT Service Road. The proposed development will construct Shiloh Glenn Drive from NC 54 through the site and across an unnamed tributary to Stirrup Iron Creek (at the east end of the project) to connect to an existing NCDOT Service Road which continues to Slater Road. Making the connection to Slater Road through the site is the last remaining section to connect the NCDOT Service Road from NC 54 It is possible that providing this connection would make the undeveloped land west of the existing NCDOT Service Road and northeast of the site more attractive for development. However, the development overlays are a direct result of NC- 540 construction and not related to the project. Since construction of the road extension itself will not result in any further impacts than already requested herein, the only other potential indirect or cumulative impacts would be from future development to the west of Slater Road. Impacts to stream, wetlands or buffers in these locations would be subject to regulation by the USACE and DWQ. Additionally, all of the undeveloped land would be within the City/County of Durham's jurisdiction which has its own buffer ordinances and extensive stormwater management requirements that meet or exceed DWQ's requirements. These requirements which apply to all new development include nutrient reduction requirements per the Neuse Buffer Rules, control of peak discharge for the 2 and 10 year-24 hour storm events, and 85% TSS removal requirement per NPDES Phase II requirements. As such, all potential indirect and cumulative impacts would be addressed by the existing regulatory framework. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The Town of Morrisville Concourse Interceptor Improvement will extend sanitary sewer service to the site. Wastewater will be treated through the Town of Cary wastewater treatment facility. Page 13 of 14 PCN Form -Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ? No habitat? 5b. Have you checked with the USFWS conceming Endangered Species Act ? Yes ? No impacts? El Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The overall project has already been approved. The additional impacts proposed herein are to resolve a Notice of Violation from the Division of Water Quality. The additional impacts will occur within or immediately adjacent to areas recently disturbed as a result of the previously authorized. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ? No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? The overall project has already been approved. The additional impacts proposed herein are to resolve a Notice of Violation from the Division of Water Quality. The additional impacts will occur within or immediately adjacent to areas recently disturbed as a result of the previously authorized. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ? No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? The overall project has already been approved. The additional impacts proposed herein are to resolve a Notice of Violation from the Division of Water Quality. The additional impacts will occur within or immediately adjacent to areas recently disturbed as a result of the previously authorized. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No 8b. If yes, explain how project meets FEMA requirements: The project required a CLOMR/LOMR for the dual box culverts. 8c. What source(s) did you use to make the floodplain determination? NC Floodmaps Austin Watts / Kevin Martin Z 11/15/10 Appticant/Agent's Printed Name Applicant/Agent's Signature Date (/Agent's signature is valid only i1 an authorization letter from the applicant is Page 14 of 14 PCN Form - Version 1.3 December 10, 2008 Version Letter of Authorization Wal-Mart Stores, Inc. authorizes Kimley-Horn and Associates, Inc. to act as our limited agent to coordinate with the U.S. Army Corps of Engineers and North Carolina Division Water Quality for the preparation and submittal of jurisdictional determinations and 404/401 permit applications associated with the Shiloh Crossing Project located in Morrisville, Wake County, North Carolina. Authorization will terminate on either final agency action or upon written notification from either parties involved. Company Name: Wal-Mart Stores, Inc . Contact Name: Mark Goldsmith Client Address: 2001 SE 10th Street Bentonville, AR 72716 Client Phone #: 479-204-3314 Client Fax #: 479-204-0934 Client Email: mark.goldsmith@wal-mart.com J. Robert "Irly, Senior Vice Presi t Real Estate Date AGENT AUTHORIZATION FORM All Blanks To Be Filled In By The Current Landowner Name: Shiloh Morrisville LLC Address: 9830 Colonnade Blvd, Suite 600 San Antonio, TX 78230 Phone: (210) 641-8487. Project Name/ Description: Shiloh Crossing Date: 7/23/09. The Department of the Army U.S. Army Corps of Engineers, Wilmington District P.O. Box 1890 Wilmington, NC 28402 Attn: -James Shern Field Office: -Raleigh Re: Environmental Related Consulting To Whom It May Concern: I, the current roe owner, hereby authorize the release of ajxy infoatio egarding the above project to Soil & Environmental Consultants, PA (S&EC) an a horize you o directly discuss any aspects of the project which S&EC may inquire about. IV- L) (-'e- C- T".-_?f V' Se_ V% Print Property Owner's Name Property Owner's Signature cc: Ms. Cyndi Karcly cc: Mr. Kevin C. Martin NCDENR - DWQ Soil & Environmental Consultants, PA 2321 Crabtree Boulevard Raleigh, NC 27604 i� c �, iia i � �: E {. �, '�Ii !� i f, I a' �p 44' i !' �. f �' !!j� di f.: f � i o f €' r 4 �� ?"^„ „P,?„?r?rT'"T,?^,*^r"?_ -v^ n-??qr*.?r r r°?r?.+??r-?,..,-?.?.r?,r?^r -r T?_: _. ..r,...?.P?.?,P,?.„.i,,.-.T.--.-.7.?..?,P?,-:_'"'1'?°"'7'.P??"1?,,,f,"",P"I'^"?""T'"Pl'r?1r"'_^-'"•..^T^"" `T' Prepared by Josh Allen [mFI as„, ? ". KI\CHL-LDEV\015476 Wal-Mart SlteClvll\ANGEL0NI\039 Morrlsville WM\Submittals\100809-Todd St. John\PLAN PROFILE.dwg Ar • ( / Al E L.) / ? o0 V 00 tD r Z p' / a X// j CA) t ? t 1 I I x i Kimley-Horn andAssmiates,Ino WALMART AND SAM'S CLUB SHILOH GLENN DRIVE FIGURE 4W CHAR &M PW 0181E 04A 3TI IMM°'" 22217 MORRISVILLE, NC CULVERT PLAN AND PROFILE lb .AC Do.T3)}11818 THIS DOGA4IR. TOGETHER MITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN. AS AN INSTRUMENT OF SERMCE. IS INTENDED ONLY FOR THE SPECKIC PURPOSE AND CUERT FOR WON IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WTROUT NRITTEN AUTHORIZATION AND ADAPTATION BY MMLEY-HORN AND ASSOCIATES. INQ SHALL BE MTNDUT UAINUTY TO KIM EY-NGM AND ASSOCIATES. INC. KI\CHL-LDEV\015476 Wal-Mart SlteCivil\ANGEL0NI\039 Morrisville WM\SubmItta1s\100809-Todd St, John\PLAN PROFILE,dwg n C r -4 - - H~ - 2 Z <<< < m Z < M M III M D + O W .-. W W J < T m O 31 Ln x O 0 1 00 D 71 Cf) o 0 zo N C:)? c m ? m m MM " D ?, W N Z --I mx m Z OZ LIM ? Kimley-Horn oc and Assiates,lnc dURl PAR( 4111E WALMART AND SAM'S CLUB SUIT 0T1E W 360 - kIQWIW CAMNA '" MORRISVILLE, NC =; - PAC LT61) 3] THIS DOCUMENT. TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED RELIANCE ON THIS OMMENT WTHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY IOMLEY-NORM AM ASSOCIATES. MC. SHALL SHILOH GLENN DRIVE FIGURE CULVERT PLAN AND PROFILE 2 NCY FOR THE SPECIFIC PURPOSE AND CLIENT FOR VHCH IT WAS PREPARED. REUSE OF AND IMPROPER BE WTHOUT LIABILITY TO KMLEY-NORM AND ASSOCIATES, INC. KM\CHL-LDEV\015476 Wol-Mart SlteCivil\ANGEL0NI\039 Morrisville WM\Subrllttnls\100809_Todd St. John\PLAN PROFILE,dwg (n -nm ? m X v m0 T 2 M .. 'i x 00 D z Z o { z m : i z n 00 () j < ? D ., ? ?nTI I 2--I D m O 1 m (n Z W (n I :_. ._ m X Kimley-Horn and Associates,lnc 4W pIMIMRTE GAR( IM4 WALMART AND SAM'S CLUB SHILOH GLENN DRIVE FIGURE aR¢ sw .FXN?T MORRISVILLE, NC CULVERT PLAN AND PROFILE 3 GA1C (T+NT THIS IS DOCUMENT. TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HERON, AS AN INSTRUMENT OF SERMCE. IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WINICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT VATHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KINLEY-HORN AND ASSOCIATES. W- SMALL BE VATK)UT UABRITY TO KIMUEY-HORN AND ASSOCIATES, INC. KI\CHL-LDEV\015476 Wall-Mart SlteClvll\ANGEL0NI\039 MorrlsviLle WM\Submlttals\100809_Todd St. John\PLAN PROFILE.dwg N D r m \ m 0 ti -1 °z C3 2 mm F"m ci <zml0.)OT £1p.. ;u IOU DH•.n D mm OO xto zm m N ? Z CDF ?D ;o Ozx ;WD5?F, zx mega m To* Z?ZZr Zro ?AaZ> v ? D CZ) Zmv N-004 b >; D` o TTC "' ozv ozc .. D .r1/ Z ? 3 s o Z o Z Z D o? o j N 0r m>a 3 m X ^ Z L, v 21 Z ^D^ yJ D O rU ° 3 3 X Z v v (7 6J Z > Z W D N 70C D N v m .X.. f7 , , 70 ` z N ti m £.3. r t? m Z r O? r p? y m r CC Z Co pym Z a Ny A x 3. 0 m T- 3"A C-) -4 C3 T- H 0 ITT x m S£mz S n lD7 Kimley-Horn and Associates, Inc WALMART AND SAM'S CLUB 'B`I CHARLOTTE .ARC IIIIAE SUITE 350 CHIARLOTTE. MOM CAROLINA 2W7 (AL) ]6S-OIT ;'"rTW) i3.1 1A IC C THIS DOCUMENT. TOCEIHM NTH THE CONCEPTS AND DESIGNS PRESENTED HEREIN. AS AN INSTRUMENT OF SERVICE. IS INTENDED REUANCE ON THIS DOCUMENT WIWOUT WRITTEN AUTHORIZATION AND ADAPTATION BY IUMLEY-HORN AND A59MATM W- SHNL BE SHILOH GLENN DRIVE FIGURE CULVERT PLAN AND PROFILE 4 ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR U/CR IT WAS PREPARED. REIM OF AND IMPROPER WITHOUT LIABILITY TO RMUEY-HORN AND ASSOCIATES. INC. K1\CHL_LDEV\015476 Wal-Mart SlteClvil\ANGEL0NI\039 Morrisville WM\SubmIttals\100609_Todd St. John\PLAN PROFILE,dwg ///'?/T? C ?,? 11111 Il - 07111 \ 1 \\\\ \ \?`? \ ?? -,353 w 35gr??\ ?\ \ 1111 \ \ \ \ \?\ I ?I ?I P ?\\ \\\`n\ ` ?? _? / \1111 \\\\\\ \ \\?\????? \\\?\1?? \\ x$ I ? ! y ? 111 1 \ ?? - 1111 1111 '1;g4 1111 111 11 11 1 SCI Q n 1 `Cn n 1 II I h?.l I I I I I I I I I i r m z 1 1 0 v 0 z -4 0 o 0 m z 0 0 m z 0 0 m z ° A C 3 0 Z 0 0 M KimleyHorn and Associates, Inc NeK CHARLOTTE PMK WK LT Ae CIIIILOTE, NORM CAROLINA 29117 "°° (TRq s?, e r TAC (AN) 3]YOMe THIS DOCUMENT. TOCETVER RITN THE CONCEPTS RELIANCE ON THIS DOCUMENT WTHOUT NHITTEN WALMART AND SAM'S CLUB SHILOH GLENN DRIVE FIGURE MORRISVILLE, NC CULVERT PLAN AND PROFILE 5 ND DW04S PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE. IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER I7HORIZA7ION AND ADAPTATION BY KIMLEY-HORN AM ASSOCIATES, NC, SHALL DE 1RTHOIT LLIBILITY TO KIMLEY-HORN AND ASSOCIATES, INC, L17000002-90 ON IDAMHd 3IIIASIHHOW d0 NMOI C ry SNOISIA321 31VO ON OOOP£LZ (6L4) 131 VNIIOiJVO H1210N m m (D 0 N CF) co Q Z OSS09tLZL SVSNVWdV'37IANO1N3S /.1NnOO 3NVM'3ll1ASW8OA W W V N S W ?/ ? o J 3 13381S HM 3S LOOZ 18nOO S3Ial S ONV bS AMH ON Ndld 3SVNI"G GNV ONI( V2i`J 14 ly ?: O -V u tea ` 1 ?? X31dW001N3WdOl3A3O NO1lVM WtlS ON ,o-s6to 3/?Iad NN319 HOIIHS o ? CO ¢ ;; ? v W _ '7NW'S3tlO1S K' 00-OSZII ON 3ziOIS 3-MASMOW-LWW--WM m i $ g E ° ° 1bdII11 IVM _ I O aN3na -/oaroaa ei/u v t v. i V A li `, / r iA 7 ?F .? I 11A1 'Al v ?v N, r?\ II C \ I I l R - l\II I it ?\ \ `_ \ X _I ,- ?r ®l0 11--iii I U)? LU a - x 3 24 a z a 0 ¢ . i C) Z W CD Li 3 ~ UU) ¢? ttio of o w ; Lli w ° 3 o Z D F ?? °? ^3 W is Q °3og? - / V 'amp _ o - - a3a Z n ? w i LL in t;E? is in a _a opui? u? C7 _ ? ., a ? e ,. m m Q w m za 0 O (n _ Q o LL" msw Z os U) 'oo° - LL 'E wamN ?Qz am?V mUa2 U ?j rac,verrc I I- 1 .- IIiIIIIII:?I)IIII?111 V4IIII I III IIII I ?? v ///all ? / ?,`? y? 1I IIII II IIII IIII III ?' ?\N IIII ? ? F i ?I\II ?I II I I ?- ? I I I ll?lt?ll??4? i? / IIIIII I ?/ / II IIIIII ?,I?. ???I ??I A _ / I p II f \ IIII I I ? I I III I v g ? ? I\ ?+ l l I ? r ? ? ? ? , ? / / /? IIP IIIII?Ih II??III ? ? ? ? ? V?{. I I I/I ? ? I I ' ? ? r / - / I ??vI II 7? II ?? I I I v? v vl 1 v I J I I I I/ I??IIII ?I I ? ?? II' v I I , ? I , N??r 111 I?v v I??I \ j r ?rl v l u l l w y /r L Al/ l/? '/'? / ???! I ICI. I I Iy r I n I I 1 I!Ii? i1'' \ IIf-???y I I??I ` \ I r?' i ? t I I I y ?II . i I , III I ??Ir?IIVI ?l? IIIIIvv r ?v ?? II ?II??IIII v v \"A I l l l l l i l \ \ I / I I I v IIII-I I I?II'1?a?l?ll?,lWW ?ly I I i'?1I v I'I 141`III I?I??II?I.-?I ?zl ?? ? I I?'iill?,` I v Ill l l l?ll'?I 1 II i 'I I I I l 1r9 v /III/?/? vv ? y vv y,II / I I +IIII'„ I'I?QY^? ? ? ? { l ? I I , 1 _ ' ? ? l I I\{ IV I I?I?I II I?I II III ? hl ,? so i/? , ?lll I II \ \ µ, IM ? f III IIllltl I 1- I ? / ? 'j I I I, d I I I I ',Illm F-' 1 ///(/ /??t I MCI I '-' I I I ? "jz ,- ..... I'll?l?l 11 1 I ??I ?Vlr ??/ /?' ?I?I I ---- ?I -- I I Ir?I?II i \ \ 1 111 I I I I i P r I ?I ? ti ./ ? N I\\ IIII I I I } I)/ 1 n? ?iII ?I I i r R ? 1 ? ICI I I / II III, I,I \ ry p?• ;II I \ ? a s I I v? A! \I , ? In???? I.?t,J 11? Ih II r ox0'l0'lt?-OlOll\u4al` -15 GVal 608001\slolywa^5\NA ?II!ns!uoW fif0\INOl30Ntl\IU??a1?5 I?urv-IOM 9LOS 10\A301 lH0\:N Lb00000R-90 ON 173roHa 3IIV\SINNOW 30 NMOI U m SNOISIn321 31V0 ON OOOPCLZ (6L9) 131 tlNllOi/tl0 HITJON N a 0 a O, ujY Q 0990-9LLZL SVSNVXdV'3111ANO1N30 ALNnOO 3NVM'3111ASRR10W J W J W U N N r W C g 133a1SH1013S10DZ lanooS3lansCINV9SAMHON NVId 3`OVNI"(] (INV ONIGV219 N q am: O %3ldWOO 1N3WdOl3L\30 NO1lVM WVS ON-lO-961o 3ARRI NN3I9 HOIIHS o s U 0 ON o W IIASI2R10MMOW • IaVEVW -IVM 3? 0 - ?%f L"VM V LL Y ?: ,. I.. ,as?^oaa -luu 1 \q 1 \/\ i L - L 1 I 3 - W? V mo F 3 3 Z? - Qa rc O~ _ 0 ¢ ~ Q3 aN ? LL J Zo _ m - ?¢ V? 3? Z~ N rc as D 1X\ 7-1 \ \\? ,\ \ \ \ \q \\ -- _ -, w ---- v ?rV` kX _ ` vA v ` n v yvnA}. vv ?? `? All 1 `y\\ X"\, v \ I? ? II I vv v A v vv v ?r?o\ vv ?` vv V?? v a vv I 1` 1 1 1 i 1 v I •-+ WW co) a d 4;Ze.- III 2 a U C7 zy 0 Q WQ - n/ 3 U u L; z W o - - o D.- ,O V/ Fo? z w zE 0W< Q om W z33 - z=s U U) > Q 300 L\ r? I vI v? y l ?I f - LI F???? ?`? 1 ?h??"l??l ??? •?? I I i I I vv vv v tit h\, L ?I r? ??-t 11 I ,?? I i I?i`? i\I?? \\ Y ?U, \I II?J1 ? „ h /) F v / ??,?Y? 7 I I I \ L? X11 \4 / ay y / i / i.T / ? / ?v I ?l )? \I \ \ \ 'P, I v- ?li I I I \ \ , I I j 1I 1 ? / I?,1 ? ? I 4 ?? ?? I I v A 1 1 1 1 Q-? v vF? ? ?? ?--- I I v ?11 1 v _- ? x v ? q I < _ v I I I v .. v y v v i? v ? ? '- I I vvv v v v ,jL/v I v V--Cr?_-- ? vv v v ?V A\v \ \ \ N \ V A ?? `?A, ?? v I I Vy„ I , A ?. A V\? G F II IIL1,11 I I I A v .?? '??, A III VIII 1I I I I I I ?` ?. '\ ? ?\ III II 1 ? I y ? \ v ,-Ili III I I I ? ? \ _ ? \ '- vv v `v v? ?? \ ,li1J \ ??\\ 111 I 1 ? ? \ \\ ?\? A ?dvvq J V v v vv v V A 31, 6mPZ0l l?-OlOt l\uyaf 'IS PPOl 600001\siolli,wgn5\IYM all?si,.ory 6t0\?NOl30NY\I!^?.Ja1i5 ?+erv-IOM 9L1S ?0\A301 lx]\N Prepared by Josh Allen CO" =,iR_ r ?? ?? C 11 u G 0 T 9 0. a` O z a 3 9 5 U t 0 s ti 30 .v ? .? o °' 0 3 k ? 5 a 5 47 ?I x w / Q? Qz ?O / I - N N v I o 0 maz Q. N va- a ? I m I_ IIIII I ,? i,l:l I I ? o I a QL Z J m r 111,,,,/ ,Al A•. ?jJ At >. n J ?n w m wU, a _z H i Goo u a '?' I; ..; ,I' ?I ?' r ?'