Loading...
HomeMy WebLinkAbout20181249 Ver 5_Modification Request Attachment_20201223 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J. ERIC BOYETTE GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION TURNPIKE AUTHORITY 1578 MAIL SERVICE CENTER RALEIGH, NC 27699-1578 Telephone: (919) 707-2700 Fax: (919) 715-5511 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 1 SOUTH WILMINGTON STREET RALEIGH, NC 27601 December 15, 2020 U.S. Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 ATTN: Mr. Eric Alsmeyer, NCDOT Regulatory Coordinator Subject: Request for Modification to the Phased Section 404 Individual Permit and Section 401 Individual Water Quality Certification, Neuse River Riparian Buffer Authorization, Non- 404 Jurisdictional Wetlands and Waters Permit for the Construction of the Triangle Expressway Southeast Extension from NC-55 Bypass in Apex to I-40, Wake and Johnston Counties. TIP Nos. R-2721, R-2828, and R-2829. Debit $570 from WBS 37673.1.TA1. Reference: USACE Section 404 Authorization SAW-2009-02240, issued October 24, 2019, modified February 4, 2020, corrected February 7, 2020, modified March 30, 2020 and issued April 29, 2020. NCDWR Water Quality Certification Number 4179 and Neuse River Riparian Buffer Authorization, issued February 15, 2019, modified January 21, 2020, corrected January 30, 2020, modified March 30, 2020 and April 20, 2020 and issued April 23,2020, modified May 11, 2020 and issued June 1, 2020 (20181249 version 4). Dear Sir: The North Carolina Department of Transportation (NCDOT) applied for a phased Section 404 Individual Permit, Section 401 Individual Water Quality Certification (WQC), Neuse River Riparian Buffer Authorization, Non-404 Jurisdictional Wetlands and Waters Permit for the subject project in September 2018. The project, also known as Complete 540, encompasses three NCDOT Transportation Improvement Plan (TIP) projects: R-2721 (NC55 Bypass to US-401), R-2828 (east of US-401 to I-40 Interchange) and R-2829 (east of I-40 to US 64/264). Revised permit applications were submitted in February 2019 and the NCDWR 401 and USACE 404 Permits were issued in February and October of 2019. Additionally, NCDOT received a modified 401 WQC for the Complete 540 Project on January 30, 2020, April 23, 2020, and June 1, 2020 from the NC Division of Water Resources (NCDWR) and a revised Department of the Army authorization #SAW-2009-02240 on February 7, 2020 and April 29, 2020. During the final design of the bridges at Permit Site 7 on the R-2721B Section, the Design-Build Team changed the span arrangement of the mainline bridge from a five span bridge to a three span bridge as well as the ramp bridge from a five span bridge to a three span bridge. By incorporating these changes there is a decrease in permanent fill impact by 0.08 acre related to the bridge bents. Also, during this process the contractor realized that they would need to have additional temporary impacts in order to build the ramp bridge. The site does not provide enough room for them to move and place their cranes at the locations required within the currently permitted footprint. To the north side of the ramp bridge they will need an additional 0.10 acre of temporary impact beyond