Loading...
HomeMy WebLinkAbout20201981 Ver 1_Pre-Filing Acknowledgement Email_20201222Strickland, Bev From: laserfiche@ncdenr.gov Sent: Tuesday, December 22, 2020 8:30 AM To: Moore, Della R Subject: Pre -Filing Meeting Request Acknowledgement - Durham Street Bridge Extension - 20201981 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Durham Street Bridge Extension that you submitted on (date). The ID number for that project is 20201981, Version 1. Reviewer Contact Information: Reviewer: Reviewer Email: Reviewing Office: Winston-Salem Regional Office - (336) 776-9800 When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. 1 ID#* 20201981 Version* 1 Regional Office* Winston-Salem Regional Office - (336) 776-9800 Reviewer List* Dave Wanucha Pre -Filing Meeting Request submitted 12/17/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Della Moore drmoore2@ncdot.gov Durham Street Bridge Extension NCDOT Alamance Street Address P.O. Box 14996 Address Line 2 aty Greensboro Rbstal / Zip Code 27415 Is this a transportation project?* r Yes r No State / Frovince / Region NC Country USA Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* 17.B.P.7.R.122 & B-5346/SR1529 Do you know the name of the staff member you would like to request a meeting with? Dave Wanucha Please give a brief project description below.* The North Carolina Department of Transportation (NCDOT) has proposed to replace Alamance County Bridge No. 3 on Durham Street (SR 1529), project B-5346 over Dry Run creek; a poorly functioning, substandard old bridge with a new bridge. Bridge No. 3 is located just north of the Town of Elon and City of Burlington. Subdivision Streets intersect SR 1529 just north and south of the existing bridge location. The existing structure is a three span (1@17'8, 1@17'0, 1@17'8) and is a timber deck on timber joists. The abutments and interior bents are timber caps, posts and concrete sills (timber bulkheads).The proposed structure is a single span (1 @70'-24") prestressed concrete cored slab with 4' deep caps. This structure has been designed to have as little environmental, wetlands, and surface water impacts as possible. 2:1 roadway fill slopes shall be constructed to minimize drainage impacts in accordance to NCDOT design standards. Please give a couple of dates you are available for a meeting. 12/22/2020 1 /5/2021 Please attach the documentation you would like to have the meeting about. 17BP7R122 Bridge No. 3 B5346 100% 13.98MB Plans.pdf 00 0003 2017 Rev 2017 B5346 DRY CREEK 3.83MB SR 1529.pdf B-5346 NRTR.pdf 4.52MB B-5346 Vic Map.pdf 219.11 KB Bridge No. 3 Site Map.pdf 1.11 MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 12/17/2020