` i I?? ?' ? f: ?! k \I-FJ Kimley-Horn and Associates, Inc. PROPOSED STORMWATER WETLAND Project Information Project Name: Shiloh Crossing KHA Project #: 015476039 Designed by: tsi Date: 12/2/2009 Revised by: Date: Revised by: Date: Design Resource: NCDENR - Stormwater Best Management Practices (July 2007) Site Information Sub Area Location: Stormwater Wetland E (Sediment Basin 7) Drainage Area (DA) = 9.5 Acres Impervious Area (IA) = 0.00 Acres Percent Impervious (1) = 0.0 % Required Storage Volume (First Flush): Design Storm = 1 inch Determine Rv Value = 0.05 + .009 (1) = 0.05 in/in Storage Volume and Surface Area Required = 1,724 cf/sf (above Permanent Pool) 'Assume surface area based on 1' depth of storage volume. Modified Wetland Zone Reauirements: Depth relative to Perm. Pool" Zone ID % Required Required Surface Area sf Provided Surface Area sf % Required Provided % Actual Provided 0-12" above Shallow Land 30-40% 517 to 690 2,400 139.2% 34% W-6" below Shallow Water 40.00% 690 3,200 185.6% 45% 18"-36" below Foreba 10.00% 172 750 43.5% 10% 18"-36" below Non-foreba 5-10% 86 to 172 810 47.0% 11% 7,160 415.3% 100% Summary of Proposed Ext. Wetland Bottom of Forebay/Micropool Elevation = 322.00 ft Permanent Pool Elevation = 325.00 ft Temporary Pool Elevation (1" Event) = 0.50 ft' Top of Berm Elevation = 329.50 ft Permanent Pool Surface Area = 4,900 sf` Temporary Pool (1" quality storage) = 1,700 cf Area @ Top of Shallow Land = 7,300 sf` Side Slopes of Pond = 3 1 Length-to-width ratio = 3 1 'Note: The actual, existing wetland area is approximately 20,000 square feet. The theoretical boudaries were used to design the wetland based on the watershed conditions. Otherwise the forebay and micro pool would be too large if based on the actual provided wetland size. C2_I \ KimleyHorn I , and Associates, Inc. Proposed Wetland Volumes Water Quality Volume Water Quality Volume for 1" Rainfall required = 1,724 Contour Incremental Accumulated Countour Area Volume Volume, S Stage, Z sq ft cu ft cu ft ft 322.00 133 0 0 -3.50 323.00 374 254 254 -2.50 324.00 840 607 861 -1.50 325.00 4,900 2,870 3,731 -0.50 325.50 7,350 3,063 6,793 0.00 Tamnorarv Pnnl Vnlump Countour Contour Area Incremental Volume Accumulated Volume, S sq ft cu ft cu ft 325.00 4,900 0 0 325.30 6,370 1,691 1,691 325.50 7,350 1,372 3,062 Dean Pools - Forphav Vnlump Countour Contour Area Incremental Volume Accumulated Volume, S s ft cu ft cu ft 322.00 64 0 0 323.00 206 135 135 324.00 391 299 434 324.50 757 287 __d 721 Deep Pools : Non-Forpbav Vnlump Countour Contour Area Incremental Volume Accumulated Volume, S sgft cult cult 322.00 56 0 0 323.00 169 113 113 324.00 449 309 422 324.50 819 317 739 Permanent Pool Temporary Pool hf4 rl?th Wet Detention Basin INCREMENTAL DRAWDOWN METHOD Project Information Project Name: Shiloh Crossing Wetland E KHA Project #: 015476039 Designed by: TSJ Date: 9/2010 Checked by: Date: Date: Design Resource: NCDENR - Stormwater Best Management Practices (July 2007) Water Quality Orifice * Incremental Determination of Water Quality Volume Drawdown Time Zone 2 Q3 = 0.0437 Co * DZ (Z-D/24-Ei)A"') Q2 = 0.372 Cc * D*(Z-Ei)A(32? Q, =0 Orifice Diameter (D) = 1.000 in Cd = 0.6 Ei = 325 Orifice Inv. Zone 1 Range = 325.00 to 325 Zone 2 Range = 325 to 325.0833 Zone 3 Range = 325.0833333 to 325.5 Incremental Drawdown Method Countour Contour Area Incremental Volume Stage , Z Zone Q Drawdown Time s ft cu ft It cis min 325.00 4,900 0 0.00 2 0.000 325.05 5,145 251 0.05 2 0.002 1,677 325.10 5,390 263 0.10 3 0.006 693 325.15 5,635 276 0.15 3 0.009 532 325.20 5,880 288 0.20 3 0.010 460 325.25 6,125 300 0.25 3 0.012 418 325.30 6,370 312 0.30 2 0.037 142 325.35 6,615 325 0.35 2 0.046 117 325.40 6,860 337 0.40 2 0.056 99 325.45 7,105 349 0.45 2 0.067 86 325.50 7,L50 361 0.50 2 0.079 76 Total 3,063 4,302 Drawdown Time = Incremental Volume / Q / 60sec/min Summary Total Volume = 3,063 cf Total Time = 4,302 min Total Time = 2.99 days Max Q= 0.079 cfs OF W A T?c9 ? oa o? .AC*_ > WDENR ° STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all the required information. L PROJECT INFORMATION Project name Shiloh Crossing - Stormwater Wetland E Contact name Austin Watts Phone number 704-319-5698 Date September 1, 2010 Drainage area number Phase III II. DESIGN INFORMATION Site Characteristics Drainage area 413,820.00 ft2 Impervious area 0.00 ftZ Percent impervious 0.0% % Design rainfall depth 1.00 inch Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Pre/Post 1-yr, 24-hr peak control Storage Volume: Non-SA Waters Minimum required volume Volume provided (temporary pool volume) Storage Volume: SA Waters Parameters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff volume Post-development 1-yr, 24-hr runoff volume Minimum volume required Volume provided Outlet Design Depth of temporary pool/ponding depth (DPiamS) Drawdown time Diameter of orifice Coefficient of discharge (CD) used in orifice diameter calculation Driving head (Ho) used in the orifice diameter calculation N/A in in/hr ft3/sec ft3/sec ft3/sec 1,724.00 ft3 3,060.00 ft3 OK N/A ft3 ft3 ft3 ft 3 ft 3 6.00 in OK 3.00 days OK 1.00 in Drawdown orifice diameter may be insufficient. Please provide adequate supporting calculations. 0.60 (unitless) 0.50 ft OK Form SW401-Wetland-Rev.6-11/16/09 Parts I and II. Project Design Summary, Page 1 of 3 Surface Areas of Wetiand Zones Surface Area of Entire Wetland 7,300.00 ff2 OK Shallow Land 2,400.00 ft2 OK The shallow land percentage is: 33%% Shallow Water 3,200.00 ft2 Insufficient shallow water area. The shallow water percentage is: 44% % Deep Pool Forebay portion of deep pool (pretreatment) 750.00 ft2 OK The forebay surface area percentage is: 10% % Non-forebay portion of deep pool 810.00 ft2 OK The non-forebay deep pool surface area percentage is: 11% % Total of wetland zone areas 7,160.00 ft2 Enter data into the shaded cells in this section. Add or subtract the following area from the zones -140.00 ft2 Topographic Zone Elevations Temporary Pool Elevation (TPE) Shallow Land (top) 325.50 It amsl Permanent Pool Elevation (PPE) Shallow Water/Deep Pool (top) 325.00 ft amsl Shallow Water bottom 324.50 ft amsl Most shallow point of deep pool's bottom 323.00 ft amsl Deepest point of deep pool's bottom 322.00 ft amsl Design must meet one of the following two options: This design meets Option #1, Top of PPE is within 6" of SHWT, If yes: (Y or N) SHWT (Seasonally High Water Table) ft amsl OK This design meets Option #2, Wetland has liner with permeability <0.01 in/hr, If yes: (Y or N) Depth of topsoil above impermeable liner 6.00 in OK Topographic Zone Depths Temporary Pool Shallow Land 6.00 in OK Permanent Pool Shallow Water 6.00 in OK Deep Pool (shallowest) 24.00 in OK Deep Pool (deepest) 36.00 in OK Planting Plan Are cattails included in the planting plan? N (Y or N) OK Number of Plants recommended in Shallow Water Area: Herbaceous (4'cubic-inch container) 800 Number of Plants recommended in Shallow Land Area: Herbaceous (4' cubic-inch container), OR 600 Shrubs (1 gallon or larger), OR 96 Trees (3 gallon or larger) and Herbaceous (4+ cubic-inch) 12 and 480 Number of Plants provided in Shallow Water Area: Herbaceous (4' cubic-inch container) Number of Plants Provided in Shallow Land Area: Herbaceous (4' cubic-inch container) Shrubs (1 gallon or larger) Trees (3 gallon or larger) and Grass-like Herbaceous (4+ cubic-inch) Form SW401-Wetland-Rev.6-11/16/09 Parts I and II. Project Design Summary, Page 2 of 3 Additional Information Can the design volume be contained? Y (Y or N) OK Does project drain to SA waters? If yes, N (Y or N) Excess volume must pass through filter. What is the length of the vegetated filter? 0.00 It Are calculations for supporting the design volume provided in the application? Y (Y or N) OK Is BMP sized to handle all runoff from ultimate build-out? (Y or N) Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? (Y or N) The length to width ratio is: 2.18 :1 OK Approximate wetland length 131.00 ft Approximate wetland width 60.00 ft Approximate surface area using length and width provided 7,860.00 ftz This approx. surface area is within this number of square feet of the entire wetland surface area reported above: Will the wetland be stabilized within 14 days of construction? Y (Y or N) OK Form SW401-Wetland-Rev.6-11/16/09 Parts I and II. Project Design Summary, Page 3 of 3 `q b N 3 a3 3 s. 0 .a O a. 0 R, w M a? Q aq S.+ i.+ Q N O ? O C ? O U zoo z a= o U U o x L u a? •O 0. W as b a 3 7.. Q «s L. O CQ 3 L O r.. L G ? M ^J o a. ? V ?n •0 O L O 6J .-. y ? CE ?O A N Y k? ?E u 7 0 e 7 c W 6l F t Y ? C } ' SNOISIA321 3LV0 ON OOOPELZ (U ) : O m M S Q Q j r 131 OSS09lLZL SVSNVAHV'3lIl NOIN38 tlNIlOk1VO H12JON ALNnoo 3NVM'3IIIASIH60A ° ( m0 121f10OS3lEif1S0Ntl4SAMHON ? -aNV igM € ?S 10 O X3?&4001N3WdMAA30 NO1lVM WVS O N? AN9 E ON-19-SW D 00-09ZV'ON3 0 2:OiVMAHOlS ° uj lS a - U ? As a°?? z 121dW 1dM 3111ASINNOW•IMVW* IVM a k Y maa?=., d ?LN3ro :iO3road ?3uu o BM '100 O41aw0 WI!VS\?aDlo? A0N OMO\EUKw?? 40145 I?DW-pM - 6LtlBLh5l0\pl?wuo{nu3-?YN\:N 0.5ft TW 2.5cfs-30" RCP - Shiloh Glenn GVF Input Data Downstream Depth Upstream Depth Length Number Of Steps GVF Output Data Profile Description Profile Headloss Normal Depth Conjugate Downstream Velocity Upstream Velocity Channel Slope Discharge Normal Depth Critical Depth S2 0.50 ft 0.52 ft 114.00 ft 10 0.59 ft 0.00 ft 3.58 ft/s 3.41 ft/s 0.00500 ft/ft 2.50 ft'/s 0.50 ft 0.52 ft GVF Profile Image Ye=0.52ft Yn • 0.50 ft X114.00 ft V: 12.69433 L R1 Bentley Systems, Inc. Haestad Methods So®lidWiitberMaster V81 (SELECTseries 1) [08.11.01.03] 6/15/2010 3:03:34 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1.203-755.1666 Page 1 of 1 aft TW 2.5cfs-30" RCP - Shiloh Glenn GVF Input Data Downstream Depth Upstream Depth Length Number Of Steps 3.00 ft 2.43 ft 114.00 ft 10 GVF Output Data Profile Description Profile Headloss Normal Depth Conjugate Downstream Velocity Upstream Velocity Channel Slope Discharge Normal Depth Critical Depth S1 0.00 ft 0.00 ft 0.51 ft/s 0.51 ft/s 0.00500 ft/ft 2.50 W/s 0.50 ft 0.52 ft GVF Profile Image -•-- YC=0.52 ft Yn a 0,50 ft 114.00 ft V: 10.7201 H 1 Bentley Systems, Inc. Haestad Methods SoBlis6ie4Eii6wMaster V8i (SELECTseries 1) (08.11.01.03] 6/15/2010 3:04:52 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 0.5ft TW 15cfs-30" RCP - Shiloh Glenn GVF Input Data Downstream Depth Upstream Depth Length Number Of Steps GVF Output Data Profile Description Profile Headloss Normal Depth Conjugate Downstream Velocity Upstream Velocity Channel Slope Discharge Normal Depth Critical Depth S2 0.50 it 1.31 ft 114.00 it 10 0.60 it 0.00 ft 5.96 ft/s 5.78 ft/s 0.00500 ft/ft 15.00 ft'/s 1.28 it 1.31 it GVF Profile Image Ycs1.31 ft Yn-1.28 ft `?-114.f0 ft V: 12.69433 L Ft 1 Bentley Systems, Inc. Haestad Methods So®/idbgdiiMsrMaster V8i (SELECTseries 1) [08.11.01.03] 6/1512010 3:01:36 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 3ft TW 15cfs-30" RCP - Shiloh Glenn GVF Input Data Downstream Depth Upstream Depth Length Number Of Steps GVF Output Data Profile Description Profile Headloss Normal Depth Conjugate Downstream Velocity Upstream Velocity Channel Slope Discharge Normal Depth Critical Depth S1 3.00 ft 2.58 ft 114.00 ft 10 0.15 ft 0.00 ft 3.06 ft/s 3.06 ft/s 0.00500 ft/ft 15.00 ft'/s 1.28 ft 1.31 ft GVF Profile Image <r..>. a.a..a......a......... Ye ¦ 1.31 ft Yn =1.28 ft 114.00 ft V 10.7201 L H 1 Bentley Systems, Inc. Haestad Methods SoBlimie4~Master V8i (SELECTseries 1) [08.11.01.03] 6/1512010 2:59:19 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Previous Correspondence and Documentation w???,r,? RD ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Dee Freeman Director Secretary June 28, 2010 CERTIFIED MAIL #7009 0080 0000 9764 9928 RETURN RECEIPT RE VESTED Wal-Mart Stores East, LP Attn: Mr. Fred Lutz Sam Walton Development Complex 2001 SE 10" Street Bentonville, AR 72716-4050 CERTIFIED MALI, #7009 0080 0000 9764'993* 5 RETURN RECEIPT RE UESTED Shiloh Morrisville LLC c/o USAA Real Estate Company Attn: Mr. Phillip R. Moltz 9830 Colonnade Blvd Suite 600 San Antonio, TX 78230 Subject: DWQ Review of Responses to NOTICE OF VIOLATION (NOV-2010-WQ-0012) for DWQ Project #04-1764, Shiloh Crossing Shopping Center, Wake County and Durham County Dear Messrs: Lutz and. Moltz: On March 12, 2010, the Raleigh Regional Office of the Division of Water Quality (DWQ) issued a NOTICE OF VIOLATION (NOV-2010-WQ-0012) for DWQ Project #04-1764, for the tract/project known as the Shiloh Crossing Shopping Center, on NC54 in Morrisville, in both Wake and Durham Counties North Carolina. The stream on the site is an unnamed tributary to Stirrup Iron Creek, Class C, Nutrient Sensitive Waters (NSW), in the Neuse River Basin. In response to the NOV, DWQ received several submittals from several parties. The submittals are listed in Attachment A. At the request of each party, DWQ met to discuss the responses. On May 26, 2010, DWQ met with Kimley-Horn and Associates, Inc. staff who were representing Wal-Mart Stores East, LP and on June 16, 2010, DWQ met with Soil & Environmental Consultants, PA and Priest, Craven & Associates, Inc who were representing Shiloh Morrisville LLC. In the NOV Requested Response section, DWQ requested nine specific items. Those items are listed again in Attachment B as a reference. Items #2 and #7 pertain to construction stormwater NPDES General Permit No. NCG010000 compliance and compliance with the Division of Land Resources-delegated local erosion and sedimentation control programs. Two devices remain as temporary skimmer basins on the site. Records were not provided to DWQ as required by the NPDES General Permit. Please respond to these items. In order to resolve the violations cited in the March 12, 2010 Notice of Violation, the 401 Water Quality Certification and Buffer Authorization (DWQ Project # 04-1764) will need to be implemented on site as approved or appropriately modified. It is the understanding of this office that a modification of 401 Water Quality Certification and Buffer Authorization is necessary due to current site specific constraints and exceedences of approved impacts. This certification/authorization is applicable to both parties; thereby both parties need to