what was previously permitted as hand clearing. The area is now shown as temporary impact due to the need for either a causeway or crane mats. Where possible the contractor would utilize crane mats but this is likely not possible for the entire area shown as temporary impact. If a causeway or rock placement for leveling the crane mats is required, then the contractor will have geotextile fabric placed prior to rock being installed in order to maintain a barrier between the original ground and fill material. This will aid in removal of the rock. Similar to the ramp bridge, the mainline bridge was evaluated for construction and the types of impacts have changed location. The site was previously permitted with a causeway with a number of fingers. The contractor has realized the fingers would not be necessary; however, temporary impacts would be needed at different locations to accommodate the cranes and causeway. Temporary impacts are now illustrated down the center of the alignment, to the outside of the bridge, and along the bridge abutments in order to have room for movement of the cranes. As stated above, the contractor will utilize crane mats where possible. Mechanized clearing was able to be reduced slightly. Please note that mechanized clearing is illustrated on the plans but this area would also be potentially impacted temporarily with the causeway or crane mats. It was shown as mechanized clearing due to the mitigation requirement for mechanized clearing as opposed to temporary impacts. Due to the types of impacts changing location, there will be an increase in temporary impacts of 0.28 acre which is a change from 0.46 acre to 0.74 acre. There will be a decrease in the hand clearing impacts by 0.09 acre which is a change from 0.55 acre to 0.46 acre. There is a decrease in mechanized clearing of 0.01 acre which is a change from 0.03 acre to 0.02 acre. There is also a decrease in permanent impacts by 0.08 acre for the bridge bents which is a change from 0.20 acres to 0.12 acres of permanent fill. There is an increase in total impacts at Permit Site 7 by 0.10 acre due to temporary fill impacts replacing hand clearing, at the request of the USACE, but a decrease in overall project impacts. Please see the enclosed revised permit drawings and updated impact summary sheets which reflect the changes in impacts. Revised Impacts Summary R-2721B Only the jurisdictional wetland impacts have changed in this modification request. The proposed impacts to jurisdictional wetlands total 12.45 acres of permanent riparian wetland impacts. There will also be 1.343 acres of temporary wetland impact. This modification request results in changes to Tables 3, 12, and 24 of the previous permit application/modifications. No changes to the other tables were required so they are not included in this modification request. Revised Table 3. R-2721B Jurisdictional Resources Impacts Bolded impact amounts represent a change from the 404 (SAE-2009-02240) issued on February 7, 2020 (modified April 29, 2020) and 401 WQC (4179) issued January 30, 2020 (modified April 23, 2020 and June 1, 2020). Impact Type Riparian Wetland Temp./ Perm. (ac) Non- Riparian Wetland Temp./ Perm. (ac) Isolated Wetlands (ac) Ponds (ac) Isolated Ponds (ac) Stream (lf) Riparian Buffer (sq. ft.) Zone 1/2 Perm. Temp. Bank Stab. / Culvert Stab. Neuse River Basin (HUC 03020201) 1.34/ 12.45 0.0 2.42 14.04 1.52 8,898 555 282/ 839 777,724/ 466,623 Revised Table 12. R-2721B Wetland Impacts Permit Drawing Site Number NRTR Label Impact Type Wetland Type Permanent Impacts (ac.) Temporary Impacts (ac.) 1 WAR Fill Riparian 0.05 1 WAR Mechanized Clearing Riparian 0.01 1 WAS Fill Riparian 1.37 1 WAS Excavation Riparian <0.01 1 WAS Mechanized Clearing Riparian 0.11 2 WAW(1) Fill Riparian 0.86 2 WAW (1) Mechanized Clearing Riparian 0.15 2 WAW (1) Excavation Riparian 0.007** 4 WAX Fill Riparian 0.14 4 WAX Excavation Riparian 0.01 4 WAX Mechanized Clearing Riparian 0.02 4 WAY Fill Riparian 0.05 4 WAY Mechanized Clearing Riparian 0.02 5 WBC Fill Riparian 1.04 5 WBC Mechanized Clearing Riparian 0.26 5 WBC Excavation Riparian 0.03** 6 WBE Fill Riparian 0.49 6 WBE Excavation Riparian 0.07 0.003** 6 WBE Mechanized Clearing Riparian 0.03 7 WBF Fill Riparian 0.12 7 WBF Mechanized Clearing Riparian 0.02 7 WBF Temporary Causeway Riparian 0.74 7 WBF Hand Clearing Riparian 0.46 8 WBG Fill Riparian 0.23 8 WBG Excavation Riparian <0.01 8 WBG Mechanized Clearing Riparian 0.03 8 WBG Temporary Diversion Riparian <0.01 9 WBH Fill Riparian 0.06 9 WBH Excavation Riparian <0.01 0.006** 9 WBH Mechanized Clearing Riparian 0.26 12 WBI Fill Riparian 0.86 12 WBI Excavation Riparian 0.04 12 WBI Mechanized Clearing Riparian 0.17 14 WBN (1) Fill Riparian 0.31 14 WBN (1) Excavation Riparian 0.06 0.007** 14 WBN (1) Mechanized Clearing Riparian 0.09 14 WBN (1) Temporary Diversion Riparian 0 16 WBN (2) Fill Riparian 0.74 16 WBN (2) Excavation Riparian 0.03 16 WBN (2) Mechanized Clearing Riparian 0.37 17 WBP Fill Riparian 0.42 17 WBP Mechanized Clearing Riparian 0.09 17 WBP Temporary Diversion Riparian 0 17 WBQ Fill Riparian 0.02 17 WBQ Mechanized Clearing Riparian 0.01 17 WBS Fill Riparian 0.04 Revised Table 12. R-2721B Wetland Impacts (cont.) Permit Drawing Site Number NRTR Label Impact Type Wetland Type Permanent Impacts (ac.) Temporary Impacts (ac.) 18 WBR Fill Riparian 0.18 20 WBY Fill Riparian 0.62 20 WBY Excavation Riparian 2.25 20 WBY Mechanized Clearing Riparian 0.05 21 WBZ Fill Riparian 0.40 21 WBZ Mechanized Clearing Riparian 0.09 22 WCB Fill Riparian 0.14 22 WCB Excavation Riparian <0.01 25 WBW Fill Riparian 0.03 26 Mechanized Clearing Non Riparian 0 1* WAS Temporary Fill Riparian 0.04 1* WAS Mechanized Clearing Riparian 0.01 2* WAW Temporary Fill Riparian 0.05 Total Riparian Impacts: 12.45 1.343 *Impacts associated with the Town of Cary sewer relocation. **Impacts are also accounted for in mechanized clearing impacts. Bolded impact amounts represent a change from the 404 (SAE-2009-02240) issued on February 7, 2020 (modified April 29, 2020) and 401 WQC (4179) issued January 30, 2020 (modified April 23, 2020 and June 1, 2020). Revised Table 24. R-2721B Proposed Compensatory Mitigation Mitigation Type Riparian Wetland (ac) Non- Riparian Wetland (ac) Isolated Wetlands (ac) Stream (lf) Riparian Buffer Calculation (sq. ft.) Riparian Buffer Total (sq. ft.) Zone 1 Zone 2 Neuse River Basin (HUC 03020201) 24.90 0.0 1.95 7,982 557,272x 3.0 = 1,671,816 373,750 x 1.5 = 560,625 2,232,441 Bolded mitigation amounts represent a change from the original issued 404 (SAW-2009-02240)/401 WQC (4179) and subsequent modifications/revisions. Currently NCDOT has acquired mitigation for R-2721B from NCDMS to compensate for 14.64 acres of wetland impacts. The mitigation amount required for this modification, after the changes addressed above, is 12.45 acres which is below the mitigation acquired by 2.19 acres. Therefore, no other changes to the required mitigation are necessary due to this modification request. REGULATORY APPROVALS Section 404: We are requesting a modification to the USACE Permit Number SAW-2009-02240 Section 404 Individual Permit for the above-described activities. Section 401: We are requesting a modification to the WQC Permit Number 4179 Section 401 Individual Water Quality Certification, Neuse Riparian Buffer Authorization, and Non-404 Jurisdictional Wetlands and Waters Permit (IWGP10000) from NCDWR. We are providing this application to NCDEQ, for their approval. Authorization to debit the $570.00 Permit Modification Fee from TIP No. R-2721/WBS 37673.1.TA1 is hereby given. The individual permit modification package for the Complete 540 project (STIP Projects R-2721, R-2828 and R-2829) is available at https://xfer.services.ncdot.gov/pdea/PermApps/ Thank you for your assistance with this project. If you have any questions or need additional information, please contact Deanna Riffey at driffey@ncdot.gov or 919-707-6151. Sincerely, Rodger Rochelle, P.E. North Carolina Turnpike Authority Chief Engineer cc: NCDOT Permit Application Standard Distribution List v 10' CONC10' CONC12' CONC9' GR12 ' CONC 15" RCP60" CHL 72" WD 15" RCP15" RCP11' CONC 18' GR 72" WD 11' CONC15" RCP11' GR 12' GR 19' BST 19' BST 19' BST 19' BST 19' BST 19' BST 12' BST72" WD60" IRON60" WR OUGHT IR ON48" WD POOLPOOL POOLPOOL11' SOIL 10' GR13' GR13' CONC 72" WD72" WD11' CONC13' CONC48" WDW FLAGLT LT LT W W W W 72" WDCONC 18" RCP15" RCP 15" RCP 15" RCP15" RCP 15" RCP 18" RCP 15" RCP 15" RCP 15" RCP 18" RCP 15" RCP 15" RCP 15" RCPGRGR SR 3767 OXFORD GREEN DR 18' BST BLUE HORIZON DR 20' BSTBLUE HORIZON DR 18' BST-EY9--EY9D--EY10A--EY10A-11.5' BSTSR 1386 BELLS LAKE RD 21' BSTEIP EIP EIP EIP EIP EIPEIP EIPEIP EIP EIP EXI STI NG R/WEXISTING R/W EXISTING R/W 60.00'60.00' EXISTING R/W EXISTING R/WEXISTING R/WEXISTING R/WEXISTING R/WEXISTING R/W EXISTING R/WEXISTING R/W 72" CMP18" CMP18" RCP18" CMP 3 6 " RCP24" PVC6 " P VC377 380 441 442 443 444 445 446 477 555 556 557 558 559 560 561 T T C T T C C TC C T T TC C CT C C C C C TIME WARNER CABLE TIME WARNER CABLE 123 124 128 119 120 122 121 117 113 115 118 111 112 130 110 107 116 116 107 130 116 20' BST SR 3767 OXFORD GREEN DR 114 127330335 340345350355253015 20152025 30 -Y8RPC- CS Sta. 23+74.68 -Y8RPC- SRS Sta. 25+98.68 -Y8RPC- SC Sta. 27+98.68 -Y8LPC- CS Sta. 17+55.38 -Y8LPC- SC Sta. 12+40.00 -Y8LPA- CS Sta. 18+41.02 -Y8LPA- ST Sta. 20+81.02 -Y8LPA- SC Sta. 13+40.00 -Y8LPA- SRS Sta. 11+00.00 -L- CS Sta. 340+83.16 -L- ST Sta. 342+83.16 -Y8- PT Sta. 25+67.47 15202530-Y8RPA- PT Sta. 30+79.59 -Y8RPA- SC Sta. 28+59.45 -Y8RPA- SRS Sta. 26+59.45 -Y8RPA- CS Sta. 24+59.45 -Y8RPA- SC Sta. 18+14.22 -Y8RPA- TS Sta. 16+14.22 -Y8- POC Sta. 25+23.20 -Y8RPC- POT Sta. 33+15.81 = -Y8- POC Sta. 25+50.70 -Y8LPC- POT Sta. 21+59.14 = -Y8- POC Sta. 36+28.77 -Y8RPA- POT Sta. 32+43.96 = -Y8- POC Sta. 36+01.16 -Y8LPA- POT Sta. 21+84.48 = -L- POC Sta. 337+43.35, 71.0' LT -Y8LPA- ST Sta. 10+00.00 = -L- POC Sta. 336+87.43, 71.0' RT -Y8LPC- ST Sta. 10+00.00 = -L- STA. 338+11.04 -Y8- STA. 30+60.45 = A C30 -Y8LPC- ST Sta. 19+95.38 -MUPBL- PT Sta. 26+14.04 -MUPBL- PC Sta. 25+88.02 25-Y8RPC- PT Sta. 30+88.84 -Y8LPC- POC Sta. 19+98.09 -MUPBL- POT Sta. 18+46.87 = -MUPBL- PT Sta. 17+16.10 -MUPBL- PC Sta. 20+99.18 -Y8RPC- POT Sta. 31+54.71 -MUPBL- POT Sta. 18+19.37 = -MUPBL- PRC Sta. 21+92.54 -MUPBL- PT Sta. 22+85.70-MUPBL- PT Sta. 29+80.19 -MUPBL- PC Sta. 29+66.41 -MUPBL- POT Sta. 16+42.41 -MUPBL_SW1- POT STA 10+00.00 = -MUPBL- PC Sta. 25+65.36 -L- POC Sta. 337+60.67 -MUPBL- POT Sta. 24+23.21 = -MUPBL- PRC Sta. 21+92.54-MUPBL- PRC Sta. 21+92.54 -MUPBL_SW2- POT Sta. 10+00.00 1520550'R 2610'R 7980'R 7990'R 700'R 5930'R C F F C C CF C C C C F F F F F F C C F F F C F F C C F F C C C C F F F F F F F CF F F F F F F F F F C C C C F F C C C F F F C F F C F F C CF C F F F C C F F C C F F F C F F F F C C C F CF F F F F F F F C C F C C CC C F F F F C F F C C C F C C C F C C C C C C F F F F WE=386.45' PE SAS SAS WBE WBF WBF 27 4 -L- STA 329+00.00MATCHLINE SHEET 2728 -Y8- STA 38+00.00MATCHLINE SHEET 56 -Y8- STA 23+00.00 MATCHLINE SHEET 55 -L- STA 355+00.00MATCHLINE SHEET 29-Y8RPA- STA 15+00.00-Y8RPC- STA 25+00.00MATCHLINE SHEET 2712/8/2020...\R2721_PSH_28_20wet.dgn$$$$USERNAME$$$$HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALE 0'200'200' TS S S HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 R-2721 R-2721B ROADWAY SHEET NO. 11 LEGEND F6/2/99SHEET 20 OF 69 PERMIT DRAWING LAST REVISED ON 12/08/20 PERMIT DRAWING PACKAGE FOR DETOUR EASEMENT NEEDED CHORDCHORDCHORDCHORDCHORD CHORD CHORD BELLS LAKEBELLS LAKEBELLS LAKECAUSEWAYS TEMPORARY T T WETLAND DENOTES FILL INFF SURFACE WATER DENOTES IMPACTS IN CLEARING DENOTES MECHANIZED* * * * ** * ** * * IN WETLAND DENOTES EXCAVATION S S TS TS E EIMPACTS IN SURFACE WATER DENOTES TEMPORARY HC HC CLEARING DENOTES HAND FILL IN WETLAND DENOTES TEMPORARY24" RCP-III18" RCP-IV5 SY GEOTEXTILE EST 1 TON CLASS 'B' RIP RAP 7 SY GEOTEXTILE EST 2 TON CLASS 'B' RIP RAP FS FS FS 5 SY GEOTEXTILE EST 1 TON CLASS 'B' RIP RAP 5 SY GEOTEXTILE EST 1 TON CLASS 'B' RIP RAP 5 SY GEOTEXTILE EST 1 TON CLASS 'B' RIP RAP 7 SY GEOTEXTILE EST 2 TON CLASS 'B' RIP RAP CB CB CB 24" RCP-III RCP-IV15" 15" R C P-IV 15" RCP-IV 15" RCP-III 15" RCP- I V15" RCP- I V15" RCP-IV15" RCP-IV15" RCP-I V15" RCP-IV 15" RCP-IV RCP-IV15" 15" RCP-IIICB CB CB CB CB 7 SY GEOTEXTILE EST 2 TON CLASS 'B' RIP RAP EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEOTEXTILE15" RCP-IV15" RCP-III15" RCP-III18" RCP-IIIRC P-III24" 5 SY GEOTEXTILE EST 1 TON CLASS 'B' RIP RAP EST. 5 TONS CLASS 'B' RIP RAP 14 SY GEOTEXTILE FS FS FS FS FS REMOVE REMOVE REMOVE REMOVE DETAIL 11-08 SEE SHEET 2D-1 LATERAL 2' BASE DITCH DETAIL 11-05 SEE SHEET 2D-1 LATERAL 'V' DITCH SEE DETAIL 05-01 TOE PROTECTION DETAIL 11-04 SEE SHEET 2D-1 BERM DITCH DETAIL 11-06 SEE SHEET 2D-1 BERM 2' BASE DITCH DETAIL 11-07 SEE SHEET 2D-1 LATERAL 6' BASE DITCH RCBC 1@7'x8' 14 SY GEOTEXTILE EST 5 TON CLASS 