Loading...
HomeMy WebLinkAbout20040325 Ver 2_Staff Comments_20100921?br y c), 32`? v. Z Hill, Tammy From: Hill, Tammy Sent: Tuesday, September 21, 2010 1:04 PM To: 'Sugg, Mickey T SAW' Subject: RE: Barra Farms II-draft MBI Hi, Mickey! Thanks for your lint-worthy opinion :) We agree, and will have to be careful to catch that kind of situation when it comes up in the future. The PCN is moving through our triage process and I expect the 401 will be issued by the end of the week. Thanks! Tammy E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message----- From: Sugg, Mickey T SAW [mailto:Mickey.T.Sugg@usace.army.mil] Sent: Thursday, September 16, 2010 4:16 PM To: Hill, Tammy Subject: RE: Barra Farms II-draft MBI Thanks Tammy. My take on the specific non-riparian types would be that it's a permit decision. If the project manager makes the decision that it's out of kind, then they deny the use of the bank or raise the ratios. Just my thought, which is worth about $2.38 and a pocket of lint. -mick Mickey Sugg, Project Manager US Army Corps of Engineers 69 Darlington Avenue Wilmington NC 28403-1343 (910) 251-4811 (o) (910) 251-4025 (fax) The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://per2.nwp.usace.army.mil/survey.html to complete the survey online. -----Original Message----- From: Hill, Tammy [mailto:tammy.l.hill@ncdenr.gov] Sent: Thursday, September 16, 2010 3:23 PM To: Sugg, Mickey T SAW Subject: RE: Barra Farms II-draft MBI Hi, Mickey. I've been looking at the draft MBI & final mitigation plan (July 2010) for Barra Farms II. MBI looks fine except for typos in Table 5 (the cumulative percentages are incorrect for Years 3-6). In Section XIII.I., please have monitoring and other reports sent to Mr. Ian McMillan, NCDENR-Division of Water Quality, 401 Oversight & Express Permitting Unit, Mail Service Center 1650, Raleigh, NC 27699-1650. As a general issue (but one that might effect this bank), we're having heartburn about lumping non-riparian NC WAM wetland types into one box for mitigation because it allows for such a broad range of wetlands to be "in-kind" (e.g. pocosin can offset loss of non-riverine swamp forest). I believe John D has been discussing this with Corps folks (Lekson, et al) so maybe it's already been resolved. I'll talk with John about it tomorrow & get back to you. I'm hoping to get the 401 out the door next week. Thanks! Tammy Tammy L. Hill Environmental Senior Specialist NC Division of Water Quality (401/Wetlands) 2321 Crabtree Blvd., Suite 250 Raleigh, NC 27604 919-715-9052 Tammy.L.Hill(@ncdenr.gov E-mail correspondence to and from this address may Records Law and may be disclosed to third parties. be subject to the North Carolina Public -----Original Message----- From: Sugg, Mickey T SAW [mailto:Mickey.T.Sugg@usace.army.mil] Sent: Tuesday, September 07, 2010 10:16 AM To: smtp-Sechler, Ron; Howard Hall; Becky Fox; Ellwood, Molly M.; Sollod, Steve; Dorney, John; Hill, Tammy; Wilson, Travis W. Cc: Christian Preziosi Subject: Barra Farms II-draft MBI Morning all, I am forwarding you a draft copy of the Barra at and provide me with input. If you recall July 19th. Once the MBI is finalized, I will Thanks, -mickey II MBI that I would like for you to take a look the mitigation plan was sent out the week of be sending it out for IRTsignatures. Mickey Sugg, Project Manager US Army Corps of Engineers 69 Darlington Avenue Wilmington NC 28403-1343 (910) 251-4811 (o) (910) 251-4025 (fax) The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://pert.nwp.usace.army.mil/survey.html to complete the survey online. -----Original Message----- From: Christian Preziosi [mailto:cpreziosi@lmgroup.net] Sent: Friday, September 03, 2010 4:22 PM To: Sugg, Mickey T SAW Subject: Barra II - MBI 2 Mickey - Here is the updated MBI with AELT identified as the easement holder. I assume there will be no significant changes to the latest mitigation plan - so I wanted to go ahead and send this to you. The owner will be securing bonds for the construction and monitoring. His attorney will also be providing a title opinion. Give me a call or email if you have questions or need anything else. Thanks- Christian Christian Preziosi Land Management Group, Inc. P.O. Box 2522 Wilmington, NC 28402 Office 910.452.0001 Cell 910.471.0515 Fax 910.452.0060 cpreziosi(@lmgroup.net 3