jointly submit this modification request together. Also, it is noted that Item None hCarolina North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 791.4200 Customer A0711,# Service Internet www.ncwatefquality.org 1828 Mail Service Center Raleigh, NC 27899-1828 FAX (919) 788-7159 877-623.8748 An Equal Opportunity/Affirmative Action Employer - 50% Recycfed/10% Post Consumer Paper Shiloh Crossing Shopping Center June 28, 2010 Page 2 #3,4, 5, 6, 8 and 9 were only conceptually addressed through the NOV responses. These items will need to be fully addressed in the 401 Certification/Buffer Authorization modification request. This modification request is expected to be received by the 401 Wetlands Permit Unit (NC DWQ, 401/Wetlands Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650: http://www.saw.usace.army.miV WETLANDS/pcn/) within 90 days of the date of this letter (September 28, 2010). If by the aforementioned date, an appropriate modification request is not submitted, it is the intention of this office to pursue civil penalties regarding these matters. Please note these violations are subject to civil penalties as s.ments of up to $25,000 per day per violation. Thank you for your attention to this matter. Should you have any questions regarding these matters, contact Natalie Landry at (919) 791-4200. S' cerel Danny Smith Regional Supervisor Surface Water Protection Section Attachment A Attachment B cc: Raleigh RO - Water Quality John Hennessy, NPS Assistance and Compliance Oversight Unit fan McMillan, 401 Wetlands Permitting Unit, 1650 MSC, Raleigh, NC 27604 Cindy Karoly, Archdale Building - 9th Floor USACE Raleigh Regulatory Field Office , Wake County Water Quality Div., 336 Fayetteville Street, Raleigh, NC 27602 Chris Roberts, Durham County, 120 E. Parrish St., I" Floor, Durham, NC 27701 Keith Billy, Town of Morrisville, 260 Town Hall Dr., Suite B, Morrisville, NC 27560 Austin Watts, Kimley-Horn, PO Box 33068, Raleigh, NC 27636-3068 gTddd St ' John imley=Horn; PO Box 33068, Raleigh, NG 27636=3068 Kevin Martin, S&EC, 11010 Raven Ridge Road, Raleigh, NC 27614 Bradley Bowling, Priest, Craven & Assoc., 3803B Computer Dr., Raleigh, NC 27609 Attachment A DWQ submittals received in response to the NOV. 1. On March 19, 2010, DWQ received a letter via the USPS from CT Corporation. CT Corporation returned the documents because, "You have indicated several corporate entities represented by CT Corporation System upon which you intend to make service. We request that you either forward a complete set of documents for each entity, or indicate which entity you are serving." 2. On March 19, 2010, DWQ received a copy of a letter via USPS from Holly H. Alderman (Schell Bray Aycock Abel & Livingston PLLC) addressed to Ann H. Stuart (Troutman Sanders LLP) and Wal-Mart Stores East, LP regarding "Default under the Joint Development Agreement dated October 18, 2006 (the "JDA") between Wal-Mart Stores East LP ("Wal-Mart") and Shiloh Morrisville, LLC ("Shiloh"). 3. On April 9, 2010, DWQ received a letter via email from Steven Mitchael (Wal-Mart) requesting an extension for responding to the NOV. The requested date was April 30, 2010. 4. On April 16, 2010, DWQ received a letter via Federal Express from Holly Alderman (Schell Bray Aycock Abel & Livingston PLLC) regarding "Response of Shiloh Morrisville, LLC ("Shiloh") to Notice of Violation 2010-WQ-0012; DWQ #04-1764 issued by the North Carolina Department of Environment and Natural Resources-Division of Water Quality ("DWQ") dated March 12, 2010 and received March 17, 2010 at 11:22 am (the "NOV"); Shiloh Crossing Shopping Center (the "Project"). 5. On April 16, 2010, DWQ received a letter via USPS from Thomas F. Craven (Priest, Craven & Associates, Inc.) regarding "Additional Concerns, NOV-2010-WQ-0012, DWQ #04-1764 - Shiloh Crossing, 401 Water Quality Certification Violations, Wake County and Durham County." 6. On May 4, 2010, DWQ received a letter from Austin L. Watts (Kimley-Hom and Associates, Inc.) regarding "Wal-Mart and Sam's Club Morrisville, NC, Store #4250-00 and 6668-04, DWQ Notice of Violation Response." 7. On June 8, 2010, DWQ received a letter via courier from Bradley Bowling (Priest, Craven & Associates, Tnc.) regarding "Shiloh Crossing-Phase One-Additional Items of Concern (NOV). Attachment B Requested Response Items that were listed in the March 12, 2010, NOTICE OF VIOLATION (NOV- 2010-WQ-0012). L Please provide documentation (including a detailed site map/survey) depicting all jurisdictional water features (e.g. streams, wetlands and buffers) on the site. This documentation should describe and quantify the impacts to those jurisdictional features and should include plans to avoid further unauthorized stream, buffer and wetland impacts on the site. 2. Please provide documentation showing erosion and sediment control practices in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices. .3. Existing stream dimensions must be maintained above and below locations of each culvert. Provide documentation showing that Stream Impact #1 culvert has been installed in such a manner that the original stream profiles are not altered above and below the culvert. a. Show that the culvert has not and will not cause aggradation or erosion of the stream up or down stream of the culvert. b. Show that the culvert provides for continuity of water movement and can adequately accommodate high water or flood conditions. Provide documentation showing the as-built condition of the stormwater drainage system at Stream Impact #2 and provide documentation of appropriate buffer authorizations for existing impacts. 5. Provide a Plan that addresses non-diffuse flow in the Neuse Riparian Buffer Zones 1 and 2 for the entire site. 6? Provide documentation that shows the final stormwater management facilities for Phase I were constructed in accordance with the approved stormwater management plans received on May 15, 2007. Include in this documentation an As-Built for Wetland A, the wetland plantings and associated soil conditioning for Wetland A, and verification from the engineer that the fence on the spillway will not impede water flow or unduly block debris resulting in impeded water flow during a large rain event. 7. Provide NPDES rainfall and BMP monitoring records for the temporary skimmer basin (Extended Detention Pond B) that is covered under the Division of Land Resources-Delegated Local Program Wake County Erosion and Sedimentation Control Permit program. 8. Remove the temporary skimmer basin (Extended Detention Wetland E) or convert to an extended detention wetland. 9.._ Provide documentation showing the level spreaders were constructed and installed as designed. Submit a Plan that addresses the Operation and Maintenance problems at all level spreaders, including a timeline. KimleyHorn ?? and Associates, Inc. April 30, 2010 ¦ Natalie Landry Sate 300 4MI CChadoft Raleigh Regional Office charlotte, Borne Q hadone, North carolire 3800 Barrett Drive 28217-1911 Raleigh, NC 27609 Re: Wal *Mart and Sam's Club Morrisville, NC Store #4250-00 and 6668-04 DWQ Notice of Violation Response KHA Ref: 015476039, 038 Dear Ms. Landry Please find the attached response to the NOV dated March 12, 2010, that we are submitting on behalf of Wal-Mart. The response includes proposed solutions to address the items listed in the NOV as requiring a response. Please note that none of the items requiring a response are physically located on land owned by Wal- Mart. As such, Wal-Mart cannot commit to implementing the proposed solutions unilaterally. However, if the Division finds the solutions acceptable, we will continue working with the property owner to attempt to rectify the issues in a timely manner. We would like the opportunity to meet with you to review and discuss each of our responses in detail as well. Sincerely yours, KIMLEY-HORN AND ASSOCIATES, INC. uWatts, P.E. Cc: Todd St. John, P.E. Gayla Hoipkemeier, P.E. ¦ TEL 704 333 5131 FAX 704 333 0845 1. Please provide documentation (including a detailed site map/survey) depicting all jurisdictional water features (e.g. streams, wetlands and buffers) on the site. This documentation should describe and quantify the impacts to those jurisdictional features and should include plans to avoid further unauthorized stream, buffer and wetland impacts on the site. Response: Please reference the attached Overall Site Plan and Figures. The Figures show the plan to replant the impacted buffer area. No further impacts are anticipated. 2. Please provide documentation showing erosion and sediment control practices in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices. Response: The Stormwater Pollution Prevention Plan (SWPPP) binder that includes all of the daily reporting has been requested from the General Contractor. 3. Existing stream dimensions must be maintained above and below locations of each culvert. Provide documentation showing that Stream Impact #1 culvert has been installed in such a manner that the original stream profiles are not altered above and below the culvert. a. Show that the culvert has not and will not cause aggradation or erosion of the stream up or down stream of the culvert. b. Show that the culvert provides for continuity of water movement and can adequately accommodate high water or flood conditions. Response: Aggradation has already been documented at the upstream culvert inlet. This is because the culvert was placed in a deep pool to bury the culvert invert the required 0.5 feet below the stream bed in that location, and, as a result, is submerged. The deep pool invert elevation appears to have been approximately 2 to 2.5 feet below the normal water surface elevation. The deep pool existed because of a downstream bed rock outcrop that begins approximately 26 feet downstream of the culvert outlet (see Figure 1). The bedrock appears to consist of brown sandstone or mudstone. The outcrop is approximately 45 feet long in the direction of the stream with an unknown width. The bed rock vertical thickness appears to be more than 5'. The width of the outcrop is beyond the width of the stream in all locations checked (by hand auger). Our recommendation for addressing the aggradation is to lower the stream invert by cutting a notch in the rock approximately 2.3 feet wide at the base (with straight sides). The elevation of the notch will begin at an elevation 0.5 feet above the invert of the downstream culvert outlet and will chase that elevation until it reaches in the invert of the bed rock or the end of the bed rock outcrop. The bed rock ends at a small drop approximately 2.5 feet or more above the downstream invert of the stream. Since the notch would be made into bedrock, it should not result in instability. Also, lowering the invert would remove the backwater effect and reduce aggradation. An ICPR stormwater model was used to compare the culvert configuration approved by DWQ, the as-built conditions, and culvert performance with the notch added. A summary of the results can be found in the tables below. SC-1. DWQ Approved Design - 36" RCP culvert with dual (2) 24" RCP floodplain pipes (no tailwater); SC-2. Construction Drawing Design Condition - 30 " RCP culvert as modeled for CDs (no tailwater condition); SC-3. As-built Conditions - 30 " RCP culvert with tailwater condition Upstream Water Surface Elevation (WSE) and Comparison Note: Road Surface Elevation = 350.72' 2-yr 30-yr 25-yr 50-yr 100- 100-yr 2-YR 10-yr 25-YR 50-YR Scenario delta delta delta delta YR delta WSE WSE WSE WSE SC-1 SC-1 SC-1 SC-1 WSE SC-1 ft ft ft ft ft ft ft ft ft ft SC-1 334.38 -- 1 340.75 -- 341.92 342.83 - 343.59 - SC-2 336.62 2.24 341.90 1.15 343.48 1.56 344.48 1.65 345.25 1.66 SC-3 337.52 3.14 342.11 1.36 343.67 1.75 344.64 1.81 345.40 1.81 Peak Culvert Discharge and Comparison 2-yr 10-yr 30-yr 25-yr 25-yr 50-yr 50-yr 100-yr 100-yr 2-yr Peak Scenario delta Peak delta Peak delta Peak delta Peak delta Discharge SC-1 Discharge SC-1 Discharge SC-1 Discharge SC-1 Discharge SC-1 CfS CfS CfS CfS CfS CfS CfS CfS Cfs Cfs SC-1 46.97 -- 112.31 - 127.29 - 146.87 -- 154.48 -- SC-2 43.70 -3.27 65.28 -47.03 70.47 -56.81 73.55 -73.32 75.85 -78.63 SC-3 42.06 -4.91 60.03 -52.28 62.08 -65.21 68.05 -78.82 70.29 -84.20 Changing the design of the culvert configuration can have an impact on the downstream peak discharge for the ]-year 24-hour, 2 -year 24-hour, and 10 year 24-hour storm events. These peak discharge values were compared at the project site boundary within the ICPR model. The table below provides the peak discharge comparison for each scenario versus the pre-development conditions. Peak Discharge From Site - Pre vs. Post Comparison 100-yr 1-yr Peak 1-yr % 2-yr Peak 2-yr % 10-yr % delta Scenario Peak Peak Peak Peak Discharge decrease Discharge decrease decrease from Discharge Discharge SC-1 CfS Cfs CfS Cfs Cfs CfS CfS Cfs Pre-Dev 50.78 81.39 191.64 _ 383.61 _ SC-1 45.69 -10.02% 66.08 -18.80% 195.39 1.96% 435.64 13.56% SC-2 43.67 -14.00% 61.93 -19.46 161.02 -30.62 402.99 19.38 SC-3 42.83 -15.65% 60.36 -21.03 155.57 -36.07 398.50 14.89 Based on the design provided by the geotechnical engineer, the road and retaining walls were designed for impounded conditions. See attached letter. Also included is a 2 yr, 24-hr storm event hydrograph graphically depicting the similarities of SC-1, SC-2, and SC-3. 4. Provide documentation showing the as-built condition of the stormwater drainage system at Stream Impact #2 and provide documentation of appropriate buffer authorizations for existing impacts. Response: To our knowledge, no approval was granted to impact the referenced buffer. As such, it is proposed that the buffer be re-established per Figure 2. Additionally, the bypass channel was altered as the result from comments by NCDOT. The existing bypass for Level Spreader 4 does not segregate the bypass flow from the diffuse flow of the level spreader. As such, Figure 2 and Figure 3 also show a proposed configuration for a riprap swale to separate bypass flow from diffuse flow. Provide a Plan that addresses non-diffuse flow in the Neuse Riparian Buffer Zones 1 and 2 for the entire site. Response: There were areas of concern (see Figure 4) that were noted upon visiting the site. Areas of Concentrated Flow and Gulleys- Gulleys were noted as a result of concentrated flow through the buffer (upstream of the culvert on the left bank). Most of these were caused by water bypassing riprap dissipater pads from up gradient level spreader bypass drain outlets. The riprap swales at two outlets need to be repaired and conveyed down to the stream to prevent further concentrated flow. Log snags consisting of core fiber logs or natural logs staked into the ground can also be added perpendicular to concentrated flow in order to diffuse the flow through the buffer. The is an additional area of concentrated flow located just upstream of the Stream Impact#1 road crossing on the right bank, against the retaining wall. To address concentrated flow in this area, it is proposed to extend a small berm to create a level spreader to diffuse the flow across the buffer. 