Loading...
HomeMy WebLinkAbout20180765 Ver 5_More Info Received_20201223Strickland, Bev From: Clement Riddle <clement@cwenv.com> Sent: Wednesday, December 23, 2020 10:39 AM To: Brown, David W CIV USARMY CESAW (USA) Cc: Owen Schultz; Yankura, Kaylie; Homewood, Sue Subject: [External] RE: Request of Additional Information Sep 2020 - High Hampton Redevelopment Permit Modification Request, SAW-2017-02281 Attachments: Impact Maps 12-22-20.pdf, Impact Plan 5-0 12-22-20.pdf, Impact As -Built Tables 12.12.20.docx Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. David, In response to your email September 23, 2020 (below). High Hampton engaged with Sylvester & Co. to survey the limits of disturbance associated with wetland fills and stream culverts. This survey was completed in late November 2020. Attached are the following: 1. Updated Impact tables for streams and Wetland Impacts. 2. 11x17 maps showing the wetland/stream boundary with surveyed impact information 3. Revised Figure 5 date December 22, 2020—Site Impact Plan. In summary: permitted permanent stream impacts were 681 If. of stream (roads and golf) Permitted wetland Impacts were 0.326 acres (roads and golf) Permitted open water impacts of 0.15 acres (beach) Streambank stabilization 300 If. 10 Utility line crossings 200 linear feet As -Built Survey summary and revised permit modification proposed impacts area as follows: As -built permanent stream impacts 773 If As -built permanent wetland impacts 0.212 ac Permitted open water impacts of 0.15 acres (beach -not done yet) — No change Streambank stabilization 300 If. (not done yet) — No change Utility line crossings 200 linear feet (4 of the utility crossings have been completed. Utilities were either attached to bridges or placed in fill over the culverts). Please do not hesitate to contact me with any questions. I look forward to your review and scheduling of a site visit to inspect these areas. Clement From: Brown, David W CIV USARMY CESAW (USA) <David.W.Brown@usace.army.mil> Sent: Wednesday, September 23, 2020 10:54 AM To: Clement Riddle <clement@cwenv.com> Cc: Owen Schultz <oschultz@danielcommunities.com>; Yankura, Kaylie <kaylie.vankura@ncdenr.gov>; Homewood, Sue <sue.homewood@ncdenr.gov>; Steve Beasley <stevebeaslev@iacksonnc.org> Subject: Request of Additional Information Sep 2020 - High Hampton Redevelopment Permit Modification Request, SAW-2017-02281 ClearWater Environmental Consultants, Inc. Asheville, NC Clement Riddle, The Corps has received (July 14, 2020) and reviewed your request to modify the issued standard permit for the High Hampton Redevelopment project in Cashiers, Jackson County, North Carolina. Also, the Corps has received DWR's recent request for additional information for this permit modification. The permittee has several times during the past 2 years performed work for the redevelopment project without authorizations from DWR and the Corps. This request for modification to the existing permit is another example of this conduct. The Corps fully supports DWR request for additional information. In additional to DWR's request the Corps adds the following: 1) Submittal of a set of plans which depict the location of jurisdictional features prior to land disturbance activities at the project site with an overlay of the current grading and construction impacts within the project area. Please copy DWR on submittal of these plans. 