Loading...
HomeMy WebLinkAbout20201754 Ver 1_2020-12-21 Sewer Improvements Impact Maps_20201222AUSTIN CREEK SANITARY SEWER IMPROVEMENTS WETLAND AND BUFFER IMPACT MAPS WAKE FOREST, NORTH CAROLINA SHEET INDEX 1 COVER SHEET 2 OVERALL IMPACT MAP 3 IMPACT #1 4 IMPACT #2 5 MPAC7#5�4 I M PACTS RIPRAP RIPRAP JURISDICT. CHANNEL CHANNEL CHANNEL CHANNEL CHANNEL CHANNEL NEW WETLAND BUFFER BUFFER BUFFER IMPACT IMPACT IMPACT IMPACT IMPACT IMPACT IMPACT SHEET NO. IMPACT IMPACT IMPACT IMPACT REASON FOR IMPACT PERM. PERM TEMP. PERM. PERM TEMP. NO. PERM. ZONE 1(SF) ZONE 2 (SF) TOTAL (SF) (AC) NO -LOSS (AC) (LF) NO -LOSS (LF) (AC) (AC) (LF) 1 3 307 4167 4474 SEWER OUTFALL 2 4 0.001 23 2825 12160 14985 SEWER OUTFALL 3 5 0.026 0.004 15 909 1138 2047 SEWER OUTFALL 4 5 0.014 SEWER OUTFALL TOTALS 0.040 0.005 38 4041 17465 21506 PLANS PREPARED BY: PRIEST, CRAVEN & ASSOCIATES, INC. PLANNERS / LANDSCAPE DESIGNERS / SURVEYORS / ENGINEERS 3803 - B COMPUTER DRIVE, SUITE 104, RALEIGH, N.C. 27609 VERTICAL DATUM - NAVEW PHONE 919 / 781-0300 FAX 919 / 782-1288 HORIZONTAL DATUM - NAD83 EMAIL PCA@PRIESTCRAVEN.COM FIRM#: C-0488 C S� O VION17Y Map 1''=2000' REVISIONS: SHEET # 2. 5. 4. 1 OF 5 5 =ALAND PROJECT3\2016-002.004 AVERETTE - WAKE FORESTVDRAWINGS\—=-EETVIMPAOTS\SEWER OLTFALLA IMPAOTS.DWO , Dec 21, 2020 - 5:00 PM , BWILL LEGEND WETLANDS BUFFER IMPAGT WITHIN EXISTING CLEARED 7� SEWER EASEMENT IN ZONE 2 BUFFER IMPAGT WITHIN EXISTING CLEARED SEWER EASEMENT IN ZONE 1 TEMPORARY IMPACTS TO JURISDICTIONAL WETLANDS IN EXISTING CLEARED SEWER EASEMENTS SANITARY SEWER PIPE REPLACEMENT LOCATIONS JURISDICTIONAL STREAM TEMPORARY IMPAGT TEMPORARY STREAM IMPAGT 250 /PERENNIAL STREAM GRAPHIG SCALE 1" = 500, MPACT 1 WAIT AVENI ��/M�� - • A ♦ �� �.�► ♦ �o i� LEGEND WETLANDS BUFFER IMPAGT WITHIN EXISTING GLEARED SEWER EASEMENT IN ZONE 2 BUFFER IMPAGT WITHIN EXISTING GLEARED SEWER EASEMENT IN ZONE 1 TEMPORARY IMPACTS TO JURISDICTIONAL WETLANDS IN EXISTING GLEARED SEWER EASEMENTS SANITARY SEWER PIPE REPLAGEMENT LOCATIONS JURISDICTIONAL STREAM TEMPORARY IMPAGT lill Hill TEMPORARY STREAM IMPAGTAREA i fl ZONE 2 BUFFER IMPAGT WITHIN EXISTING GLEARED SEWER EASEMENT: 2,1-74 SF I � J yK IMPACT ct O Z ZONE 2 BUFFER IMPAGT WITHIN EXISTING GLEARED / SEWER EASEMENT: 1,993 SF I / _ ZONE 1 BUFFER IMPAGT WITHIN EXISTING GLEARED -GREEN MpUNTP` SEWER EASEMENT: 30-7 SF .. .. . . .. .. GRAPHIG SCALE ki LEGEND -uWlc -uWlc -uWlc WETLANDS �11 EARTH FILL