6. Provide documentation that shows the final stormwater management facilities for Phase 1 were constructed in accordance with the approved stormwater management plans received on May 15, 2007. Include in this documentation an As-Built for Wetland A, the wetland plantings and associated soil conditioning for Wetland A, and verification from the engineer that the fence on the spillway will not impede water flow or unduly block debris resulting in impeded water flow during a large rain event. Response: (2 Options) Option ]-The pond can be built according to the approved plans. This includes re-grading the bottom of the wetland to plan grades, adding additional topsoil as needed, and re planting. The side slopes of the wetland will also need to be re-graded to their correct slopes per the plans (3:1). Option 2- Wal-Mart submits a new wetland plan to DWQ that meets their criteria. This may include reconfiguring the bottom of the pond, providing the appropriate amounts of top soil, changing the planting plan, and possibly making adjustments to the outlet structure. This would also include providing 3:1 side slopes for the berms as well. However, this could be achieved as the original wetland was somewhat oversized based on the design criteria in place at the time. It is assumed that DWQ would allow the design to be provided based on the old criteria. An ICPR model was run to determine if the fence over the emergency spillway would impede water flow or block debris resulting in impeded water flow during a large rain event. The outcome of the model substantiated that the stage for the 100 year, 24-hour storm event is 0.63 feet above the stage of the emergency spillway. If the bottom of the fence is less than 0.63 feet above the spillway it would be possible to remove a potion of the bottom of the fence to satisfy the required depth over the spillway to convey large storm events. 7. Provide NPDES rainfall and BMP monitoring records for the temporary skimmer basin (Extended Detention Pond B) that is covered under the Division of Land Resources-Delegated Local Program Wake County Erosion and Sedimentation Control Permit program. Response: The Stormwater Pollution Prevention Plan (SWPPP) binder that includes all of the daily reporting has been requested from the General Contractor. 8. Remove the temporary skimmer basin (Extended Detention Wetland E) or convert to an extended detention wetland. Response: Wal-Mart should take no exception to the owner removing this basin or converting it to a Stormwater Wetland. If a stormwater wetland were designed based on the current criteria and watershed condition (i. e. no impervious cover), the estimated surface area of such a wetland is approximately 3,500 square feet. This wetland could be established within the footprint of the existing basin. The outlet of the basin could also be modified to meet the drawdown requirement. Figure 5depicts the approximate footprint of a 3,500 square foot wetland. 9. Provide documentation showing the level spreaders were constructed and installed as designed. Submit a Plan that addresses the Operation and Maintenance problems at all level spreaders, including a timeline. Response: Upon site review, level spreaders 1, 2, and 4 appear to be constructed to at least the designed lengths and appear to be functioning properly. Level spreader 3 appears to have been constructed 3 feet shorter than the original design. This level spreader can be lengthened as needed; however it appears to be functioning. The issues noted in items 4 and 5 above are related to the level spreader bypass conveyances and proposed means of correcting those issues are described above as well. Design Length (ft) As-built Length* Level Spreader 1 43 43'-4" Level Spreader 2 77 77'-1" Level Spreader 3 59 56'-0" Level Spreader 4 42 42'-0" *As measured using a measuring tape in the field. As mentioned above, other than the issues described in responses 4 and 5 above, the level spreaders appear to be functioning adequately. Implementing the recommendations described above should address the immediate issues. In regards to long-term maintenance items, following the existing Operation and Maintenance Agreement should be adequate to identify and address any future issues. FIGURES isn't 0 25 50 ' Feet a ,? /? Proposed Bedrock Notch j / (2.3 feet wide) ' d- 941, r s• N rr F ?r Stream Culvert 'PIM(under Shiloh Glenn Dr.) 'Aw f i rt 3Sd' ,y5 mow" jj {W WY T E n \\ i ? N- . Y y n? u? s k? Title Culvert Crossing Project Shiloh Crossing NOV Response Prepared For: Wake County, North Carolina Date Project Number Figure 4/16/10 015476039 1 Prepared by Josh Allen rMn grer-an 0 20 40 4 \\ Feet A" s .: Proposed i Buffer Re-Vegetation m P!' / I Y s? 4 I y VVV x\ / Proposed Riprap ._;• Swale ® ax *, 1 t? /! VA v Planting List #',? Legend 2" Calioer Trees 0 2" Caliper Trees 9 -- Willow Oak (Quercus Phellos) ° 9 -- Water Oak (Quercus Nigra)k Proposed Riprap Swal A f?l Title Buffer Re-planting Plan Project Shiloh Crossing NOV Response Prepared For: Wake County, North Carolina Date Project Number Figure 4/16/10 015476039 2 Prepared by Josh Allen rMn =__ , ?. Y G u L O T F Q z a 3 a s 0 v z r pPp d ?C O h 3 ? a E a c o , c ? K Prepared by Josh Allen C_PI =11 aawcvn. K. S&ME January 29, 2010 Kimley-Horn and Associates, Inc. 4651 Charlotte Park Drive, Suite 300 Charlotte, North Carolina 28217 Attention: Mr. Austin Watts. P.E. Reference: Retaining Wall Design Calculations Wal-Mart #4250 and Sam's Club #6668 Morrisville, North Carolina S&ME Project No. 1053-06-205C Dear Mr. Watts: As requested, S&ME, Inc. has performed retaining wall design services for the above referenced project. This addresses questions about the design criteria used for retaining walls designated Shiloh-4 and Shiloh-5, specifically the depth of potentially impounded water. The cast-in-place and mechanically stabilized earth (MSE) sections of the wall are designed to be fully submerged. The walls are backfilled with free draining material as required by the note on Sheet RW-l2 that states "The backfill for CIP wall and reinforced fill to MSE wall shall be NCDOT No. 57 Stone." In addition, attached are sample external stability calculations for each CIP wall showing that the designs were completed assuming the high water elevation equaled the top of the walls. We appreciate the opportunity to work with Kimley-Horn and Associates providing the geotechnical consultation for this project. Should you have any questions regarding the information in this report, please do not hesitate to contact us. Sincerely, C A /i 0? /i S&ME, Inc. •4ESS/0*!9'% Visten H. Hill, Pa. 2047 Project Engineer % ,?; Fi{rGj??a:? N.C. Registration 1 y"eW". ,H;?i?`??` )A_m Duane D. Bents, P.E. Geotechnical Department Manager SWE, INC. / 9751 Southern Pine Boulevard / Charlotte, NC 28273-5560 1 p 704.523.4726 IF 704.525.3953 / www.smainc.com s&mE I toJErrNo. 1051-06-205C suEE-r No. 1 / 15 DATE September 11, 2007 ]oDNAP1E Shiloh Crossing-Morrisville co&ij-l1TEDIIY KHH SUBJECT Shiloh-4 16 ft section - External Stability CHECKED BY OBJECTIVE: Evaluate the external stability of the 16 ft exposed height section of Shiloh-4 assuming the retained soil is 1) washed stone and 2) drainage stone, 3) HW elev at top of exposed wall. SUMMARY: SUMMARY Overturning Slid ing Bearing Capacity Minimum Calculated Minimum Calculated Minimum Calculated Stability Safety Safety Safety Safety Safety Safety Factor Factor Factor Factor Factor Factor 2 5.8 1.5 1.5 3 5.8 OK DEFINITION OF VARIABLES: ao = angle to outer friction plane a,,. = angle from heel of retaining wall to the top of the stem 0 = angle of slope above retaining wall y = unit weight yb = buoyant unit weight 7,,, = unit weight of water S = angle of wall friction ? = soil friction angle A = width of stem B = base length of wall c cohesion of bearing soil P, =-adhesion facior C = length of heel - D = width of heel/toe Dr= depth of bottom of footing e = eccentricity E = height of key F = length of toe FB = factor of safety against bearing capacity failure Fo = factor of safety against overturning FR = sum of forces resisting sliding Fs = factor of safety against sliding G = horizontal component of slope of soil behind fill H = height of key H, = depth to water table H, = depth from water table to bottom of stem I = width of key S:ll3"ROJECTYM07\135(A)7-007 Out. Comfy-Pm= Pat DMICalculabmsUicadwdldlkmcipsl Spill-y Eei=dUkiocpal SpiDuay H.duaR E,d ml SubaUy.d. S&ME PROJECr No. 1051-06-2050 SHEET No. 2/15 DATE September 11, 2007 IOD NAME Shiloh Crossing -Morrisville coo-murED BY KHH suBaEcr Shiloh-4 16 ft section -External Stability CHECKED BY KA = active earth pressure coefficient Kp = passive earth pressure coefficient MO = sum of moments overtunung MR = sum of moments resisting overturning Ne, Nq, Ny = bearing capacity factors P. = active earth pressure Ph = horizontal component of active earth pressure Pp = passive earth pressure P,, = vertical component of active earth pressure q = surcharge qh = pressure at heel of footing qt = pressure at toe of footing q„ = ultimate bearing capacity R = sum of vertical forces KNOWN VARIABLES: 0 =tari'(1/3) = 180 [Ref. 3] 'YsDi1 = NA [Ref. 1 ] ystone = 130 pef [Ref. 1 ] Y.1er = 62.4 pcf 8 = 17.3 degrees [assumed] tNoil = NA [Ref. 1 ] stone = 360 [Ref, 1 I] c = 0 psf [assumed] Fn,MIN = 3.0 [Ref. 2, Section 19.5] Fo,mfN=2A [Ref 2, Section 19.51 I a - sutrl of forces resisting slicking Fs,MIN = 1.5 [Ref. 2, Section 19.5] q =250 psf [assumed] S:11356TRD1ECrSl011T13564>14M17 Gram Cmwl9•VOSIIw Val•DuplCgleulaliwtWn+lu?llrprpidp?l SIdIN,1y KwM;Pft1CipJ Spillnar Reidnil Ralmw SUdRhy.da 016-- OEM PitorEcr No. 1051-06-2050 .I SHEEr NO. 3 115 DATE September 11, 20{}7 1ODNAME Shiloh Crossing -Morrisville comp TrEDIIY KHH sutuEcr Shiloh4 16 ft section - External Stability CHEESED BY CALCULATIONS: 1. Estimate headwall geometry for stability analysis G -I- P T. O E B TABLE 1: HEADWALL DIMENSIONS A ft B ft C ft D ft E ft F ft G ft H ft I ft 2.5 18.5 14 2.5 5.5 2 2.5 19.5 2.5 2. Check applicability of Rankine's Equation Rankine's equation applies if the outer failure plane does not intersect the retaining wall. 90-0 e-,B aD= 2 -- 2 sin ,8 sin.- = sin 0 [Ref. 2, Eq. 19.1 b] [Ref. 2, Eq. 19.2] 5:11356U'R076CTSLW711336a7'laM7T GW. C-Iy-Pe . Put UamlCilcvlriunNiealh?ill?Nrronryil SpM%,4> Cmcm3lftanpA Sryll?a> Hf &34 Ucro.41 SlalAap.Jac S&INE FOR NAME Shiloh Crossing - Morrisville sunJEcr Shiloh-4 16 ft section - External Stabili a,,, =tan-'(H) PROJECT NO. 1051-06-2050 511E6'T NO. 4/ 15 DATE September 11, 2007 COMPUTEDav KHH CHECKED by TABLE 2: RANKI NE'S EQUATION A PPLICABILITY (degrees) (degrees) E a° (degrees) a, (degrees) Rankine Equation Applicability 36.0 18.00 31.72 20.14 35.7 Rankine Equation is Applicable 3. Calculate Rankine active earth pressure for saturated and submerged conditions for 1) embankment fill material and 2) drainage stone Pa = gHKA + ? VH1 KA +YH,H,K., + ? H, U bKA + K;, = cos fl Cos # - cos; Q -- cos? - (for soil retained by wall) cos,8 + cos' j8 - cos- 0 Kl = 1 + sin o (for soil in front of toe) 1-sin¢ P1, = Pa cos Q P, = Pa sin P 1 , Pmater = Y,taNrH- [Ref. 2, Eq. 11.19] [Ref. 2, Eq. 11.241 [Ref. 2, Eq. 11.15a] [Ref 2, Section 19.5] [Ref. 2, Section 19.51 TABLE 3 : RANK INE ACTIVE EA RTH PRESSURE Material Conditro.n H' feet q (psf kA KP (feet) pa fblft ph Iblft lblft Soil Saturated 0 19.5 250 0.296 3.852 17105 16267 5286 Soil Submerged 0 19.5 250 0.296 3.852 17105 16267 5286 Stone Saturated 0 19.5 250 0.296 3.852 17105 16267 5286 Stone Submerged 0 19.5 250 0.296 3.852 17105 16267 5286 The horizontal component of active earth pressure is the driving force and adds to instability. The largest horizontal force is the controlling driving force. In this case, the controlling condition is submerged soil. TABLE 4: CONTROLLING DRIVING FORCE Material Condition Ph Controlling Ph (b/ft Iblft Soil Saturated 16267 Soil Submerged 16267 Stone Saturated 16267 16267 Stone Submer ed 16267 5:U37l4PRO1ECTSL+txmI351i.U7.lxn Ganan Comny-I?ouoa puk pamlCdculaimdFiradxn11N4indlul 5pilhra? EucmmUhindwl Splluay Hnda?R Exlrnul Sulnfdy.da AIL S&ME JOB NAME Shiloh Crossing - Morrisville SUBJEcr Shiloh-4 16 ft section - External Stability 4. Calculate resisting forces and moments acting on the retaining wall about point O for saturated and submerged conditions for 1) embankment fill material and 2) drainage stone, ignore the effects of the key TABLE 5: SATURATED FORCES AND MOMEN TS - SOIL Section Area ft' y c Weight Iblft) Lever Arm (ft) Moment (ft-Iblft) Stem 42.5 150 6375 3.25 20719 Footing 46.25 150 6938 9.25 64172 Retained Soil 238 130 30940 11.5 355810 Retained Soil sloe 39.20 130 5096 13.83 70495 Water - - - - - Vertical Rankine Pressure 5286 18.5 97784 R = 54634 Mr= 608979 TABLE 6: SUBMERGED FORCES AND MOMENTS - SOIL Section Area ftZ 7 c Weight (lb/ft) Lever Arm (ft) Moment (ft-lb/ft) Stem 42.5 150 6375 3.25 20719 Footing 46.25 150 6938 9.25 64172 Retained Soil 238 67.6 16089 11.5 185021 Retained Soil sloe 39.20 130 5096 13.83 70495 Water 238 62.4 14851 11.5 170789 Vertical Rankine Pressure 5286 18.5 97784 R = 54634 Mr= 608979 TABLE 7: SATURATED FORCES AND MOMENTS - STONE Section Area y Weight Lever Arm moment Stem 42.5 150 6375 3.25 20719 Footing 46.25 150 6938 9.25 64172 Retained Soil 238 130 30940 11.5 355810 Retained Soil sloe 39.20 130 5096 13.83 70495 Water - - - - - Vertical Rankine Pressure 5286 18.5 97784 R = 54634 Mr= 608979 PROJECT NO. 1051-06-205C SHEETNO. 