2) After these plans are reviewed by the Corps an inspection of the site will be scheduled to verify the information. As noted to permittee several times prior to this date, conducting activities in areas outside of the Corps jurisdiction or within jurisdictional waters of the U.S. (WoUS) at the High Hampton property(s) does not imply that this office will necessarily approve future proposed impacts to WoUS. Development activities undertaken on the property(s) to date will not be adequate justification for authorization of unauthorized or future impacts. The Corps will examine all requests which propose impacts to WoUS to ensure you have appropriately avoided, minimized, and/or mitigated for unavoidable impacts. Please provide the information requested by December 31, 2020, or your request will be withdrawn. If you have any questions please contact me. Sincerely, David Brown, PG Regulatory Specialist/Geologist USACE Wilmington District -Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 828-271-7980, ext. 4232 david.w.brown@usace.armv.mil WETLAND IMPACT #24 ) 0.006 AC a a WETLAND IMPACT #23 0.001 AC. LEGEND / STREAM CEC WETLAND IMPACT #23 146 LF CEC STREAM CEC CULVERT / / CEC LINEAR WETLAND WETLAND SURVEYED LIMIT OF IMPACT #25 - - DISTURBANCE 0.014 AC. = SURVEYED CULVERT 1% y WETLAND IMPACT STREAM IMPACT / STREAM IMPACT #22 WETLAND 247 LF IMPACT #26 0.006 AC. \\ 1111111110 ��� /HOLE #1 GRAPHIC SCALE xo xo a ao ( IN FEET ) \\ I"` -SURVEYED \\ I LIMITS OF r/40 J DISTURBANCE (TYP) � / I WETLAND IMPACT #28 �� 0.011 AC. NEW STREAM IMPACT #24 36 LF HOLE #9 1. SURVEY INFORMATION PROVIDED BY SYLVESTER & COMPANY, P.A. 2. DELINEATION INFORMATION PROVIDED BY CLEARWATER ENVIRONMENTAL (SUBMETER ACCURACY) WGLA ENGINEERING, PLLC 724 5th AVENUE WEST HENDERSONVILLE, NC 28739 (828)687-7177 WGLA.COM NC LICENSE P-1342 High Hampton Cashiers Township Jackson County North Carolina \�\0 II I I III/,// ��N CA/Yn ° qFE Ss ° F41 111111%r�/ ° Noz 1.0r ° Cg���stru�ti� i�� NciNE�°�J A M Fz /''�/I IIIIII'00\ REVISIONS DATE DESCRIPTION e MF Know what's below. Call before you dig. PROJECT NUMBER: 19159 DATE: 12/21 /20 DRAWN BY: KHC CHECKED BY: WRB AB Stream & Wetland Impact Maps Hole 1 & 9 C-100 SCALE: 1 "=40' WETLAND IMPACT #9 0.007 AC. AM CT #14 F GRAPHIC SCALE b b 80 I]0 ( IN FEET ) r r r r r r r r r r r r r r r r r r r r LEGEND CEC WETLAND CEC STREAM CEC CULVERT CEC LINEAR WETLAND SURVEYED LIMIT OF -- --- DISTURBANCE SURVEYED CULVERT WETLAND IMPACT STREAM IMPACT 1. SURVEY INFORMATION PROVIDED BY SYLVESTER & COMPANY, P.A. 2. DELINEATION INFORMATION PROVIDED BY CLEARWATER ENVIRONMENTAL (SUBMETER ACCURACY) WGLA ENGINEERING, PLLC 724 5th AVENUE WEST HENDERSONVILLE, NC 28739 (828)687-7177 WGLA.COM NC LICENSE P-1342 High Hampton Cashiers Township Jackson County North Carolina ��IIIIiiIili��� oOFESs e FiilImiiij ° Noz 1.0r Cg ilptru�tFan NciNE�a�J A M ///" I I n n REVISIONS DATE DESCRIPTION Fee M Know what's below. Call before you dig. PROJECT NUMBER: 19159 DATE: 12/21 /20 DRAWN BY: KHC CHECKED BY: WRB AB Stream & Wetland Impact Maps Hole 2 C-101 SCALE: 1 "=60' LEGEND ' ' O CEC WETLAND CEC STREAM o 0 0 0 CEC CULVERT . . . . . CEC LINEAR WETLAND SURVEYED LIMIT OF ' ' ' ' ' ' ' ' ' — — DISTURBANCE . . . . . . . . . . . . . . . SURVEYED CULVERT ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' F WETLAND IMPACT EDGE D6^mGE Of g5UAE _ , STREAM IMPACT SURVEYED LIMITS OF DISTURBANCE WETLAND IMPACT #30 0.004 AC. /HOLE #8—/ GRAPHIC SCALE xo xo a ao ( IN FEET ) 100 1. SURVEY INFORMATION PROVIDED BY SYLVESTER & COMPANY, P.A. 2. DELINEATION INFORMATION PROVIDED BY CLEARWATER ENVIRONMENTAL (SUBMETER ACCURACY) WGLA ENGINEERING, PLLC 724 5th AVENUE WEST HENDERSONVILLE, NC 28739 (828)687-7177 WGLA.COM NC LICENSE P-1342 High Hampton Cashiers Township Jackson County North Carolina CAR 0� �gFESs e ° Noz 19or Cg ilptruF i�� NciNE�a�J A M ///" I I n n REVISIONS DATE DESCRIPTION e MF Know what's below. Call before you dig. PROJECT NUMBER: 19159 DATE: 12/21 /20 DRAWN BY: KHC CHECKED BY: WRB AB Stream & Wetland Impact Maps Hole 8 C-102 SCALE: 1 "=40' PROPERTY LINE (TYP.) I I I SURVEYED LIMITS OF DISTURBANCE STREAM IMPACT #4A 20 LF GRAPHIC SCALE Ily��4j# M LEGEND CEC WETLAND �III�III� CEC STREAM CEC CULVERT -ill�ill�ill�ill- CEC LINEAR WETLAND SURVEYED LIMIT OF DISTURBANCE SURVEYED CULVERT - M M M M M WETLAND IMPACT HOLE #13 STREAM I IMPACT #4 92 LF OQOOiO f.� �OQ OOOQIQQ' � II STREAM IMPACT PROPERTY LINE (TYP.) a� �II■II I, SURVEYED LIMITS OF DISTURBANCE WGLA ENGINEERING, PLLC 724 5th AVENUE WEST HENDERSONVILLE, NC 28739 (828)687-7177 WGLA.COM NC LICENSE P-1342 High Hampton Cashiers Township Jackson County North Carolina �N CAR' °Nq 9or° C#gptru�tr / ° °NGINE; J . <</AM ?, jj]m III�AAA,\ REVISIONS DATE DESCRIPTION Fee M Know what's below. Call before you dig. PROJECT NUMBER: 19159 DATE: 12/21 /20 DRAWN BY: KHC CHECKED BY: WRB AB Stream & Wetland Impact Maps Hole 12 & 13 C-103 SCALE: 1 "=50' 0 ABANDONED CULVERT ■ ■ ■ ■ ■ PROPERTY LINE (TYP.) ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ APPROXIMATE ■ LOCATION OF i NEW CULVERT HOLE #18 WETLAND IMPACT #20 0.075 AC. STREAM IMPACT #20 49 LF GRAPHIC SCALE xs ss so 100 ( IN FEET ) M M M M M M M T-. LEGEND CEC WETLAND CEC STREAM CEC CULVERT CEC LINEAR WETLAND SURVEYED LIMIT OF DISTURBANCE SURVEYED CULVERT WETLAND IMPACT STREAM IMPACT 1. SURVEY INFORMATION PROVIDED BY SYLVESTER & COMPANY, P.A. 2. DELINEATION INFORMATION PROVIDED BY CLEARWATER ENVIRONMENTAL (SUBMETER ACCURACY) WGLA ENGINEERING, PLLC 724 5th AVENUE WEST HENDERSONVILLE, NC 28739 (828)687-7177 WGLA.COM NC LICENSE P-1342 High Hampton Cashiers Township Jackson County North Carolina N CqR SS/o lelimilr%i °o Nq"froo C#nptrur' lo►tI REVISIONS DATE DESCRIPTION e M■ Know what's below. Call