COVERED BY LARGE ANGULAR ROCK COARSE AGGREGATE BUFFER IMPACT WITHIN EXISTING CLEARED oo o oTO T-i oo�o 0 SEWER EASEMENT IN ZONE 2 COARSE AGGREGATE O ° ° ° ° °° a °o°oo ° °o°o° ° o ° ° ° °O 0 ° 1/2 DIAMETER OF PIPE 6" DEEP EARTH FILL COVERED BY o O Oo Oo °O o o O ° 0 0 °O ° O O PO 0BUFFER IMPACT WITHIN EXISTING CLEARED OR12°WHICHEVER IS LARGE ANGULAR ROCK O ° 0° 0 0 ° o O ° o°°O o o O 0 ° o SEWER EASEMENT IN ZONE 1 GREATER °oo °o a o° o°° Ooo°a ° 0 o °° O 00 O a o 0 O1 00 0 0 000 0 0 00 0° Q o0 0 0 0 0 0 o O ° o o TEMPORARY IMPACTS TO JURISDICTIONAL WETLANDS FILTER FABRIC 0 o 0 0 0 0 0 0 0 0 o O ° O o ° '� 0000 0 0o ° p0 O o00 00°O O 0° O 00 0 0000 IN EXISTING CLEARED SEWER EASEMENTS ° 0 0 p o 0 o p° ° a o 0 0 0 o a o p° 0 o0 0oc), ° 0 °.0 00 00 O Oo 0 0 O o 0 0 SANITARY SEWER PIPE REPLACEMENT LOCATIONS - O o 0° o O o 0 0° ° O o O ° o° ° p O °0 00 ° O ° 0.00.0°po00 oOO p° �0o O0. JURISDICTIONAL STREAM TEMPORARY IMPACT ! ,. PERMANENT - NO LOSS STREAM IMPACT AREA CAPACITY OF PIPE CULVERTS TOGETHER = BANK FULL FLOW 25 STREAM CHANNEL 25 MINIMUM MINIMUM TOP OF BANK TOP OF BANK ELEVATION PLAN STANDARD TEMPORARY STREAM CROSSING gyp,\Ni � Z .01 ZONE 2 BUFFER Ir'IPACT WITHIN EXISTING CLEAREDcy- SEWER EASEMENT: 191 SF17- _ ZONE 2 BUFFER IMPACT / I I ' WITHIN EXISTING CLEARED SEWER EASEMENT: 2,214 BUFFERED . SF / \ . �. — STREAM ZONE 1 BUFFER IMPACT / \ / 1 WITHIN EXISTING CLEARED SEWER EASEMENT: & 75 SF EARTHEN GOFFERDAM INSET / AFTER THE REMOVAL OF THE COFFERDAr'I AND TEMPORARY STREAM GROSSING, THE STREAM WILL BE RESTORED TO EXISTING CONDITIONS. CONSTRUCTION TO BE PERFORMED IN THE DRY. / ZONE 2 BUFFER IMPACT I I \ / WITHIN EXISTING CLEARED TEMP ZONE 1 BUFFER SEWER EASEMENT: 1,205 SF I / STREAM DOWN \ / , IMPACT WITHIN f �: / GROSSING STREAM \ _ i EXISTING CLEARED ZONE 2 BUFFER IMPACT r-j I I l SEWER EASEMENT: WITHIN EXISTING CLEARED 25' LF OF TEMPORARY 2,150 SF SEWER EASEMENT: 5,5& 7 SF STREAM IMPACT WITHIN 1 I I I I EXISTING CLEARED SEWER ZONE 2 BUFFER IMPACT SEE INSET THIS PAGE / EASEMENT FOR TEMP WITHIN EXISTING CLEARED RIPRAP GROSSING I lEd SEWER EASEMENT: 4,&50 SF � / 1 \ EARTHEN \ \ COFFER M \ I STREAM M PACT #2 200 �o0 50 0 111!"