5 115 DATE September 11, 2007 COAIPUTEB BY KEH CHECKED BY S.1135(,IPEOJECTSLWTU33G4)14M1T Gait-Cmly.PGAM Pak P=T3WAi=%C wAIh -fiNCi 3I 5pjNW4y En MIN-n cipal 5pi5W2y HCM*IH HOMW SiAdgy doe S&ME PROJECT NO. 1051-06-205C SHEETNo. 6 / 15 DATE September 11, 2007 ]o,3 NARIE Shiloh Crossing -Morrisville COMPUTED HY KHH SuDJEcT Shiloh-4 16 f1 section- External Stability CHECKED BY TABLE 8: SU BMERGED FORCES AND MOMENTS - STONE Section Area ftz y c Weight (lb/ft) Lever Arm (ft) Moment (ft-lb/ft) Stem 42.5 150 6375 3.25 20719 Footing 46.25 150 6938 9.25 64172 Retained Soil 238 67.6 16089 11.5 185021 Retained Soil sloe 39.20 130 5096 13.83 70495 Water 236 62.4 14851 11.5 170789 Vertical Rankine Pressure 5286 18.5 97784 R = 54634 Mr= 608979 The lowest resisting force and moment control. In this case, the controlling condition is submerged stone. TABLE 9: CONTRO LLING RESISTING FORCE / MOM ENT Material Condition R (lb/ft) MR (lb-ft/ft Rmin Ib/ft MR,min lb-ftlft Soil Saturated 54634 608979 Soil Submerged 54634 608979 Stone Saturated 54634 608979 54634 608979 Stone Submerged 54634 608979 5. Clieck factor of safety against overturning assuming controlling conditions F MR.min 0 = 1ll0 AIo = P,, 3 [Ref. 2, Eq. 19.7a] [Ref 2, Eq. 19.7b] TABLE 'l0: CHE^i's OVI RTURNING _ MR,min Mn p FO iNIN Stability (lb-ftlf# (lb-ft/ft , 608979 105738 5.8 2.0 OK 6. Check factor of safety against sliding assuming controlling conditions Fs = Ji{ [Ref 2, Eq. 19.6] Pi, F,t = Ca B + R tan 8 + PP [Ref. 2, Eq. 19.5] Assume adhesion is zero, passive earth pressure acts on the key, and the angle of wall friction is 20 degrees FR = Rmin tan 8 + P, 1 PP = 7E2 RP [Ref. 2, Eq. 11.15] Ski 35WROMUSLOOMM 071007 am. Cou jydbsloo Park OamSCilwlyimSlllrtdw?IlstPnnnpal Sp1OV1My Z%WMdUlmdp3l Spillway n 2chvall Eumal Slabililydac Ah, M E Paorecr No. 1051-06-205C SHEET No. 7 / 15 DATE September 11, 2007 I013NA1HE Shiloli Crossing -Morrisville COMPUTED BY K1414 suDJECT Shiloh-4 16 ft section - External Stability CHECKED BY TABLE 11: SLIDING Rmin Pp FR ph Fs Fs MIN Stability Ib/ft Ib/ft lblft Ib/ft , 54634 7574 24590 16267 1.5 1.5 OK 7. Check bearing capacity factor of safety assuming controlling conditions F8 = 911 q, qtr = cNc + yD f N,f + I yBN q,=BLI+B] R 6e qn = B?1- BJ B MR -Ado 2 R Find qD using bearing capacity factors in Reference 2, Table 12.1. TABLE 12: ULTIMATE BEARING CAPACITY N, Nq NY qu s ip f) 25.1 12.7 9.7 17443 [Ref. 2, Eq. 19.8b] [Ref. 2, Eq. 19.8c] [Ref. 2, Eq. 19.8a] Find controlling applied stress TABLE 13: CONTROLLING APPLIED STRESS Rmax Ib/ft a (ft) q, s qh sf Controlling Stress (psf) 54634 0.04 2990 2916 2990 Check factor of safety for bearing capacity TABLE 14: BEARING CAPACITY qu Controlling Stress Fs Fe MIN 1 Stability s (P (pgf) , 17443 2990 5.8 3 OK CONCLUSIONS: The retaining wall section should be constructed to the dimensions outlined in Table 1. [Ref. 2, Section 19.5] [Ref. 2, Eq. 12.6 & Table 12.1] s:113567RUlECTSUM171US6a17fiU7 Oman C.Wy-P.Wa Pnk UmalCdwlatiomdieudwdlMrineipd Spillway EnemdW,mdpil splAwoy Nadwdl Edm l staMldy.d. REFERENCES: 1. "Final Subsurface Exploration Report - Proposed Wal-Mart Supereenter #4250-00 and Sam's Club Store #6668.04," December 20, 2006, S&ME, Inc. 2. "Geotechnical Engineering: Principles and Practices of Soil Mechanics and Foundation Engineering." V.N.S. Murthy. 2003. S:11756WROJECTSL'.(KM)3564lTallyl Giv. Cow)-ftim Pork D=%CatculalimNiaduallWIrinciNI SPilheay FXICM3 PMCIPal SPdhray HOAW311 ENWMI SlabllOy_dOC don S&ME PROJECT No. 1051-06-205C WFETNO, 1 / 15 RATE September 11, 2007 JOUNAAIE Shiloh Crossing -Morrisville COMPUTEUuY KFIH SUBJECT Shiloh-5 14.5 ft section - External Stability CHECKED BY OBJECTIVE: Evaluate the external stability of the 14.5 ft exposed height section of Shiloh-5 assuming the retained soil is 1) washed stone and 2) drainage stone; 3) HW elev at top of exposed wall. SUMMARY: SUMMARY Overturning Slid in Bearing Capacity Minimum Calculated Minimum Calculated Minimum Calculated Stability Safety Safety Safety Safety Safety Safety Factor Factor Factor Factor Factor Factor 2 4.5 1.5 1.5 3 4.9 OK DEFINITION OF VARIABLES: ao = angle to outer friction plane a,, = angle from heel of retaining wall to the top of the stem P = angle of slope above retaining wall y = unit weight yb = buoyant iuut weight y,, = unit weight of water 6 = angle of wall friction + = soil friction angle A = width of stem B = base length of wall c = cohesion of bearing soil ?a = adhesion-factor - - C - length of heel ` D = width of heel/toe Dr = depth of bottom of footing e = eccentricity E = height of key F = length of toe Fn = factor of safety against bearing capacity failure Fo = factor of safety against overturning FR = sum of forces resisting sliding Fs = factor of safety against sliding G = horizontal component of slope of soil behind fill H = height of key H1 = depth to water table H-) = depth from water table to bottom of stem . ...... I width of key 5:1135N'ROIECTSL(gr 11355417aN)7 Ga W Cmiy-ftn. N& OalplCaleylyipgf'NinduallaVhmcipal 5ptil"2Y Ecl IalVhinupal SIN WAY HenJmall Gmwal subooF dog Amok W-M PROJECT NO. 1051-06-205C SIIEETNo. 2 115 Neow mE DATE September fl, , 2007 JOHNAME Shiloh Crossing- Morrisville coh,j,,j •EDuv KHFI suuJEcr Shiloh-5 14.5 ft section - External Stability CHECKED nt• KA = active earth pressure coefficient Kp = passive earth pressure coefficient Mo = stun of moments overturning MR = sum of moments resisting overturning Nr, Nn, Ny = bearing capacity factors P. = active earth pressure Pi, = horizontal component of active earth pressure Pp = passive earth pressure P, = vertical component of active earth pressure q = surcharge qi, = pressure at heel of footing qt = pressure at toe of footing %, = ultimate bearing capacity R = sum of vertical forces KNOWN VARIABLES: P = tan-'(1/3) = 18° [Ref. 3] ysoil= NA [Ref. 1] ystone = 130 pcf [Ref, 1] ywEler = 62.4 pcf 6 = 17.3 degrees [assluned] ? so;i = NA [Ref. 1 ] stone = 36° [Ref 1] C = 0 psf [assumed] Fa,M,N = 3.0 [Ref. 2, Section 19.5] Fo,m,N = 2.0 [Ref, 2, Section 19.5] FR = sutil of, forces resisting sliding Fs,m,N = 1.5 [Ref. 2, Section 19.5] q =250 psf [assumed] SAI 3S61Plt0)FCT51J)D7M 376.07017 Gum CwHyPDODD Part DDmICa1cWx00aa111ex1wuH0rincipa0 Spffi-y E11=WThatipal Spilhvay HrWw91 Eme mal SUhllby JDe PROJECT NO. 1051-06-205C may= Iwo SHEET No. 3 115 oA•rE September 11, 2007 JOONAME Shiloh Crossing -Morrisville cOn,1.uTEn11r KHH smjEcT Shiloh-5 14.5 ft section - External Stability CHECKED nY CALCULATIONS: 1. Estimate lieadwall geometry for stability analysis c -OW P1. 0 E 8 TABLE 1: HEADWALL DIMENSIONS A ft B ft C ft D ft E ft F ft G ft H ft I ft 2.5 14.5 10 2 5 2 2.5 17.5 2.5 2. Check applicability of Rankine's Equation Rankine's equation applies if the outer failure plane does not intersect the retaining wall. _ 90-0-e-,8 a° - 2 2 sin P sin.- _ sin 0 [Ref. 2, Eq. 19.1 b] [Ref. 2, Eq. 19.2] 5:1133r,PROJECTSL110TI33l-(17.007 Gahm cmlv-ponm Pat P.mICaloolallo 41.d-Wynndpil Spillway E,i-J .dpal Sp,U-y Iiead-11 E,1w 1 Suhila),4m & SME PROJECT NO. 105 I -06-2050 sneer No. 4/15 DATE September 11, 2007 JORNAME Shiloh Crossing - Morrisville COMPU'rEDRV KHH suD,Fm. Shiloh-5 14.5 R section - External Stability CHECKED DT aw =tan-'??J TABLE 2: RANKI NE'S EQUATION A PPLICABILITY 13 a a° 0H, Rankine Equation Applicability (degrees) (degrees) (degrees) (degrees) 40.0 18.00 28.73 19.63 29.7 Rankine Equation is Applicable 3. Calculate Rankine active earth pressure for saturated and submerged conditions for 1) embankment fill material and 2) drainage stone P. = qHK .! + 1 yH; K;, + yH, H2 K;, + I H; (yh K., + y,, } [Ref. 2, Eq. 11.19] z z K,, = cos Q Cos ,6 - cos 7 ?3 -cis' (for soil retained by wall) cos,8 + COS- - COS- KP = 1 + sin o (for soil in front of toe) 1-sino Ph = Pu cos ,6 P,, = P. sin,6 1 PIrater = ywafcrH2 [Ref 2, Eq. 11.24] [Ref. 2, Eq. 11.15a] [Ref. 2, Section 19.5] [Ref. 2, Section 19.5] TABLE 3 : RANK INE AC TIVE EA RTH PRESSURE Material Condition R? feet Fl2 feet (psi) 1?R Kp P P6 Iblft P r lblft P, Iblft Soil Saturated 0 17.5 250 0.243 4.599 13137 12494 4060 Soil Submer ed 0 17.5 250 0.243 4.599 13137 12494 4060 Stone Saturated 0 17.5 250 0.243 4.599 13137 12494 4060 Stone Submerged 0 17.5 250 0.243 4.599 13137 12494 4060 The horizontal component of active earth pressure is the driving force and adds to instability. Tile largest horizontal force is the controlling driving force. In this case, the controlling condition is submerged soil. TABLE 4: CONTROLLING DRIVING FORCE Material Condition Ph Ib/ft Controlling Ph iblft Soil Saturated 12494 Soil Submer ed 12494 12494 Stone ._......_..__. ............. Saturated .............. ...........9.249. Stone Submerged 12494 S:11J3n1pR0JECT5vUIIT}]SfFtgdgi G.H. Cauq•Poaan Pat DamlCalcula M-Uk.4o- lltW.cJpal Spillway EMMditpdPal Spillway He d-U N-1 StAllil,,dx *.,S&ME ,onNAAjF Shiloh Crossing- Morrisville sung, Shiloh-5 14.5 ft section - External Stability PROJECT NO. 1051-06-205C snEET No. 5115 DATE September 11, 2007 COMPUTED nY KHH CHECKED UY 4. Calculate resisting forces and moments acting on the retaining wall about point 0 for saturated and submerged conditions for 1) embankment fill material and 2) drainage stone, ignore the effects of the key TABLE 5: SATURATED FORCES AND MOMEN TS - SOIL Section Area ftZ y c Weight Ib/ft Lever Arm (ft) Moment (ft-lb/ft) Stem 38.75 150 5813 3.25 18891 Footing 29 150 4350 7.25 31538 Retained Soil 155 130 20150 9.5 191425 Retained Soil sloe 20.00 130 2600 11.17 29033 Water - - - - - Vertical Rankine Pressure 4060 14.5 58865 R = 36972 Mr= 329751 TABLE 6: SUBMERGED FORCES AND MOMENTS - SOIL Section Area ftZ y cf) Weight (Ib/ft) Lever Arm (ft) Moment (ft-lb/ft Stem 38.75 150 5813 3.25 18891 Footing 29 150 4350 7.25 31538 Retained Soil 155 67.6 10478 9.5 99541 Retained Soil sloe 20.00 130 2600 11.17 29033 Water 155 62.4 9672 9.5 91884 Vertical Rankine Pressure 4060 14.5 58865 R = 36972 Mr = 329751 TABLE 7: SATURATED FORCES AND MOMENTS - STONE Section - Area 17 y (Rcn Weight (l}?/.Ft) Lever Arm (ft} Moment (f"lEatft) - Stem -38:75 1-50- 581.3 125 - 18891- Footing 29 150 4350 7.25 31538 Retained Soil 155 130 20150 9.5 191425 Retained Soil sloe 20.00 130 2600 11.17 29033 Water - - - - - Vertical Rankine Pressure 4060 14.5 58865 R = 36972 Mr = 329751 S.%I 35WROJECTSCdo7ll 356-M-0D7 Oaaloa Cmly-Pmtm Pat D= Calwdada Wim&aAalPrmdpal Sptllwy E%x WT iudjW Spil-y H.dtcall fldwnal Sutably.dx Ad'k &ME AT, PROJECT NO, 1051-06-205C 511ErrNo. 6/ 15 DATE September 11, 2007 JOD NAAIF. Shiloh Crossing - Morrisville CohuvrED BY ECHH SUBJECT Shiloh-5 14.5 ft section -External Stability CHECKED BY TABLE 8: SU BMERGED FORCES AND MOMENTS - STONE Section Area ftz y (cf) Weight (lb/ft) Lever Arm (ft) Moment ft-Ib/ft) Stem 38.75 150 5813 3.25 18891 Footing 29 150 4350 7.25 31538 Retained Soil 155 67.6 10478 9.5 99541 Retained Soil sloe 20.00 130 2600 11.17 29033 Water 155 62.4 9672 9.5 91884 Vertical Rankine Pressure 4060 14.5 58865 R = 36972 M,= 329751 The lowest resisting force and moment control. In this case, the controlling condition is submerged stone. TABLE 9: CONTRO LLING RESISTING FORCE ! MOM ENT Material Condition R (lb/ft MR (lb-ft/ft Rmin lb/ft MR,min (lb-ft/ft Soil Saturated 36972 329751 Soil Submerged 36972 329751 Stone Saturated 36972 329751 36972 329751 Stone Submerged 36972 329751 5. Check factor of safety against overturning assuming controlling conditions ?IH,min Fo = Mo Alto = P11 3 [Ref. 2, Eq. 19.7a] [Ref. 2, Eq. 19.7b] t-ABLE,1.0 CI ECK OVEPT-URN ING MR min lb ft/fQ Mo (lb ft/ft F0 FO,MIN Stability 329751 72883 4.5 2.0 OK 6. Checlt factor of safety against sliding assuming controlling conditions Fs = Fx [Ref. 2, Eq. 19.6] Pit Flt =c,, B+RtanS+P,, [Ref. 2, Eq. 19.5] Assume adhesion is zero, passive earth pressure acts on the key, and the angle of wall friction is 20 degrees Fli = RmiD tan S + PP 1 yE , _, KP [Ref. 2, Eq. 11.15] S:kll'6% An1ECTS1:liD7\1]SW17un 6an00 Cmi),PPQ n PUL [timlCalculHiousUiwdx?IlrlPrindpal SAMYFMCMA-,undpai SpWway Bexiuail E d=A SUbiiby d. S&ME PROJECT NO. 1051-06-205C SHEET Na. 7/15 DATE September 11, 2007 JOR NAME Shiloh Crossing- Morrisville commrED BY KHH OBJECT Shiloh-5 14.5 ft section - External Stability CHECKED BY TABLE 11: SLIDING Rmin PP FR Ph Fs Fs MiN Stability Ib/ft Ib/ft Ib/ft Ib/ft , 36972 7473 18989 12494 1.5 1.5 OK 7. Check bearing capacity factor of safety assuming controlling conditions F11 = q1, qt q„ = cN, + yD f N,1 + I yBNY q. =BL1+ BI qrf = BI 1- BJ _ B EMIR -Alo e 2 R Find q„ using bearing capacity factors in Reference 2, Table 12.1. TABLE 12: ULTIMATE BEARING CAPACITY Nr Ny NY qu sf 25.1 12.7 9.7 14095 [Ref. 2, Eq. 19.8b] [Ref. 2, Eq. 19.8c] [Ref. 2, Eq. 19.8x] Find controlling applied stress TABLE 13: CONTROLLING APPLIED STRESS Rmax lb/ft a (ft) qt s qh s Controlling Stress psf) 36972 0.30 2869 2231 2869 Check factor of safety for bearing capacity TABLE 14: BEARING CAPACITY q„ Controlling Stress Fe FH M,N Stability s (sf) , 14095 2869 4.9 3 OK CONCLUSIONS: The retaining wall section should be constructed to the dimensions outlined in Table 1. [Ref. 2, Section 19.5] [Ref. 2, Eq. 12.6 & Table 12.1 ] SiU5GWNGIECTSL'tNI7%ll5"l4XY7 Gat- C-my.Pastm Yxk LhmlCalculau-?Vie>thvallaV'tutsipal 5p1110ay Ermmalkhm"Pal 5p141, a) Had" an E%Jmw 6aMldr da S&ME 111w PROJEcr NO, 1051-06-205C sn=NO. 8/ 15 o,,TE September 11, 2007 Ioa NA+IE Shiloh Crossing- Morrisville COMPUTED as, KHH suaaEcr Shiloh-5 14.5 ft section - External Stability CucCKU11V REFERENCES: 1. "Final Subsurface Exploration Report - Proposed Wal-Mart Supercenter #4250-00 and Sam's Club Store #6668-04," December 20, 2006, S&ME, Inc. 2. "Geotechnical Engineering: Principles and Practices of Soil Mechanics and Foundation Engineering.'' V.N.S. Murthy. 2003. Gaston Cawy-Postm Pak OamlCmedaliond}kadmltaNnodpnl 5pillany SrlemallPrineipal spilwy Iia"An Ed=UA subilbr.doe O'o£ 9'6Z Z'6Z 8'8Z £'8Z s Q. T bo O L O N 3 O 3 O s N L? m GJ N 61Z S'LZ T'LZ L'9Z £'9Z 8'SZ b'SZ R 0'SZ 3 9'bZ c Z'bZ 3 8'£Z £'£Z 6'ZZ c S'ZZ m T'ZZ u N L'TZ £'TZ 8'0Z b'OZ 0'OZ 9'6T Z'6T 8'8T £'8T 6'LT SIT `w TIT L'9T 3 £'9T o 8' S T b'ST c s 0'ST r d 9171 E m ZTT r 8'£T £'£T 6'ZT S'ZT T'ZT L'TT £'TT 8'OT b'OT 0'OT 9'6 Z'6 8,8 £'8 6'L n S'L a T'L ,° L'9 t £'9 3 c 8'S O'S u 9'17 Z'b 8'£ FE 6' Z S' Z T'Z CT E' T 8'0 17'0 0,0 (43) SLO-1SOd aPoN le a2je4:)s14 molllnO U C SNOISIA321 31V0 ON OOOPELZ (&0 :131 VNIl021V0 H1MON < < 3 O Oi m ? vi ° (D 0990-9LLZL SVSNV)4dV '3llV\NO1N39 A1N(1003NVM'3llIASI21210W 3 3 Q CN O (O d S Lv Z 1332115 H1 0L 3S 100Z 1i1l100 53121f1S (INV 4S AMH ON t` al j O O j 1(3ldWOOlN3WdOl3h3ONO0VMWVS N`dld 311S -nV213AO W ? 