HomeMy WebLinkAbout20201802 Ver 1_Pre-Filing Meeting Request_20201123ID#* 20201802 Version* 1
Regional Office* Washington Regional Office - (252) 946-6481
Reviewer List* Robert Tankard
Pre -Filing Meeting Request submitted 11/23/2020
Contact Name * Brian Rubino
Contact Email Address* brubino@quible.com
Project Name* 986 Cruz Bay Ct
Project Owner* CB 986 LLC
Project County* Currituck
Owner Address: Street Address
PO Box 90
Address Line 2
aty
State / Province / Region
Kill Devil Hills
NC
Fbstal / Zip Code
Country
27948
USA
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Chris Pullinger
Please give a brief project description below.
This Pre -Filing notification is being submitted in conjunction with a
Nationwide 18 application. The subject site is currently undeveloped
uplands and wetlands. Adjacent parcels include single family
residences and undeveloped uplands and wetlands. The proposed
project will consist of filling 0.044 acres of wetlands using dump
trucks, skid steer, and silt fencing to contain the proposed fill. The
proposed fill of 0.044 acres of wetlands is to accommodate a single
family residential development.
Please give a couple of dates you are available for a meeting.
12/1 /2020
12/3/2020
12/4/2020
Please attach the documentation you would like to have the meeting about.
P99006-LOT 32-NAT18.pdf 356.66KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 11/23/2020
PRELIMINARYNOT FORCONSTRUCTION