HomeMy WebLinkAbout20201981 Ver 1_Pre-Filing Acknowledgement Email_20201222Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Tuesday, December 22, 2020 8:30 AM
To: Moore, Della R
Subject: Pre -Filing Meeting Request Acknowledgement - Durham Street Bridge Extension -
20201981 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form
for Durham Street Bridge Extension that you submitted on (date). The ID number for that project is
20201981, Version 1.
Reviewer Contact Information:
Reviewer:
Reviewer Email:
Reviewing Office: Winston-Salem Regional Office - (336) 776-9800
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email
address, as responses are not monitored.
1
ID#* 20201981
Version* 1
Regional Office* Winston-Salem Regional Office - (336) 776-9800
Reviewer List* Dave Wanucha
Pre -Filing Meeting Request submitted 12/17/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Della Moore
drmoore2@ncdot.gov
Durham Street Bridge Extension
NCDOT
Alamance
Street Address
P.O. Box 14996
Address Line 2
aty
Greensboro
Rbstal / Zip Code
27415
Is this a transportation project?* r Yes r No
State / Frovince / Region
NC
Country
USA
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
17.B.P.7.R.122 & B-5346/SR1529
Do you know the name of the staff member you would like to request a meeting with?
Dave Wanucha
Please give a brief project description below.*
The North Carolina Department of Transportation (NCDOT) has
proposed to replace Alamance County Bridge No. 3 on Durham
Street (SR 1529), project B-5346 over Dry Run creek; a poorly
functioning, substandard old bridge with a new bridge. Bridge No. 3 is
located just north of the Town of Elon and City of Burlington.
Subdivision Streets intersect SR 1529 just north and south of the
existing bridge location. The existing structure is a three span
(1@17'8, 1@17'0, 1@17'8) and is a timber deck on timber joists. The
abutments and interior bents are timber caps, posts and concrete
sills (timber bulkheads).The proposed structure is a single span
(1 @70'-24") prestressed concrete cored slab with 4' deep caps. This
structure has been designed to have as little environmental,
wetlands, and surface water impacts as possible. 2:1 roadway fill
slopes shall be constructed to minimize drainage impacts in
accordance to NCDOT design standards.
Please give a couple of dates you are available for a meeting.
12/22/2020
1 /5/2021
Please attach the documentation you would like to have the meeting about.
17BP7R122 Bridge No. 3 B5346 100%
13.98MB
Plans.pdf
00 0003 2017 Rev 2017 B5346 DRY CREEK
3.83MB
SR 1529.pdf
B-5346 NRTR.pdf
4.52MB
B-5346 Vic Map.pdf
219.11 KB
Bridge No. 3 Site Map.pdf
1.11 MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 12/17/2020