00-09Z4 N 32iOlS ?, •n ns • ° ? Y ? d 1,21%fVMVM aiv iaaow J.HV"VM x YS S N31? d w 1 f ?n o y?y Z _ nI ?C N$'C I ?O`OgLLa ?F I LL ? ? N W 0 ?o QW? W W LL 2 I I VF? qg r. d --,f 1. -- - owz 're Wv El O s.nw?s uaw\«..e..y noM•aw..d\ww •iaw.•w eco\?wolnrrv\wu.>ts wn-aw uww\nam--?u?\:v I IF I f --------------? ObO }/ 00 ? ?L ) i' G:3sa? ' o00cm cm ooC=C=)00o U 7 LL Z 0000 C o moo - ------------- '"c `? al o o o N)F O o \ I I ,, ; 1 \ \ \\ rte' \ \ I =. 1 1 11 1 \\ \\ I \ 1 1 \ X \ 1 I I \ \ I? N W_ WA ?D?E I?R North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Governor colleen H. Sullins Director March 12, 2010 CERTIFIED MAIL #7009 0080 0000 9764 8075 RETURN RECEIPT REOUESTED Wal-Mart Stores East, LP Attn: Mr. Fred Lutz Sam Walton Development Complex 2001 SE 10'h Street Bentonville, AR 72716-4050 Dee Freeman Secretary CERTIFIED MAIL #7009 0080 0000 9764 8082 RETURN RECEIPT REOUESTED Shiloh Morrisville LLC c/o USAA Real Estate Company Attn: Mr. Phillip R. Moltz 9830 Colonnade Blvd Suite 600 San Antonio, TX 78230 Subject: NOTICE OF VIOLATION NOV-2010-WQ-0012 DWQ #04-1764 Shiloh Crossing Shopping Center 401 Water Quality Certification Violations 35.8656° N 78.8445°W Wake County and Durham County Dear Messrs. Lutz and Moltz: On February 26 and March 1, 2010, Natalie Landry from the Raleigh Regional Office of the Division of Water Quality (DWQ) conducted a site inspection for the tract/project known as the Shiloh Crossing Shopping Center, on NC54 in Morrisville, in both Wake and Durham Counties North Carolina. The stream on the site is an unnamed tributary to Stirrup Iron Creek, Class C, Nutrient Sensitive Waters (NSW), in the Neuse River Basin. Accordingly, the following observations were noted during the DWQ file review and site inspection. Mr. Todd St. John of Kimley-Horn and Associates, Inc. submitted a Pre-Construction Notification (PCN) on or about May 14, 2007 on behalf of the owner/applicant, MBV Investors, LLC. The impacts were requested under U.S. Army Corps of Engineers Nationwide Permit 29 and the corresponding General Water Quality Certification. DWQ issued an approval for the impacts on July 6, 2007, DWQ Project# 04- 1764, Ver. 2. Mr. Craig M. Duerr of Kimley-Hom and Associates, Inc. submitted a Pre-Construction Notification (PCN) on or about November 21, 2007 on behalf of the owner/applicant, MBV Investors, LLC requesting a modification of the existing 401 Water Quality Certification (DWQ Project #04-1764, Ver. 2). The impacts were requested under U.S. Army Corps of Engineers Nationwide Permit 39 and the corresponding General Water Quality Certification. DWQ issued an approval for the impacts on December 17, 2007, DWQ Project# 04-1764, Ver. 3. The approved impacts at the Shiloh Crossing Shopping Center site include the placement of fill within or otherwise impact 0.479 acres of 404/wetland and 274 linear feet of perennial stream, 18,533 square feet of Zone I protected Neuse River basin riparian buffers, and 19,912 square feet of Zone 2 protected Neuse River basin riparian buffer to construct a commercial development. Alr/1/Y North Carolina Division of Water Quality Raleph Regional Office Surface Water Protection Phone (919) 791-4200 Customer service Internet -- rK,waterquatity.org 1828 Mail Service Center Raleigh. NC 27899.1828 FAX (919) 788-7159 877.8238748 An Equal Opportunity0AM"native Action Employer - 50% Recycled/10% Post Consumer Paper Shiloh Crossing Shopping Center M 1'd;'201,M1 Page2 The site inspection was conducted to compare the existing conditions with the authorized impacts approved by DWQ through the 401 Water Quality Certification and Authorization Certificate per the Neuse River Buffer Protection Rules with Additional Conditions. The bolded text represents the DWQ approved impacts and the un-bolded text represents site observations by DWQ staff. Wetland Impact 1: The proposed impacts to Wetland I are due to grading and fill associated with construction of the Wal-Mart parking lot. Impacts will occur In Phase 1 and include the entire 0.019 acres of Wetland I 1 as shown on Figure 7. Mitigation will be required. Development has impacted entire wetland footprint. No additional field observations. Wetland Impact 2: The proposed impacts to Wetland 2 are due to grading and fill associated with construction of Shiloh Glenn Drive. Impacts will occur in Phase I and include the entire 0.108 acres of Wetland 2 as shown on Figure 7. Mitigation will be required. Development has impacted entire wetland footprint. No additional field observations. Wetland Impact 3A: The proposed impacts to Wetland 3A are due to grading and fill associated with the construction of Shiloh Glenn Drive. Impacts will occur in Phase 1 and include 0.073 acres of the northwestern portion of Wetland 3 as shown on Figure 8. Mitigation will be required. Wetland Impacts 3A are completed. At Wetland Impact 3A, vegetation is sparse under matting on the slope and rills are forming on top of the slope. Wetland Impact 311: The proposed impacts to Wetland 311 are due to grading and fill associated with the construction of Shiloh Glenn Drive. Impacts will occur in Phase 1 and include 0.040 acres of the northwestern portion of Wetland 3 as shown on Figure 8. Mitigation will be required. Wetland Impacts 3B are completed. No additional field observations Wetland Impact 3C: The proposed impacts to Wetland 3C are due to grading and fill associated with construction of a private roadway connection from Shiloh Glenn Drive to Lower Shiloh Way. Impacts will occur in Phase 2 and include 0.166 acres in the middle of Wetland 3 and 758 square feet of Zone 2 riparian buffer as shown on Figure & Mitigation will only be required for the wetland impact. Wetland Impact 3C is not yet impacted (part of Phase 2). Linear Wetland Impact 4: The proposed Impacts to Wetland 4 are due to grading and fill associated with the construction of Lower Shiloh Way and future development of 2 outparcels (Lots 2 and 6). Flow from Wetland 5 to Wetland 3 will be maintained with a stormwater by-pass for ofd site run-off. Impacts will occur in Phase 2 and include the entire 0.039 acres of Wetland 4 as shown in Figure 9. Mitigation will be required. Wetland Impact 4 is not yet impacted (part of Phase 2) Shiloh Crossing Shopping Center ;March 12, 2010 Page 3 Wetland Impact 5: The proposed Impacts to Wetland 5 are due to grading and fill associated with the widening of NC 54. Impacts will occur in Phase 1 and Include the 0.004 acres of Wetland 5 as shown on Figure 9. Mitigation will be required. Wetland Impact 5 was not inspected. Wetland Impact 6: The main portion of Wetland 6 will not be impacted, however minor impacts are proposed to grading and fill associated with the construction of Lower Shiloh Way, development of Lot 9, and relocation of the existing Progress Energy overhead transmission line. Flow from the ofd site NCDOT drainage will be maintained with a culvert. Impacts will occur in Phase 2 and Include 0.029 acres of the linear wetland portion of Wetland 6 as shown on Figure 10. Mitigation will be required. Wetland Impact 6 is not yet impacted (part of Phase 2). Stream Impact 1: The proposed impacts to Stream 1 are due to grading and fill associated with construction of Shiloh Glenn Drive and a 36-inch diameter culvert In the channel with two 24" diameter culverts above the channel for flood conditions. Impacts will occur in Phase 1 and include 127 linear feet of stream impact, 9,538 square feet of Zone 1 riparian impacts, 7,988 square feet of Zone 2 riparian impacts as shown on Figure 11. Mitigation will be required for the stream and buffer impacts exceeding 150 linear feet. Pipe length measured approximately 105 LF (original stream meandered). Only one culvert was observed and it was submerged on the downstream end and clogged with debris and sediment on the upstream end. Diameter measurement could not be taken. On the downstream side, rills were observed in the slope in Zone 2 near end of the retaining wall. On the upstream side, erosion was observed above the retaining wall on the fill slope. Sediment deposition and debris is clogging the culvert pipe and is built up in the stream for -40 LF. Non-diffuse flow is entering buffer from a grassed ditch and a small temporary sediment trap. Rills were formed in Zones 1 and 2. Stream Impact 2: The proposed Impacts to Stream 2 and riparian buffers are due to grading and flH associated with connection of Shiloh Glenn Drive to the existing NCDOT Service Road and two 9-foot x 10-foot box culverts In the channel. Two similarly sized box culverts exist 100-feet to the southeast under I-540. Impacts will occur in Phase I and include 147 linear feet of stream, 8,552 square feet of Zone 1, and 5,233 square feet of Zone 2 as shown on Figure 12. Mitigation wiU only be required for the stream impact. It appears that the drainage network was installed differently than the approved design (PCN Figure 12). The flow splitter which divides the stormwater to either the level spreader or the bypass was originally shown on the southeast side of NCDOT Service Road and it appears to have been installed on the northwest side. The by-pass flow is discharging into Zone 2 (originally designed to discharge onto a dissipater in Zone 1 on the other side of the road) and is resulting in non-diffuse flow through the entire buffer. Buffer Impacts: The proposed impacts to Zone 1 and Zone 2 riparian buffers are due to grading and fill associated with construction of stormwater outlet pipes from the Extended Detention Wetland A, level spreaders (LS-1 and LS-3) for diffuse flow from Shiloh Glenn Drive, and access to the CP&L transmission line structures. Impacts will occur in Phase I and include a total of 1,792 Shiloh Crossing Shopping Center March 12, 2010 Page 4 square feet of Zone 1 riparian impacts and 7,320 square feet of Zone 2 riparian impacts as shown on Figures 13 and 14. Mitigation will not be required. Stream Buffer Impact #l, which was authorized as a 427 sq ft Zone 2 and 7 sq ft Zone 1 impact, is associated with the installation of stormwater drainage outlet and level spreader 1 (LS-1). There is concentrated flow through Zones l and 2 below and beside the -15 LF dissipater pad and unstable stream banks were observed as a result of concentrated flow through rills in the buffer. Stream Buffer impact #2, which was authorized as a 1,192 sq ft Zone 2 and 1,064 sq ft Zone 1 impact, is associated with the installation of the Extended Detention Wetland A outlet. Approved plans show the dissipater extending to the stream but field observations show that the dissipater does not extend to the stream and rills have formed in Zone 1 and in the stream bank. Flow is short-circuiting the pad and channeling through Zone 1. Soil is eroding around the wing walls of the outlet structure in Zone 1. Stream Buffer Impact #3 appears to be installed as designed. Stormwater: Construction will occur In phases with initial stormwater controls for Phase l limited to Extended Detention Wetland A for Lots 1, 13 and 14 and four level spreaders for Shiloh Glenn Drive. Stormwater controls will be constructed later for future Phase 2 development of Lots 2 through 10 including Extended Detention Wetlands B and C and for future Phase 3 development of Lot 12 including Extended Detention Wetlands D and E. Phase 1: The final stormwater management facilities for Phase 1 (that includes Lot 1, Wal-Mart, Sam's Club, and Shiloh Glenn Drive) shall be constructed according to the approved Stormwater management plans received on May 15, 2007. The Stormwater drainage Infrastructure and treatment facilities shall be constructed and operational prior to occupying any of the above buildings. Extended Detention Wetland A: Permanent pool elevation 345 ft., Temporary pool elevation 355.68 ft., Permanent pool surface area 72,519 sq. ft., Forebay surface area 42,099 sq. ft, Marsh 0-9" surface area 27,945 sq. ft., Marsh 9-18" surface area 26,008 sq. ft., Micro Pool Surface area 11,500 sq. ft. and diameter of orifice 4.0 Inches. Large areas of side slopes inside Extended Detention Wetland A lack good vegetative cover and the slopes are very steep (steeper than the 2.5H: I V shown on the approved plan in some areas per the Cut/Fill Design Criteria). The outlet valve is in the open position and Wetland A is drained below the outlet invert. Some wetland plants were present in Wetland A but not to the extent shown in the approved plan (need to request final planting details). The soil in Wetland A has large sticks and debris and it appears the soil was not conditioned to ensure the survival of wetland plants per the Wetlands Grading & Planting Notes on the approved plan. The protective matting of the emergency spillway is not installed properly; the soil underneath has sticks and debris and the fabric undulates instead of laying flat. A fence is installed across the concrete spillway, leaving a clear opening of approximately 6 inches high. The dissipater pad at the discharge pipe is in disrepair. Extended Detention Wetland B: Permanent pool elevation 356 ft., Temporary pool elevation 357.49 ft,, Permanent pool surface area 10,038 sq. ft., Forebay surface area TBD sq. ft, Marsh 0-9" surface area TBD sq. ft., Marsh 9-18" surface area TBD sq. ft., Micro Pool Surface area TBD sq. ft. and diameter of orifice 2.0 inches. This stormwater device is still a temporary skimmer basin. Wake County Sediment & Erosion Control still maintains an active E&SC permit for this measure. Shiloh Crossing Shopping Center March 12, 2010 Page 5 Extended Detention Wetlands C and D: Not yet constructed. Extended Detention Wetland E: Permanent pool elevation 325 ft., Temporary pool elevation 325.76 ft., Permanent pool surface area 19,523 sq. ft., Forebay surface area TBD sq. ft, Marsh 0-9" surface area TBD sq. ft., Marsh 9-18" surface area TBD sq. ft., Micro Pool Surface area TBD sq. ft. and diameter of orifice 3.0 Inches. This stormwater device is still a temporary skimmer basin. It is not covered under DLR or a DLR delegated-Local Program permit according to the records available to DWQ. The