'B' RIP RAP DETAIL 11-11A SEE SHEET 2D-1 W/HINGE SPECIAL CUT DITCH DETAIL 11-11B SEE SHEET 2D-1 DITCH LATERAL 2' BASE 7 SY GEOTEXTILE EST 2 TON CLASS 'B' RIP RAP DETAIL 11-09B SEE SHEET 2D-1 BERM BASE DITCH DETAIL 11-10B SEE SHEET 2D-1 SPECIAL CUT DITCH EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEOTEXTILE REMOVE REMOVEREMOVEREMOVEREMOVE RCP- I I I18" EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEOTEXTILE RCP-III18" W/ FG 2GI DETAIL 11-10A SEE SHEET 2D-1 DITCH LATERAL 2' BASE DETAIL 12-01 SEE SHEET 2D-1 STANDARD 4' BASE DITCH 358 SY GEOTEXTILE EST 290 TONS CLASS 'II' RIP RAP 358 SY GEOTEXTILE EST 290 TONS CLASS 'II' RIP RAP 175 SY GEOTEXTILE EST 150 TONS CLASS 'II' RIP RAP DETAIL 25-01 SEE SHEET 2D-2 SPECIAL CUT DITCH DETAIL 24-01 SEE SHEET 2D-2 SPECIAL CUT DITCH SHEET 2D-2 DETAIL 'EDB-01', ENERGY DISSIPATOR BASIN #4 RCP-III15" 15" RCP-IV DETAIL 11-01 SEE SHEET 2D-1 132 SY GEOTEXTILE EST 47 TONS W/ CLASS 'B' RIP RAP LATERAL 2' BASE DITCH DETAIL 11-09A SEE SHEET 2D-1 266 SY GEOTEXTILE EST 97 TONS W/ CLASS 'B' RIP RAP LATERAL 4' BASE DITCH DETAIL 11-09B SEE SHEET 2D-1 417 SY GEOTEXTILE EST 153 TONS W/ CLASS 'B' RIP RAP BERM BASE DITCH DETAIL 11-02 SEE SHEET 2D-1 1172 SY GEOTEXTILE EST 957 TONS W/CLASS 'I' RIP RAP LATERAL BASE DITCH DETAIL 11-03B SEE SHEET 2D-1 140 SY GEOTEXTILE EST 75 TONS W/ CLASS 'I' RIP RAP STANDARD 2' BASE DITCH DETAIL 11-03B SEE SHEET 2D-1 80 SY GEOTEXTILE EST 45 TONS W/ CLASS 'I' RIP RAP STANDARD 2' BASE DITCH DETAIL 11-03A SEE SHEET 2D-1 880 SY GEOTEXTILE EST 565 TONS W/ CLASS 'I' RIP RAP 7' BASE CHANNEL DETAIL 11-01 SEE SHEET 2D-1 247 SY GEOTEXTILE EST 192 TONS W/ CLASS 'I' RIP RAP LATERAL 2' BASE DITCH DETAIL 11-01 SEE SHEET 2D-1 218 SY GEOTEXTILE EST 77 TONS W/ CLASS 'B' RIP RAP LATERAL 2' BASE DITCH DETAIL 11-11A SEE SHEET 2D-1 SPECIAL CUT DITCH 242 SY GEOTEXTILE EST 180 TONS CLASS 'II' RIP RAP RCP-IV 15" FS RCP-III 15" EST. 5 TONS CLASS 'B' RIP RAP 14 SY GEOTEXTILE DETAIL AA SEE SHEET 2D-2 50 SY GEOTEXTILE EST 50 TONS ON BANKS ONLY CLASS 'II' RIP RAP 22 SY GEOTEXTILE EST 15 TONS STREAM BED EMBEDDED INTO CLASS 'I' RIP RAP STREAM STABILIZATION SEE SHEET 2D-2, DETAIL AA EST 53 TONS, 54 SY GEOTEXTILE CLASS 'II' RIP RAP ON BANKS ONLY EST 20 TONS, 28 SY GEOTEXTILE EMBEDDED INTO STREAM BED CLASS 'I' RIP RAP STREAM STABILIZATION DETAIL AA SEE SHEET 2D-2 50 SY GEOTEXTILE EST 59 TONS ON BANKS ONLY CLASS 'II' RIP RAP 26 SY GEOTEXTILE EST 18 TONS STREAM BED EMBEDDED INTO CLASS 'I' RIP RAP STREAM STABILIZATION DETAIL AA SEE SHEET 2D-2 50 SY GEOTEXTILE EST 48 TONS ON BANKS ONLY CLASS 'II' RIP RAP 28 SY GEOTEXTILE EST 20 TONS STREAM BED EMBEDDED INTO CLASS 'I' RIP RAP STREAM STABILIZATION 15" 15" 18" 15" 15" 15" 18" 18" 18" 24"24"18" 15" W/ELBOWSCSP 15" W/ELBOWS CSP 15" W/ELBOWS 15" CSP 15" RCP-III18" RCP-IIIFS RCBC 1@7'x8' W/ELBOWS 15" CSP W/ELBOWS 15" CSP W/ELBOWS 15" CSP V10=2.12 FPS Q10=14.43 CFS V2=1.95 FPS Q2=11.3 CFSRCP-III24"2GI 2GI15"15" RCP- I I I 10 SY GEOTEXTILE EST 3 TON CLASS 'B' RIP RAP 18"15" RCP-IV RCBC 12'x12'15"15" 15" 7 SY GEOTEXTILE EST 2 TON CLASS 'B' RIP RAP 7 SY GEOTEXTILE EST 2 TON CLASS 'B' RIP RAP DETAIL 11-06 SEE SHEET 2D-1 BERM BASE DITCH DETAIL 11-10A SEE SHEET 2D-1 DITCH LATERAL 2' BASE DETAIL 11-12 SEE SHEET 2D-1 DITCH SPECIAL