Loading...
HomeMy WebLinkAbout20201802 Ver 1_Pre-Filing Meeting Request_20201123ID#* 20201802 Version* 1 Regional Office* Washington Regional Office - (252) 946-6481 Reviewer List* Robert Tankard Pre -Filing Meeting Request submitted 11/23/2020 Contact Name * Brian Rubino Contact Email Address* brubino@quible.com Project Name* 986 Cruz Bay Ct Project Owner* CB 986 LLC Project County* Currituck Owner Address: Street Address PO Box 90 Address Line 2 aty State / Province / Region Kill Devil Hills NC Fbstal / Zip Code Country 27948 USA Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Chris Pullinger Please give a brief project description below. This Pre -Filing notification is being submitted in conjunction with a Nationwide 18 application. The subject site is currently undeveloped uplands and wetlands. Adjacent parcels include single family residences and undeveloped uplands and wetlands. The proposed project will consist of filling 0.044 acres of wetlands using dump trucks, skid steer, and silt fencing to contain the proposed fill. The proposed fill of 0.044 acres of wetlands is to accommodate a single family residential development. Please give a couple of dates you are available for a meeting. 12/1 /2020 12/3/2020 12/4/2020 Please attach the documentation you would like to have the meeting about. P99006-LOT 32-NAT18.pdf 356.66KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 11/23/2020 PRELIMINARYNOT FORCONSTRUCTION