outlet discharges into the protected riparian buffer in a non-diffuse manner. Level Spreader 1 (LS-1): Length 43 ft., Maximum Filter Strip/Buffer Slope: 4.0%, Maximum Discharge from 1"/Hr Strom: 3,18 cfs, Maximum Discharge to Level Spreader: 3.28 cfs, Filter Strip/Zone 1 Buffer Vegetation: Forested, Filter Strip/Zone 1 Buffer Width: 50 ft., Filter Strip/Zone 2 Buffer Vegetation: Grass, Filter Strip/Zone 2 Buffer Width: 55 ft. Field measurement of level spreader length shows LS-I is --45 LF. The lower part of grass filter strip is covered with sediment deposition from a washout on the side of the level spreader (sediment must be removed from buffer and buffer re-seeded). In addition, erosional gullies were observed in upper part of grass filter strip. Non-diffuse flow observed below and beside bypass outlet dissipater pad (-15'L) in Zones i and 2. Rills are formed in the buffer and a gully was observed in the stream bank. Trash was observed. Level Spreader 2 (LS-2): Length 77 ft., Maximum Filter Strip/Buffer Slope: 7.4%, Maximum Discharge from 1"/Hr Strom: 1.15 cfs, Maximum Discharge to Level Spreader: 1.19 cfs, Filter Strip/Zone 1 Buffer Vegetation: Forested, Filter Strip/Zone 1 Buffer Width: 50 ft., Filter Strip/Zone 2 Buffer Vegetation: Grass, Filter Strip/Zone 2 Buffer Width: 20 ft. Field measurement of level spreader length shows LS-2 is -85 LF. Filter strip/Zone 1 buffer is now maintained for a power line easement. Sediment was observed along the level spreader. There are very steep slopes above the level spreader and the vegetative cover is sparse. The matting does not lie flat. The slope is eroding on the right end (looking at the front of the level spreader) and rills are present. Rills were observed under the matting of the filter strip, undermining it. Trash was observed. Level Spreader 3 (LS-3): Length 59 ft., Maximum Filter Strip/Buffer Slope: 6.7%, Maximum Discharge from 1"/Hr Strom: 1.31 cfs, Maximum Discharge to Level Spreader: 1.33 cfs, Filter Strip/Zone 1 Buffer Vegetation: Forested, Filter Strip/Zone 1 Buffer Width: 30 ft., Filter Strip/Zone 2 Buffer Vegetation: Grass, Filter Strip/Zone 2 Buffer Width: 20 ft. Field measurement of level spreader length shows LS-3 is -65 LF. Concentrated flow was observed in the grass filter strip. Rill present. Level spreader may not be level. Vegetation on slope above the forebay is sparse and small shrubs need to be removed. Level Spreader 4 (LS-4): Length 42 ft., Maximum Filter Strip/Buffer Slope: 1.4%, Maximum Discharge from I"/Hr Strom: 0.61 cfs, Maximum Discharge to Level Spreader: 0.64 cfs, Filter Shiloh Crossing Shopping Center March 12, 2010 Page 6 Strip/Zone I Buffer Vegetation: Forested, Filter Strip/Zone I Buffer Width: 30 ft., Filter Strip/Zone 2 Buffer Vegetation: Forested, Filter Strip/Zone 2 Buffer Width: 20 ft. Field measurement of level spreader length shows LS4 is -45 LF. The discharge to the level spreader appears to be greater than the maximum allowed discharge. Trees removed from filter strip/Zone t and filter strip/Zone 2. Concentrated flow through the filter strip is resulting in eroded soils in filter strip/Zone 1 and filter strip/Zone 2. Leaf buildup observed in level spreader. As a result of the site inspection and file review, the following violation, described below, is noted: 401 WOC Condition Violation The approval of the 401 Water Quality Certification and Authorization Certificate per the Neuse Buffer Protection Rules with Additional Conditions letter specifies that the activities must follow the conditions listed in the General Water Quality Certification, as well as additional conditions listed in the letter. General Water Quality Certification #04-1764, Ver. 3, Additional Condition 1 states the following: "Impacts Approved. The following impacts are hereby approved as long as all of the other specific and general conditions of the Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts:" Type of Impact Amount Approved (Units) Plan Location or Reference 404/Wetland 0.479 acres PCN page 10 of 17 Stream - perennial 274 linear feet) PCN page 10 of 17 Buffer - Zone 1 18,533 (square ft. PCN page 14 of 17 Buffer - Zone 2 19,912 (square ft. PCN page 14 of 17 General Water Quality Certification #04-1764, Ver. 3, Additional Condition 3 states the following: "Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards; (Please refer to DWQ Approval Letter dated December 17, 2007 - Attachment A for details of this Additional Condition.)" General Water Quality Certification #04-1764, Ver. 3, Additional Condition 5 states the following: "Culvert Installation. (Please refer to DWQ Approval Letter dated December 17, 2007 - Attachment A for details of this Additional Condition.)" General Water Quality Certification #04-1764, Ver. 3, Additional Condition 7 states the following: "Written Stormwater Management Plan (Final Plan Needed) Required for Each Phase. (Please refer to DWQ Approval Letter dated December 17, 2007 - Attachment A for details of this Additional Condition.)" Requested Response You are directed to respond to this letter in writing to DWQ at the address provided below within 30 days of receipt. Shiloh Crossing Shopping Center March 12, 2010 Page 7 1. Please provide documentation (including a detailed site map/survey) depicting all jurisdictional water features (e.g. streams, wetlands and buffers) on the site. This documentation should describe and quantify the impacts to those jurisdictional features and should include plans to avoid further unauthorized stream, buffer and wetland impacts on the site. 2. Please provide documentation showing erosion and sediment control practices in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices. Existing stream dimensions must be maintained above and below locations of each culvert. Provide documentation showing that Stream Impact #1 culvert has been installed in such a manner that the original stream profiles are not altered above and below the culvert. a. Show that the culvert has not and will not cause aggradation or erosion of the stream up or down stream of the culvert. b. Show that the culvert provides for continuity of water movement and can adequately accommodate high water or flood conditions. 4. Provide documentation showing the as-built condition of the stormwater drainage system at Stream Impact #2 and provide documentation of appropriate buffer authorizations for existing impacts. 5. Provide a Plan that addresses non-diffuse flow in the Neuse Riparian Buffer Zones 1 and 2 for the entire site. 6. Provide documentation that shows the final stotmwater management facilities for Phase 1 were constructed in accordance with the approved stormwater management plans received on May 15, 2007. Include in this documentation an As-Built for Wetland A, the wetland plantings and associated soil conditioning for Wetland A, and verification from the engineer that the fence on the spillway will not impede water flow or unduly block debris resulting in impeded water flow during a large rain event. 7. Provide NPDES rainfall and BMP monitoring records for the temporary skimmer basin (Extended Detention Pond B) that is covered under the Division of Land Resources-Delegated Local Program Wake County Erosion and Sedimentation Control Permit program. 8. Remove the temporary skimmer basin (Extended Detention Wetland E) or convert to an extended detention wetland. 9. Provide documentation showing the level spreaders were constructed and installed as designed. Submit a Plan that addresses the Operation and Maintenance problems at all level spreaders, including a timeline. Submit Reauested Items To: Natalie Landry DWQ Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 Shiloh Crossing Shopping Center March 12, 2010 Page 8 Thank you for your attention to this matter. This office requires that the violations, as described above, be property resolved. These violations and any future violations are subject to a civil penalty assessment of up to $25,000.00 per day for each violation. Should you have any questions regarding these matters, contact Natalie Landry at (919) 7914200. Sincere y, , Danny $ Region Supervisor Surface Water Protection Section Attachment cc: John Hennessy, NPS Assistance and Compliance Oversight Unit Ian McMillan, 401 Wetlands Permitting Unit, 1650 MSC, Raleigh, NC 27604 USACE Raleigh Regulatory Field Office Jennifer Mitchell, Wake County Water Quality Div., 336 Fayetteville Street, Raleigh, NC 27602 Chris Roberts, Durham County, 120 E. Parrish St., 1' Floor, Durham, NC 27701 Keith Billy, Town of Morrisville, 260 Town Hall Dr., Suite B, Morrisville, NC 27560 Austin Watts, Kimley-Horn, PO Box 33068, Raleigh, NC 27636-3068 Todd St. John, Kinley-Horn, PO Box 33068, Raleigh, NC 27636-3068 Kevin Martin, S&EC, 11010 Raven Ridge Road, Raleigh, NC 27614 Bradley Bowling, Priest, Craven & Assoc., 3803B Computer Dr., Raleigh, NC 27609 Registered Agent, CT Corporation System, Box 1011, Raleigh, NC 27601 • ? OFwArF ??aahm?f ?4 O1 9o Michael F. Easley, Governor r- William G. Ross Jr., Seeanry North Carolina Department of Envimanmat and Natural Rmources O ? Coker H. Sullins, Director Division of Water Quality December 17, 2007 DWQ Project # 04-1764, Ver. 3 Wake/Durhem County Mr. Karl Blackley MBV Investors, LLC 100 Weston Estates Parkway Cary, NC 27513 Subject Property: S Crossing UT to Stirrup Iron Creek [030402, 27-33-4-2, C. NSW] Approval of 401 Water Quality Certification mW Authorization Certificate per the Neese River Bafhr Protection Robs (13A NCAC 211 .0233) with Additional Condition - MODIFICATION Dear Mr. Blackey: You have our approval, in accordance with the attached conditions and those listed below, to place fill within OJ Otherwise impact 0.479 acres of 444wetland and 2741inesr feet of square feet of zone 1 protected Now River basin rtparisn butlers, and 19 912 sum' 18,533 Protected Now River basin riparian buffers to construct the feet of Zone 2 described in your revised application dated November 19, 2007. and cia! the eve Division of sion of as Quality (DWQ) on November 21, 2007. After review' our r Water impacts are covered by t3eheral Water ? Yapplication, we have decided that the Quality Certification Number(s) 370S (OC3705). The Certification(s) allows you to use Nationwide Permit(s) NW39 when issued Engineers (USACE). 711h letter shall also act as your by the US Army Carps s the protected riparian buffers approved Auk Certificate for impacts to per 15A NCAC 2B .0233. In addition, you should obtain or otherwise comply with any Other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Now4ischar regulations. approval to proceed with your proud las"ets or to conduct im ge a eted this your application d" expire upon expiration of the 404 or CAMA per tass as depicted in This approval is for the purpose and design that you described in your application. If Pr4)eCt. You must notify us and you may be you change your the new owner must be 8harem a required to sand us a new application. If the property is sold, complying with all t copy of this Certification and approval letter and is thereby responsible for conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 1 SA NCAC 2H.0506 (h). This approvsi requhw you to follow the conditions Hated in the attached certification and any additional coudlttona Bated below. The Additional Conditions of the Certification are: 1- Impacts Approved The following impacts are hereby approved as long as all of the other $ conditions of this Certification (or Isolated Wedand pacific and general approved including incidental impacts: Permit)' No other impacts are col OversighMEWm vice Ce Revta s urn 1630 Mail Mali Service Cater, Rakish, Norrb Carotira 27699-1630 2321 Cral0a Boukvwt Sans 230, Rakigk Dkrdt {:aroliea 27601 Phase: 919-733.1796 / FAX 919-73341931 Internet: hag-1/hIn -r go ac -04TjSWW An E01 ft"WellylA[Ihrratiw Aatiou Employsr- 30%RwyolWlo%Pat Consumer paper MBV investors, LLC 1 Paps 2 of 6 December 17, 2007 Type of Impact Amount Approved (Units) Phu Loeadon or Reference 404/Wetland 0.479 acres PCN 10 of 17 Stream • perennial 274 linty feet PCN Page 10 of 17 Buffer - Zone 1 18,333 (square ft. PCN 14 of 17 Buffer -Zone 2 19,912 (square ft.) PCN page 14 of 17 2. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Conswction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 3. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, instalhtion, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requaenenb specified in the most recent version of the North Carolina S&*mont and Erasion Control Mamal. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contrhetor-owned or leased borrow pits associated with the project. c. Sufficient materiab required for stabilization and/or repair of erosion control measures and stormwater rotating and treatment shall be on site at all times. 4. Sediment and Erosion Control Measures Sedimmt and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six monads of the date that the Division of Lard Resources has released the project; 5. Culvert Installation All work in or adjacent to strearm waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Makdaaamm Activities manual such as sand ags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. Culverts required for this project shalt be installed in such a manner that the original stream profiles are not altered. Existing strain dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts :ball be designed and installed to allow for aquatic life movement as well a to prevent head cutting of the streams. If any of the existing pipes are or become perched, the appropriate MBV Investors, LLC Page 3 of 6 December 17, 2007 stream grade shall be re-established or, if the pipes installed in a perched manner, the pipes shall be removed and re-installed correctly. Culvert(s) shall not be installed in such a manner that will canna aggradation or erosion of the stream up or down stream of the culvert(s). Existing stream dimensions (including the Cron section dimensions, poem and longitudinal profile) shall be maintained above and below locations of each culvert. Therefore, you must provide plan: with adequate details that indicate that the current stability of the straa» will be maintained or enhanced. You must receive write approval from this Office for the above plans before the culvert(s) is installed. Culvert(s) must be installed according to approved plans. Placement of culverts and other structures in waters, streams, and wetlands must be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 pest of the culvert diameter for culverts having a diameter Was than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a tanner that may result in dis•equilibrumn of wetlands or strenmbeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium shall be maintained if requested in writing by DWQ. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be cued where practicable instead of rip rap or other bank hardening methods. If rip-rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water QUA*. Installation of culverts In wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. Upon completion of the project, the Applicant shall canplew and return the enclosed "Certificate of Completion" form lo notify NCDWQ when all work included in the ¢Wl Certification has been completst The responsible pony shall complete the attached form and return it to the 401/Wedab Unit of tba NC Division of Wader Quality upon completion of the project. Please sandphomgrq0v &pow= and downrwom q'eaeh culvert she to docurarrent cO 7va installation along with the Cert f scats of Conplettar form. 6. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and probative bulfius in order to assure compliance for fidme wedand, water and buffer impact. These mechanisms shall be put in place prior to impactbhg any wetlands. wates andlor buffers approved for impact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded flomn the 401/Wedands Unit web site at http:/&tUenr.SWD.nc.us/ncwedaoh. The text of the sample deed notification may be modified as appropriate to suit to this project. 7. Written Stormwater Management Plan (Final Plan Needed) Required For Each Phase A final, written stormwater management plan (including a signed and notarized Operation and Makdonarm Agreement) Jisr glenF phow ojshs endn projar shall be submitted to the 401 Oversight and Express Permitting Unit (2321 Crabtree Blvd., Suite 25% Raleigh, NC, 27604) and the stormwater management plans shall be approved in writing by this Office before the h#Vw&, MBV Investors, LLC Page 4 of 6 J December 17, 2007 occapkd lnfrMtrudwe occWency of bxUdinas for tkst pertlculor pk+ese may occur. You have the option of using the Express Review Program for expedited approval of these plans. If you propose to use the Express Review Program, remember to include the appropriate fee with the plan. Site-specific stormwater management shall be designed to remove 85% TSS according to the latest version of Mrs Stormwater Best Management Practices manual at a minimum. Additionally, in watersheds within one mile and draining to 303(d) listed waters, as well as watersheds that are classified as nutrient sensitive waters (NSW), water supply waters (WSJ trout waters (Tr), high quality waters (HQW), and outstanding resource waters (ORW), the Division shall require that extended detention wetlands, bio-retention areas, and ponds followed by forested filter strips (designed according to latest version of the NCDENR Stormwater Best Management Practices Manual) be constructed as part of the stormwater management plan when a site-specific stormwater management plan is required. The structural stormwater practices as approved by the Wetlands Unit as well as drainage patterns man be maintained to perpetuity. No changes to the structural stormwater practices shall be made without writow au diorization from the Division of Water Quality. The following language is hereby incorporated into this Condition per the request contained in your correspondence to DWQ, dated May 15, 2007, and received by the DWQ on May 16, 2007: Phase 1. Ths final somwater mmaatsmsnt fac#litiss for Phase 1(Ow includes Lot 1. Wal-Mart Son 's Club. and Skilok Green Glsn1 shdl be constructed aeeord#tts< to the g2pw ed stoowrwcrter managMent tit rseetved on Me 15, 2007. The swrmwater d?a#nagg jai r=ve wd tssatrns?tt facMdes shall be constructed and onsratloral prior to o=jgb -t= gM gf the above buddLm Phase 2: Find gaft and #ma= to Wadmub #3C. #4. #6A. and #6B wiU be bared on the nrslbnlttaru+ stwwwater ssma:Qrassnt gkm received MO 13.2007. Now ofihe ba#ldlmrs and infra mwtun associated with Phase 2 d&9 includes Lear 2 thronaln 10 and Lower Shiloh Wov will be occutried wntil the stormmwater d?airwae Jaftur icture and "annew facilitiu are contracted and otxrat#onal accord to the gp oved stormwater management Phase 3: Find graft based on the amfink= stamwater manasjW&maser reeehyd Ma 15. 2007. Now oftht ba#leliiats and inlfastructurr associated wllh Phase 3 bthat includes Lot 12) will be #nfrastracmM and treat aw fas&ffu ass conrtractsd and gRoglond ame din. to the ggowd stormwater mmugsment nkns. 8. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A NCAC 2B.0233 and OC3627; MBV Investors, LLC Page 5 of 6 December 17, 2007 9. Compensatory Mitigation Using the Ecosystem Enhancement Program (EEP) Mitigation must be provided for the proposed impacts as specified in the table below. We understand that you wish to make a payment to the Wetlands Restoration Fund administered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. Until the EEP receives and clears your check (made payable to: DENR - Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 733-5205 if you have any questions concerning payment into a restoration fund. You have 60 calendar days from the date of this approval to make this payment. For accounting purposes, tkis Autlwmization CertlAeate andwrises payment into the Wetlands Restoration Fund to meet the feflowing compensatory atigation requireneent.- Tue 01-and C1 - bred Rtra a" J!k*0 W Sbum - 274 !et Nsuw=020201 Bunn Zees 1 3X649 (wAn tilt Noun/03020201 Buft Zone 2 1 926 fmmme 69) NeuMM020201 10. Cntificue of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Huffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 OversighVExpress Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations of any condition heroin set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditioa of this Certification (associated with the approved wetland or stream impacts). you may ask for an a4udieatory hearing. You must act within 60 days of the date that you receive this kilter. To ask for a hearing, send a written petition, which conforms to Chapter 1509 of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be roferrnd in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. I SOB. MBV Investm, LLC Page 6of6 -j December 17, 2007 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have any questions, please telephone Cyndi Karoly or Ian McMillan at 919-733-1786. Sly, ;Oleen H. Sullins CHS/ym Enclosures: GC3705 Certificate of Completion cc: USACE Raleigh Regulatory Field Office Lauren Witherspoon, DWQ Raleigh Regional Office DLR Raleigh Regional Office File Copy Central Files Craig M. Duerr, Kimley-Horn and Associates, Inc., P.O. Box 33068, Raleigh, NC 27636-3068 HeRww: 041764Vw3SMiWbCrouk*Wdcs Dwbm)$01 NBR P.O. Box 33068 Raleigh, North Carolina 27636-3068 TEL 919 677 2000 PAX 919 677 2050 Transmittal Date: 2/26/08 Job Number: 015476039 Project Name: Shiloh Crossing (DWQ Project #04-1764, Ver. 4) To: Kelly Williams North Carolina Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699-1652 We are sending these by ? U.S. Mail ? Other We are sending you ® Attached © Shop drawings ? Other ® FedEx ? Hand Delivery ? Under separate cover via the following items: ? Prints/Plans ? Samples ? Specifications ? Change Orders copies Date No. Description 1 - NCEEP Mitigation Payments 1 2/14/08 NCEEP Invoice 1 8/29/07 MBV/Preston Development Authorization These are transmitted as checked below: ® For your use ? Approved as submitted ? Resubmit ? Copies for approval ? As requested ? Approved as noted ? Submit ? Copies for distribution ? For review and comment ? Returned for corrections ? Return ? Corrected prints Enclosed, please find the required mitigation payment including $174,433.15 from the previous NCEEP Invoice and another $14,585.60 for the balance due for the attached NCEEP Invoice. If you have questions, feel free to contact me at (704) 333-5131 or Austin.watts @kimley-horn.com. Copy to: J. Speake (Shiloh Morrisville) Signed: Austin Watts, P.E. J. Callaway (Wal-Mart Stores) Ek'affllstem ement PROGRAM INVOICE February 14, 2008 Chris Calloway 2001 SE 10" Street Bentonville, AR 72716-0550 Project: Shiloh Crossing County: Wake/Durham DWQ#: 04-1764 COE#: 2004-21479-292 EEP M ILF-2006-4850 You have elected to satisfy the compensatory mitigation requirements of the Section 401/4041CAMA permit(s) issued for the above referenced project through payment of a fee to the North Carolina Ecosystem Enhancement Program (NCEEP). In accordance with I5A NCAC 2H.0500, the amount you owe is based upon the 2007-08 Fee Schedule and has been calculated as follows (Please note: payment for wetlands is calculated in increments of 0.25 acres). If you have any questions concerning this payment, please call Kelly Williams at (919) 716-1921. Habitat Type Riparian Wetlands Non-riparian Wetlands Stream Invoiced Amount 0.25 acres 0.25 acres 548 linear feet Buffer (Zones 1 & 2) 45,575 square feet TOTAL AMOUNT DUEif paid within 60 days Fee Schedule x $ 29,351.00 X $ 14,676.00 x $ 245.00 x $0.96 Cost $7,337.75 $3,669.00 $134,260.00 W $43,752.00 $189,018.75 If payment is not received within 60 days of the date of this invoice, it will expire. Note that your permit(s)-may require payment before this date. Subsequent invoices will be based on the fee schedule in effect on the date they are issued. Please send a check payable to NCEEP for the Total Amount Due to the appropriate address below and enclose a copy of this invoice. US Mail: NCDENR Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699-1652 Physical Address (for other delivery services): NCDENR Ecosystem Enhancement Program 2728 Capital Boulevard, Suite 1H 103 Raleigh, NC 27604 Please note that a payment made to NCEEP is not reimbursable unless a request for reimbursement is received within 12 months of the date of the receipt. Any such request must be accompanied by letters from the permitting agencies stating that the permit and/or authorization have been rescinded. If the account name on the check is not the same as the permit holder's name please include a signed statement by the permit holder that the check is beingwritten on behalf of, and with full knowledge and authorization of, the permit holder. YOU MUST BE IN POSSESSION OF THE PAYMENT RECEIPT FROM NCEEP PRIOR TO COMMENCING THE ACTIVITIES AUTHORIZED BY THE DEPARTMENT OF ARMY 404 PERMIT AND/OR THE 401 WATER QUALITY CERTIFICATION. cc: Cyndi Karoly, NCDWQ Wetlands/401 Unit Jamie Shern, USACE- Raleigh; Thelma Hemmingway- USACE, Wilmington Todd Tugwell,agent File RP,storu ... .. 'Pro" oar f Fa North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 1919-715-0476 1 www.nceep.net PRESTON DEVELOPMENT COMPANY 100 Weston Estates Way ¦ Cary, North Carolina 27513 ¦ 919461-3M ¦ Fax 919$77-8600 www.tuestondevelo rnentcom August 29, 2007 North Carolina Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699-1652 Attn: William D. Gilmore Re: Mitigation Payment Authorization Shiloh Crossing Shopping Center Highway 54 and 1-540, Durham/Morrisville, NC DWQ Project #04-1764 ver. 2 COE #2004-21479 EEP #ILF-2006-4850 Dear Mr. Gilmore, MBV Investors LLC, sold the above referenced property. The property is currently owned by Shiloh Morrisville, LLC and Wal-Mart Stores, Inc. By this letter we authorize Wal-Mart Stores, Inc. to make mitigation payment for the approved impacts in the referenced DWQ and COE approvals. If you have any questions, please feel free to contact at me at (919) 481-3000. Very truly yours, `'1? Karl Blackley VP Preston Realty, Inc. (for MBV Investors LLC) CC: Craig Duerr (Kimley-Horn and Associates) J Chris Callaway (Wal-Mart Stores, Inc.) Jim Angeloni (Shiloh Morrisville, LLC) KIMLEY-HORN AND ASSOCIATES, INC. 15456 ENGINEERS-AND PLANNERS P.. O. BOX 33068 RALEIGH, NC 27636-3068 6&156/531 BRANW awes PAY DATE -lZEBR T=Y 21, 7002 TO THE ORDER OF NCEEP $ 14,585.60 RBA T r DOLLARS ® pp w _mw FM UWM Nrfkwwaft* KIMLEY-HORN AND ASSOCIATES, INC. ------- ----- F• Orp?001?it/ro5v0f361 .. ?.-?.__ mr N'000'?54561I' ?;053 i0L56L?;;20 7998 5 3 2Q3?39n' PAY 110487 2 2601I' x0;53 LO L56 L1: 2079900 L36854n' ii '.i l (b/Z 13?HS 3?S) 3wlHO1VW - - -- --- - - --- --0 (7777 H5 33S) 3NI-.H?IVW 1 r 17 . ??jj-- u u W w°zz,Z ?wyF= < r w¢mm _ -- em.,:, st z r j F d (w o ' m >;S p ? ?? roo az ad> ? ?6?x - ? " I? rc c? RI Ii o „rv ?g O? ^gPr sit $ 85m / szcso s oxT /?? $? LL Ig rv r % m -wily w 4 s€ / aps•m ?• I m dial na r w yp laws 1, ?A„ 7 / ?" Ig am n _ rvr - - e xc i' - xY'?o ?m* „R rv v n9 ?r _ got 00 = 4? 3 ?? Ia ^ o..m ^FR V1 ? xrtoe ?t ts[, -.. ys[m mm'°mm^, 3'^? f / -01 27- g. / VI rti ^? / - z o v °osn m m ?? e¢ h1•li SIT y nso -153 awn -,,I'll ask., ^ A ?mmrv / a6 ?.a f ?S ?Q -6 v L, w ? - mll m - ? a...,n. 1I / o.mrv? ?rvrv II pus / CrvI _ mam ?-:7B?6f °0.6tlx w.Vn all mam ti si •i War a <<< a a a a a <. a s-- a o 5 o ? • ii ? ? i i i -__ 'fir S 1 i r? B ) i. ? 3?3 ON ,1 rcm- ? ?J s> ooza 9g?y ? „? tiFh3?>dQ r °0 zoQ.o??cizo -O .'oz -1 `Y I nrr L4aw-ooo .`nsW oa_ 0 0 i-isomz,z,?xx> ? c'a=n e ?,. c?waaww Lea¢___ a O??a'w rx-000 Lu?i "rc K$ 0.101-wCiO? ll?n .\ w %w ? LL s ;rya z_nM? r. _N ? m " 5 O'\reb lug _ Q el m CLI ZE m= L j "rc aZ/3 a??ryAz IS 1 e 1 1 x I'. s3 IL _ a 71- i 1 ' 1 1 1 ? of Zir mam 3 Lei i i Y S 7 li y i n i tS£ ur _ a v a s(b n ` 3 g ?? °P$1 'lame .. a/i i33HS 33s) 3m iw m ?? "?mm (a/i L33HS 33S) 3MIKAVW \I ° I A?i," I s ??e ?$ I I ^rA l ?I .,Ew? ?s ? ?? m8 s e I ? £ n ZS,B`o Fl? a I o s £ ? r A has $ ? oy \ ? c I A( Ay jk? Sga,04v ks?.``a I / Ws I ^ I !, /?60. `oesW a£ s A, ? I v ?° m ?.o ? m f ? byk JO6 !?? ?$aom ?mr i ry F?'rn'`? I P?s?. r s;s? I s 9 er?i???'`1 ?op•a?+ f 8y i. "? \ oll s 27 \ Y mfl \ :\ o$ b °? I ` / ?? aa e / ?OP k? y > U al E r i3 -zWW arUpo? .? a a a a a a a a a ¢? j u o I / / k/ m/ o? F / No?YZ Od ¢a?,? z o?ao'3?Ey?F??? a 3a?'tiz2LLYy?y o z?+ 4 azrz-as W `z?zm?o"uo ? ~ogog'gyzuzia? m C) °_?a5?aoozm N mo?muoc $°? ys ms;2SS / / 5 y?. m-00 a°$a s » e'?ea h° a O N-1 ? mr$°ss z V / P Q ff/ O b v 3 / U?