CUT V DETAIL 11-10A SEE SHEET 2D-1 DITCH LATERAL BASE SITE 6 SITE 7 SITE 6 v 10' CONC10' CONC12' CONC9' GR12 ' CONC 15" RCP60" CHL 72" WD 15" RCP15" RCP11' CONC 18' GR 72" WD 11' CONC15" RCP11' GR 12' GR 19' BST 19' BST 19' BST 19' BST 19' BST 19' BST 12' BST72" WD60" IRON60" WR OUGHT IR ON48" WD POOLPOOL POOLPOOL11' SOIL 10' GR13' GR13' CONC 72" WD72" WD11' CONC13' CONC48" WDW FLAGLT LT LT W W W W 72" WDCONC 18" RCP15" RCP 15" RCP 15" RCP15" RCP 15" RCP 18" RCP 15" RCP 15" RCP 15" RCP 18" RCP 15" RCP 15" RCP 15" RCPGRGR SR 3767 OXFORD GREEN DR 18' BST BLUE HORIZON DR 20' BSTBLUE HORIZON DR 18' BST-EY9--EY9D--EY10A--EY10A-11.5' BSTSR 1386 BELLS LAKE RD 21' BSTEIP EIP EIP EIP EIP EIPEIP EIPEIP EIP EIP EXI STI NG R/WEXISTING R/W EXISTING R/W 60.00'60.00' EXISTING R/W EXISTING R/WEXISTING R/WEXISTING R/WEXISTING R/WEXISTING R/W EXISTING R/WEXISTING R/W 72" CMP18" CMP18" RCP18" CMP 3 6 " RCP24" PVC6 " P VC377 380 441 442 443 444 445 446 477 555 556 557 558 559 560 561 T T C T T C C TC C T T TC C CT C C C C C TIME WARNER CABLE TIME WARNER CABLE 123 124 128 119 120 122 121 117 113 115 118 111 112 130 110 107 116 116 107 130 116 20' BST SR 3767 OXFORD GREEN DR 114 127330335 340345350355253015 20152025 30 -Y8RPC- CS Sta. 23+74.68 -Y8RPC- SRS Sta. 25+98.68 -Y8RPC- SC Sta. 27+98.68 -Y8LPC- CS Sta. 17+55.38 -Y8LPC- SC Sta. 12+40.00 -Y8LPA- CS Sta. 18+41.02 -Y8LPA- ST Sta. 20+81.02 -Y8LPA- SC Sta. 13+40.00 -Y8LPA- SRS Sta. 11+00.00 -L- CS Sta. 340+83.16 -L- ST Sta. 342+83.16 -Y8- PT Sta. 25+67.47 15202530-Y8RPA- PT Sta. 30+79.59 -Y8RPA- SC Sta. 28+59.45 -Y8RPA- SRS Sta. 26+59.45 -Y8RPA- CS Sta. 24+59.45 -Y8RPA- SC Sta. 18+14.22 -Y8RPA- TS Sta. 16+14.22 -Y8- POC Sta. 25+23.20 -Y8RPC- POT Sta. 33+15.81 = -Y8- POC Sta. 25+50.70 -Y8LPC- POT Sta. 21+59.14 = -Y8- POC Sta. 36+28.77 -Y8RPA- POT Sta. 32+43.96 = -Y8- POC Sta. 36+01.16 -Y8LPA- POT Sta. 21+84.48 = -L- POC Sta. 337+43.35, 71.0' LT -Y8LPA- ST Sta. 10+00.00 = -L- POC Sta. 336+87.43, 71.0' RT -Y8LPC- ST Sta. 10+00.00 = -L- STA. 338+11.04 -Y8- STA. 30+60.45 = A C30 -Y8LPC- ST Sta. 19+95.38 -MUPBL- PT Sta. 26+14.04 -MUPBL- PC Sta. 25+88.02 25-Y8RPC- PT Sta. 30+88.84 -Y8LPC- POC Sta. 19+98.09 -MUPBL- POT Sta. 18+46.87 = -MUPBL- PT Sta. 17+16.10 -MUPBL- PC Sta. 20+99.18 -Y8RPC- POT Sta. 31+54.71 -MUPBL- POT Sta. 18+19.37 = -MUPBL- PRC Sta. 21+92.54 -MUPBL- PT Sta. 22+85.70-MUPBL- PT Sta. 29+80.19 -MUPBL- PC Sta. 29+66.41 -MUPBL- POT Sta. 16+42.41 -MUPBL_SW1- POT STA 10+00.00 = -MUPBL- PC Sta. 25+65.36 -L- POC Sta. 337+60.67 -MUPBL- POT Sta. 24+23.21 = -MUPBL- PRC Sta. 21+92.54-MUPBL- PRC Sta. 21+92.54 -MUPBL_SW2- POT Sta. 10+00.00 1520550'R 2610'R 7980'R 7990'R 700'R 5930'R C F F C C CF C C C C F F F F F F C C F F F C F F C C F F C C C C F F F F F F F CF F F F F F F F F F C C C C F F C C C F F F C F F C F F C CF C F F F C C F F C C F F F C F F F F C C C F CF F F F F F F F C C F C C CC C F F F F C F F C C C F C C C F C C C C C C F F F F PE SAS SAS WBE WBF WBF 370370370 375 375375 375 375375375380 380380380 380380380380380380380380380380380380 380380380 380380 380 380 380 380 3 8 0 380380380380380380380 380380380380 380380380380 380 380 385385 385385385385385385385385385385385 385385 385 385 385 385 385 3853 8 5 385385385385385385385 385385385385 