before you dig. PROJECT NUMBER: 19159 DATE: 12/21 /20 DRAWN BY: KHC CHECKED BY: WRB AB Stream & Wetland Impact Maps Hole 18 C-104 SCALE: 1 "=50' V411011 SURVEYED LIMITS OF DISTURBANCE o GRAPHIC SCALE b b 80 I]0 ( IN FEET ) :TLAND 'ACT #11 D01 AC. 410 ■ 11 W.0 Allmlll a r4o i LEGEND CEC WETLAND �III�III�III� CEC STREAM CEC CULVERT CEC LINEAR WETLAND SURVEYED LIMIT OF -- --- DISTURBANCE SURVEYED CULVERT WETLAND IMPACT STREAM IMPACT 1. SURVEY INFORMATION PROVIDED BY SYLVESTER & COMPANY, P.A. 2. DELINEATION INFORMATION PROVIDED BY CLEARWATER ENVIRONMENTAL (SUBMETER ACCURACY) WGLA ENGINEERING, PLLC 724 5th AVENUE WEST HENDERSONVILLE, NC 28739 (828)687-7177 WGLA.COM NC LICENSE P-1342 High Hampton Cashiers Township Jackson County North Carolina CARO�',, � qMs"* e F41Imiiij ° Nozg 9or Cgtlptru, I -ph NciNE�a�J A M ///" I I n n REVISIONS DATE DESCRIPTION Fee M Know what's below. Call before you dig. PROJECT NUMBER: 19159 DATE: 12/21 /20 DRAWN BY: KHC CHECKED BY: WRB AB Stream & Wetland Impact Maps Hole 3 C-105 SCALE: 1 "=60' GRAPHIC SCALE b b 80 I]0 ( IN FEET ) WETLAND IMPACT #29 0.014 AC. U HOLE #8 HOLE #7 'lll_III- WETLAND IMPACT #15 0.011 AC. LEGEND CEC WETLAND CEC STREAM CEC CULVERT CEC LINEAR WETLAND SURVEYED LIMIT OF DISTURBANCE SURVEYED CULVERT WETLAND IMPACT STREAM IMPACT 1. SURVEY INFORMATION PROVIDED BY SYLVESTER & COMPANY, P.A. 2. DELINEATION INFORMATION PROVIDED BY CLEARWATER ENVIRONMENTAL (SUBMETER ACCURACY) WGLA ENGINEERING, PLLC 124 5th AVENUE WEST HENDERSONVILLE, NC 28739 (828)687-7177 WGLA.COM NC LICENSE P-1342 High Hampton Cashiers Township Jackson County North Carolina o o N Oz9 g0 r �g�n�stru�ti ' CAM R• �. REVISIONS DATE DESCRIPTION Fee M Know what's below. Call before you dig. PROJECT NUMBER: 19159 DATE: 12/21 /20 DRAWN BY: KHC CHECKED BY: WRB AB Stream & Wetland Impact Maps Holes 7 & 8 C-106 SCALE: 1 "=60' ILEGEND WGLA ftft'//� CEC WETLAND I _III -III _ CEC STREAM WGLA ENGINEERING, PLLC 724 5th AVENUE WEST l ® CEC CULVERT CEC LINEAR WETLAND HENDERSONVILLE, NC 28739 (828)687-7177 WGLA.0 LICENSE P- NC LICENSE1342 � l SURVEYED LIMIT OF PROPERTY LINE DISTURBANCE (TYP.) WETLAND r ® SURVEYED CULVERT High Hampton IMPACT #22 0.003 AC. e ® WETLAND IMPACT STREAM IMPACT Cashiers Township Jackson County North Carolina l I � . - I . HOLE #11 I = , : � CAR QF...... E SS Noz gor. a i c stru��tf AI REVISIONS q DATE DESCRIPTION WETLAND i IMPACT #21 I 0.006 AC. i i I i • , Knowwhat's b010W. Cali beforeyou dig. ICHECKED IPROJECT l l NUMBER: 19159 DATE: 12/21 /20 DRAWN BY: KHC BY: WRB AB Stream & Wetland Impact Maps GRAPHIC SCALE xs ss so 100 Hole 11 ( IN FEET , C 10 7 SCALE: 1 "=50' WETLAND IMPACT #6 0.005 AC. STREAM ✓ - / STREAM IMPACT #9 � � j - / � _,� 9PAFT #7 I SURVEYED CULVERT i (TYP.) SURVEYED -J CULVERT (TYP.) SURVEYED LIMITS OF DISTURBANCE I I GRAPHIC SCALE ( IN FEET ) 15 STREAM IMPACT #10 58 LF ■III�III�III�III�III■ ■III=III=III=III= IIImIIImIIIm HIM MENEEMEMENEEN LEGEND CEC WETLAND CEC STREAM CEC CULVERT CEC LINEAR WETLAND SURVEYED LIMIT OF DISTURBANCE SURVEYED CULVERT WETLAND IMPACT STREAM IMPACT