HomeMy WebLinkAbout20201809 Ver 1_Pre-Filing Meeting Request_20201124ID#* 20201809 Version* 1
Regional Office* Washington Regional Office - (252) 946-6481
Reviewer List* Robert Tankard
Pre -Filing Meeting Request submitted 11/24/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Patrick Meier
pkmeier@burnsmcd.com
PNG Line 475 Relocation
Piedmont Natural Gas
Wayne
Street Address
4720 Piedmont Row Drive
Address Line 2
aty
Charlotte
Fbstal / Zip Code
28210
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
r- 401 Water Quality Certification - W 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
State / Province / Region
NC
Country
United States
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below. *
Due to a location conflict with a proposed NCDOT road widening
project, PNG proposes to abandon approximately 1.9 miles of the
existing Line 67 pipeline and replace it with approximately 2.48 miles
of new 8-inch steel pipeline. In addition to the pipeline replacement,
The Project will also involve the following:
• The construction of a new receiver/regulator station near the
intersection of North Forest Oak Road and East Ash Street.
• Installation of a new high-pressure distribution pipeline from the
proposed regulator station.
• Upgrade the existing Central Heights Regulator Station.
• Replacement of approximately 200 feet of the existing Line 67 north
of Central Heights Boulevard.
The Project is located southeast of Goldsboro, NC, northeast of
Seymour Johnson Air Force Base (SJAFB), and is accessible from
North State Road (Route 1711, Highway 70 (Hwy 70), Gateway Drive,
and Central Heights Road (Route 1709).
The Project will begin at the Central heights Regulator Station and
proceed to the southeast for approximately 1.04 miles paralleling an
existing Duke Energy / PNG transmission line right-of-way (ROW)
until turning southwest for approximately 0.92 miles where it will cross
Hwy 70. The route will then proceed to the west for approximately
0.52 miles where it will terminate at the proposed Ash Street
Regulator Station. The new distribution pipeline will extend south for
approximately 1,860 feet from the proposed Ash Street Regulator
Station. The pipeline will cross various land use types consisting
primarily of mixed hardwood pine forest, agricultural fields, residential
and commercial areas, and existing maintained utility and NCDOT
ROW. The habitat assessment was conducted within an
approximately 1,190.41 acre area along the proposed Project route.
Please give a couple of dates you are available for a meeting.
12/3/2020
12/4/2020
12/7/2020
12/10/2020
12/11 /2020
Please attach the documentation you would like to have the meeting about.
Line 475 Figures.pdf 381.84KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
` rrtfirr-16 6-1 � r f
Submittal Date 11/24/2020
�yOle
tl .'470
�
rf
,
f HORYR
'lope R
s r
H
'�arrgp
:., k [Kde
s
14*4�1
4r it
lane
u
� `e
Raver+waod
Ana
r
us 13
US 70
WC 111
worms
�ryR
- Cr'7r
Crnlral Nei C+ Tiffanp Gardens
,19
=
$�
ya
co'"`" ss�
p
•ie
Kill
{ r
c
p
r
°
[i ce'" use
q
°
RY
p
l
s$ i'
4. r Eery Asr, Sb
I �rdq PP4� Q. ��6r
% ? ; Green Meadows
Woe n � a
op
r
J {eChf �l
T
s ��' _
Q d16 '
f '
0
u
qa Q� Lis 70
NC III
0 Study Area ` Figure A-1
_-- General Vicinity
1 �N BURNS Line 475
0 1,000 2,000 \\MSDQNNELL. Duke Energy/PNG
Goldsboro, NC
Feet
arce-. Esd; Burns & McDonnell Consultants, Inc.
m 44 N S
Eastern
Wdyne
M d Sch
❑ y
ko
a A .
� II'
J
pr
c S p
0 r,01
yp
r r
v A
g 4 `%
E
N
n
m Greenwood
E Mid kh
E / ■
T
xqs Zlem Sdi
r
All
� Fq`
❑ '1- r.1 �+ a
E P� sji
La
cn � SW
o Y
i
L
yvAit�t. 4Y.
1 � 1
m gyp.
c
y
3
o
n 1il
is -
C
Vt
OD
C
Q lu
Study Area Freshwater Emergent Wetland
c Stream/River ;+ ± Freshwater Forested/Shrub Wetland
CanalDitch Freshwater Pond N BURNS
5 Connector Riverine a 1,000 2,000 [HSDQNN
Figure A-2
NWI, NHDr Topographic Map
Line 475
Duke Energy/PNG
Goldsboro, NC
a
�rce-. Esri; USGS; USFWS Burns & McDonnell Consultants, Inc.