�o0 30o TEMP STREAM IMPACT WITHIN DEWATERING EXISTING CLEARED SEWER PUMP IIIIIIIIIIIIIIIIIIIIN EASEMENT: 0.001 AG (75 SF) GRAPHIG SCALE 1" = 100' LEGEND WETLANDS BUFFER Ir'IPACT WITHIN EXISTING CLEARED SEWER EASEMENT IN ZONE 2 BUFFER Ir'IPACT WITHIN EXISTING CLEARED SEWER EASEMENT IN ZONE 1 TEMPORARY IMPACTS TO JURISDICTIONAL WETLANDS IN EXISTING CLEARED SEWER EASEMENTS SANITARY SEWER PIPE REPLAGEMENT LOCATIONS JURISDICTIONAL STREAM TEMPORARY Ir'PACT TEMPORARY STREAM Ir'IPACT -THIS SECTION OF PIPE TO BE REPLACED. ALL OTHER IMPACTS ARE FOR TEMPORARY AGGESS. r / I � I I � � I -ZONE 2 BUFFER IMPACT WITHIN EXISTING CLEARED SEWER EASEMENT: 819 SF 11L COARSE AGGREGATE FLOW EARTH FILL COVERED BY LARGE ANGULAR ROCK 0 00 0 �o 0 0 � o 0 COARSE AGGREGATE 0° O °°° 0 0° � 1/2 DIAMETER OF PIPE EARTH FILL COVERED BY o O O° co 0 °O °O °o O° o 0O 00 0 ° ° ° Op p Co) 0 0 0 0 0° °O o 0 ° O C? ° ° O 6" DEEP op00 o 12" LARGE ANGULAR ROCK O 0 0 0 o O o o 0 O 0 O O 0 O OR WHICHEVER IS GREATER o°O Oo ° O o_ ° 0 0 o p o. 00 pO o 00 o O o 00 0 0 O p O o 0 0 �o O O p O C° 0° 00 0 0 Oo 0 a Oo00 0 0 p p 0 1 O° 00 O 0 ' '• 0 FILTER FABRIC Q o o a °0 o OO O p° O 0 04 p O O Oo p 0 p 0 ° 0 o O O 0 O o O p o 0 0 0 O o 00 00O 00 O°° 0 0 ° 000000 O o Oo.000 o. 0 0 0 p 0 00 p ° ° O 0 p° 0°p °00 ° Q 0 0 p 0° o — a O o O 0 0 ° O ° O. 0 O ° O o 00 _ O° O 00 ° 00 o° P°o o O° o po O o o °oa0° O O o QO o o 00 O 0p op o O bQ° a° °o _ °° a°o o� ° o ° °o 0 o° 0 °o 8�00 CAPACITY OF PIPE CULVERTS II — TOGETHER = BANK FULL FLOW 25 STREAM CHANNEL 25 MINIMUM MINIMUM TOP OF BANK TOP OF BANK ELEVATION PLAN STANDARD TEMPORARY STREAM CROSSING lw 15' LF OF TEMPORARY I AGGESS TO I / I STREAM Ir'IPACT WITHIN BOARDWALK UNIMPROVED / RIGHT-OF-WAY FOR MAIN EXISTING CLEARED SEWER DIVIDE DRIVE / EASEMENT FOR TEMP DIVE RIPRAP GROSSING I I ,I ZONE 2 BUFFER IMPAGT I I I I CONTRACTOR TO USE o WITHIN EXISTING CLEARED EXISTING 10' WIDE I I I SEWER EASEMENT: 319 SF ' MAINTENANCE GORRIDOR V/ TEMPORARY IMPACT TO � Ma I I I' FOR ACCESS / /a WETLAND FOR ACCESS TO UPSTREAM MANHOLE FOR PUMP AROUND DURING PIPE DL REPLACEMENT SEWER EASEMENT ( WETLAND IMPACT: r sl= IL TEMPORARY SEWER I � 0.014 AG EASEMENT WETLAND IMPAGT WITHIN EXISTING CLEARED 11L s SEWER EASEMENT: 0.026 AG / AGGESS TO CONTRACTOR TO USE \ o AUSTIN RIDGE —ZONE 1 BUFFER IMPACT EXISTING CLEARED / c`` PARKWAY WITHIN EXISTING CLEARED MAINTENANCE GORRIDOR SEWER EASEMENT: 458 SF FOR AGGESS. GORRIDOR IS o —TEMP STREAM IMPACT WITHIN APPROXIMATELY 15' BASED EXISTING CLEARED SEWER ON FIELD OBSERVATION. �\ EASEMENT: 0.004 AG ZONE 1 BUFFER IMPACT WITHIN \ / EXISTING CLEARED SEWER EASEMENT: 451 SF M PACT #3 100 50 25 0 50 150 I M PACT #4 GRAPHIG SCALE 1" - 50,