WGLA ENGINEERING, PLLC 724 5th AVENUE WEST HENDERSONVILLE, INC 28739 (628) 667-7177 WGLA.COM NC LICENSE P-1342 High Hampton Cashiers Township Jackson County North Carolina Preliminary Not For Construction N CAf� oQ DRAFT //�/AM��R ?: 1111111110, REVISIONS DATE I DESCRIPTION M en Know what's below. Call before you dig. PROJECT NUMBER: 19159 DATE: 12/21 /20 DRAWN BY: KHC CHECKED BY: WRB AB Stream & Wetland Impact Maps at Roadway South of Hole #17 C-108 SCALE: 1 "=100' CROSSROAD 1 STREAM IMPACT #23 146 LF (GOLF) STREAM IMPACT #22 247 LF (GOLF) WETLAND .- IMPACT #23 0.001 AC. "r ' (GOLF) s' 0 BRIDGE #1 (ROAD) ♦' ♦\ co BRIDGE #2 (ROAD) MON S.R. REST 6 ROAD ♦, BRIDGE # 7 I 0 `1 \ ' © STREAM IMPACT #4A �� CONSERVATION/ — 20 LF (GOLF)11 s \. / . EASEMENT -Po f WETLAND IMPACT #22 0.003 AC. (GOLF) WETLAND IMPACT #21 ♦ `9� 0.006 AC.(GOLF) ♦♦ Air♦ 4# \( 36 LF STREAM IMPACT #24 0> ; WETLAND IMPACT #18 0.006 AC. (ROAD) SEE INSET "B" INSET 1913111 0 %0 (SEE FIGURES .01) UC #8 UC #6 , UC „#10 o? _���` ROP PROJECT BOUNDARY PROPERTY BOUNDARY GRAPHIC �C AT E TN FEET WETLAND IMPACT #25 0.014 AC. (GOLF) y 13 i 29 21 I 28 � zz 2� 1 WETLAND IMPACT #20 0.075 AC. (GOLF) STREAM - IMPACT #20 49 LF (GOLF) ti 1 y; ........ ..... .......... ..:::..::..: DAM BEACH AREA Milk ;;::< o ♦ BRIDGE 6,750 SF DEVELOPMENT z ♦ ♦ HIGH HAMPTON PROJECT DATA couRr ♦ � -"" o / r ♦ TOTAL PROJECT AREA: 683.58 ACRES i 0 / dA (ROAD) )' ■ JURISDICTIONAL WATER OF THE US _ , PERENNIAL & INTERMITTENT STREAMS 37,265 LF WILDFLOWER ` WETLANDS 27.5724 AC. 1 OPEN WATERS 16.45 AC. LEGEND JURISDICTIONAL IMPACTS 9�m �, ♦ STREAM — ROAD CULVERTS 124 LF PROPERTY BOUNDARY y fig: ■ STREAM — GOLF COURSE 649 LF oP UC #5 SUBTOTAL 773 LF PROJECT BOUNDARY ` ■ BRIDGE STREAM UTILITY LINE TEMPORARY 200 LF WETLAND NO DISTURBANCE A.T.F. WETLAND IMPACT NEW #29 o A.T.F. (ROAD) STREAM BANK STABILIZATION 300 LF.................................... o — — — — — 0.014 AC. (GOLF) ♦ � # 150 LF OF STREAM LINEAR WETLAND BANK STABILIZATION WETLAND — ROADS 0.011 AC. (479 S.F.) i GOLF COURSE 0.201 C A ( 13 591 S.F. «<< G ) OPEN WATER 0 A.T.F. REMOVAL OF WETLAND C SUBTOTAL 0.212 AC. (14,070 S.F.) EXISTING CULVERT A.T.F. WETLAND STREAM 880 LF (GOLF) IMPACT #9 0.007 AC. (GOLF) OPEN WATERS — DEVELOPMENT 0.15 AC (6,750 SF) ------------ CULVERT J A.T.F. WETLAND IMPACT #15 AVOIDANCE (BEACH AREA) 0.011 AC. (GOLF) STREAM 36,584 LF PROPOSED IMPACT A.T.F. STREAM IMPACT #14 BRIDGE —ROAD 9 EA. HAND CLEAR NO IMPACT 59 LF GOLF C C A.T.F. WETLAND IMPACT NEW 30 (GOLF) # WETLANDS 27258 AC. 0.004 AC. (GOLF) OPEN WATERS 16.282 AC. ,�� �',' PRESERVATION AREA A.T.F. WETLAND IMPACT #14 MITIGATION STREAM BUFFER 0.041 AC. (GOLF) PHASE I NCDMS STREAM MITIGATION 1,012 LF >> PROPOSED GOLF COURSE HISTORIC CUMULATIVE MITIGAION 113 LF WETLAND IMPACT #11 SUBTOTAL 1,125 LF PROPOSED UTILITY CROSSING 0.001 AC. (GOLF) NCDMS WETLAND MITIGATION 0.65 AC PHASE II WASTEWATER DRIP IRRIGATION NCDMS STREAM MITIGATION 350 LF LOCATIONS PERMIT MODIFICATION NCDMS STREAM MITIGATION 184 LF PROPOSED STREAMBANK NCDMS WETLAND MITIGATION 0 AC Em STABILIZATON WGLA ENGINEERING, PLLC 724 5th AVENUE WEST HENDERSONVILLE, NC 28739 (828) 687-7177 WGLA.COM NC LICENSE P-1342 High Hampton Cashiers Township Jackson County North Carolina CAR _ o . o CaoA '~— n �G0000 ,,. �.,,� /A M /�1111�111�� REVISIONS DATE DESCRIPTION 4/2/18 Revision 5/15/18 Revision 7 30 18 Revision 8/30/18 Resubmittal 1 /19 Revision 4/12/19 Property Revision 6/17/19 Revision 4/1 /20 Revision 12/22/20 Revision • V� Know what's below. Call before you dig. PROJECT NUMBER: 17133 DATE: 12/22/20 DRAWN BY: KHC CHECKED BY: TWT Stream and Wetland Impact Map Figure 5.0 SCALE: 1 "=500' Table 1 and Table 2 provide an updated comprehensive list of proposed stream and wetland impacts for the project and As -Built impacts. This information is also updated on the attached Stream and Wetland Impact Map (Revised December 22, 2020; Figure 5.0, Attached). Table 1. Proposed Stream Impacts Stream Impact Impact Type Proposed May 2018 Impact (LF) Proposed June 18, 2019 Impact (LF) Proposed March 23, 2020 Impact (LF) As -Built December 2020 Stream Impact #1 Golf 62 Eliminated - Redesign Eliminated - Redesign Eliminated - Redesign Stream Impact #2 Golf 158 Eliminated - Redesign Eliminated - Redesign Eliminated - Redesign Stream Impact #3 Golf 110 55 Eliminated - Redesign Eliminated - Redesign Stream Impact #4 Golf 106 53 53 92 Stream Impact #4a Golf 0 0 12 20 Stream Impact #5 Road 46 Eliminated - Bridge Eliminated - Bridge Eliminated - Bridge Stream Impact #6 Golf 269 Eliminated -Arch Culvert Eliminated -Arch Culvert Eliminated -Arch Culvert Stream Impact #7 Road 68 68 68 (Phase 2) 59 Stream Impact #8 Road 30 30 30 (phase 2) Eliminated - Redesign Stream Impact #9 Road 11 11 11 (phase 2) 7 Stream Impact #10 Road 66 66 66 (phase 2) 58 Stream Impact #11 Road 55 55 Eliminated - Redesign Eliminated - Redesign Stream Impact #12 Road 45 Eliminated - Bridge Eliminated - Bridge Eliminated - Bridge Stream Impact #13 Road 72 Eliminated - Redesign Eliminated - Redesign Eliminated - Redesign Stream Impact #14 Golf (ATF)* 200 60 60 59 Stream Impact #15 Golf 142 Eliminated - Redesign Eliminated - Redesign Eliminated - Redesign Stream Impact #16 Golf 119 Eliminated - Redesign Eliminated - Redesign Eliminated - Redesign Stream Impact #17 Road 23 23 Eliminated - Redesign Eliminated - Redesign Stream Impact #18 Road 50 Eliminated Bridge Eliminated Bridge Eliminated Bridge Stream Impact #19 Golf 153 75 Eliminated - Redesign Eliminated - Redesign Stream Impact #20 Golf 74 74 25 49 Stream Impact #21 Road 98 75 Eliminated - Redesign Eliminated - Redesign Stream Impact #22 Golf 554 382 210 247 Stream Impact #23 Golf 146 146 146 146 Stream Impact #24 Golf 36 36 Eliminated - Redesign 36 Total Stream Impacts (Golf): 2,129 LF 881 LF 506 649 Total Stream Impacts (Road): 564 LF 373 LF 175 124 Total Stream Impacts 2,693 LF 1,209 LF 681 773 *ATF (after -the -fact) Table 2. Proposed Wetland Impacts Wetland Impact Impact Type Proposed Total Impact May 30, 2018 (AC) Proposed Total Impact June 18, 2019 (AC) Proposed Total Impact March 23, 2020 (AC) As -Built December 2020 Wetland Impact #1 Golf 0.003 0.003 0.003 Eliminated - Redesign Wetland Impact #2 Golf 0.008 0.008 0.008 Eliminated - Redesign Wetland Impact #3 Golf 0.002 Eliminated - Redesign Eliminated - Redesign Eliminated - Redesign Wetland Impact #4 Golf 0.022 Eliminated - Redesign Eliminated - Redesign Eliminated - Redesign Wetland Impact #5 Golf 0.001 Eliminated - Redesign Eliminated - Redesign Eliminated - Redesign Wetland Impact #6 Road 0.005 0.005 0.005 0.005 Wetland Impact #7 Road 0.001 0.001 0.001 Eliminated - Redesign Wetland Impact #8 Road 0.044 0.044 Eliminated - Redesign Eliminated - Redesign Wetland Impact #9 Golf (ATF)* 0.05 0.007 0.007 0.007 Wetland Impact #10 Golf 0.002 Eliminated - Redesign Eliminated - Redesign Eliminated - Redesign Wetland Impact #11 Golf 0.065 0.065 0.065 0.001 Wetland Impact #12 Golf 0.076 Eliminated - Redesign Eliminated - Redesign Eliminated - Redesign Wetland Impact #13 Golf 0.029 Eliminated - Redesign Eliminated - Redesign Eliminated - Redesign Wetland Impact #14 Golf (ATF) 0.073 0.046 0.046 0.041 Wetland Impact #15 Golf (ATF) 0.011 0.011 0.011 0.011 Wetland Impact #16 Golf 0.004 Eliminated - Redesign Eliminated - Redesign Eliminated - Redesign Wetland Impact #17 Road 0.005 0.005 Eliminated - Redesign Eliminated - Redesign Wetland Impact #18 Road 0.006 0.006 0.006 0.006 Wetland Impact #19 Road 0.171 Eliminated - Redesign Eliminated - Redesign Eliminated - Redesign Wetland Impact #20 Golf 0.098 0.098 0.098 0.075 Wetland Impact #21 Golf 0.039 0.039 0.039 0.006 Wetland Impact #22 Golf 0.004 0.004 0.004 0.003 Wetland Impact #23 Golf 0.001 0.001 0.001 0.001 Wetland Impact #24 Golf 0.006 0.006 0.006 0.006 Wetland Impact #25 Golf 0.014 0.014 0.014 0.014 Wetland Impact #26 Golf 0.006 0.006 Eliminated - Redesign 0.006 Wetland Impact #27 Golf 0.002 0.002 Eliminated - Redesign Eliminated - Redesign Wetland Impact #28 Golf 0.012 0.012 Eliminated - Redesign 0.012 Wetland Impact #29 Golf (ATF) 0 0.008 0.008 0.014 Wetland Impact #30 Golf (ATF) 0 0.004 0.004 0.004 Total Wetland Impacts (Golf): 0.528 AC 0.334 AC 0.314 0.201 Total Wetland Impacts (Road): 0.232 AC 0.061 AC 0.012 0..011 Total Wetland Impacts: 0.76 AC 0.395 AC 0.326 0.212 *ATF (after -the -fact) Mitigation Per the Corps January 29, 2020 letter and Applicants February 19, 2020 acknowledgment, all mitigation (wetlands and streams) will be at a 2:1 ratio. As discussed in our pre -application meeting on March 20, 2018 and permit application, the applicant will mitigate for 113 linear feet of previous cumulative stream impacts (2002 NWP 14 - 50 If, 2008 NWP 39 - 3 If, 2009 NWP 29 60 If). The Applicant intends to mitigate for all proposed stream and wetland impacts via payment to the North Carolina Division of Mitigation Services (DMS). As -Built Mitigation update The applicant made payment to the NC DMS for stream and wetland mitigation on April 22, 2020. DMS ID# MR-06901. The applicant proposes to mitigate at a 2:1 ratio for 92 linear feet of stream associated with the after -the fact permit request