385 3853853 8 5385385 385385385385 3853853853853853853853 8 5 385 385 385385385 385 385 390 3 9 0 390 390 390390 390 390390390 39 0 390 3 9 0 390 390390390390390390 390390 390390 390390390390390390390390 390390 390 390 3 9 0 3903903 90 3 9 0 3 9 0 390 390 390 390 390390 390390 390 390390390390390390390390390390390 390390 390390 390 390390 390390 390390390395 395395 395 395 395 395 3953953953 9 5 39 5395 395395395 395395395395395395395395 3953953953953953953953953953 9 5 3 9 5 3 9 5 395395 395 3 9 5 395395395395395395395395395395 395 395 395 400 400400400 400 4004004004004004 0 0 400400 4004004004004004004004004004004004004004004004004004004004 0 0 400400400 400400400400 400405 405405405405 405 405 405405405 405 405 4054054 0 5 405 405405405405405 405405405405405405405405405405405405405 4054054054 0 54054104 10 410410 410 4104104104 104104 1 0 410410410410410410410410410410 410 410410410410410410410410410410410410410410410415415 415 415 415415 4154154154154 15 415415415415415415415415 415 415415415415415415415 415 420 27 4 -L- STA 329+00.00MATCHLINE SHEET 2728 -Y8- STA 38+00.00MATCHLINE SHEET 56 -Y8- STA 23+00.00 MATCHLINE SHEET 55 -L- STA 355+00.00MATCHLINE SHEET 29-Y8RPA- STA 15+00.00-Y8RPC- STA 25+00.00MATCHLINE SHEET 2712/8/2020...\R2721_PSH_28_20Awet.dgn$$$$USERNAME$$$$HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER SHEET NO.PROJECT REFERENCE NO. 6/2/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALE 0'200'200' HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 R-2721 FOR DETOUR EASEMENT NEEDED CHORDCHORDCHORDCHORDCHORD CHORD CHORD BELLS LAKEBELLS LAKEBELLS LAKECAUSEWAYS TEMPORARY TS S S T T WETLAND DENOTES FILL INFF SURFACE WATER DENOTES IMPACTS IN CLEARING DENOTES MECHANIZED* * * * ** * ** * * IN WETLAND DENOTES EXCAVATION S S TS TS E EIMPACTS IN SURFACE WATER DENOTES TEMPORARY LEGEND HC HC CLEARING DENOTES HAND FILL IN WETLAND DENOTES TEMPORARY F24" RCP-III18" RCP-IV5 SY GEOTEXTILE EST 1 TON CLASS 'B' RIP RAP 7 SY GEOTEXTILE EST 2 TON CLASS 'B' RIP RAP FS FS FS 5 SY GEOTEXTILE EST 1 TON CLASS 'B' RIP RAP 5 SY GEOTEXTILE EST 1 TON CLASS 'B' RIP RAP 5 SY GEOTEXTILE EST 1 TON CLASS 'B' RIP RAP 7 SY GEOTEXTILE EST 2 TON CLASS 'B' RIP RAP CB CB CB 24" RCP-III RCP-IV15" 15" R C P-IV 15" RCP-IV 15" RCP-III 15" RCP- I V15" RCP- I V15" RCP-IV15" RCP-IV15" RCP-I V15" RCP-IV 15" RCP-IV RCP-IV15" 15" RCP-IIICB CB CB CB CB 7 SY GEOTEXTILE EST 2 TON CLASS 'B' RIP RAP EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEOTEXTILE15" RCP-IV15" RCP-III15" RCP-III18" RCP-IIIRC P-III24" 5 SY GEOTEXTILE EST 1 TON CLASS 'B' RIP RAP EST. 5 TONS CLASS 'B' RIP RAP 14 SY GEOTEXTILE FS FS FS FS FS REMOVE REMOVE REMOVE REMOVE DETAIL 11-08 SEE SHEET 2D-1 LATERAL 2' BASE DITCH DETAIL 11-05 SEE SHEET 2D-1 LATERAL 'V' DITCH SEE DETAIL 05-01 TOE PROTECTION DETAIL 11-04 SEE SHEET 2D-1 BERM DITCH DETAIL 11-06 SEE SHEET 2D-1 BERM 2' BASE DITCH DETAIL 11-07 SEE SHEET 2D-1 LATERAL 6' BASE DITCH RCBC 1@7'x8' 14 SY GEOTEXTILE EST 5 TON CLASS 'B' RIP RAP DETAIL 11-11A SEE SHEET 2D-1 W/HINGE SPECIAL CUT DITCH DETAIL 11-11B SEE SHEET 2D-1 DITCH LATERAL 2' BASE 7 SY GEOTEXTILE EST 2 TON CLASS 'B' RIP RAP DETAIL 11-09B SEE SHEET 2D-1 BERM BASE DITCH DETAIL 11-10B SEE SHEET 2D-1 SPECIAL CUT DITCH EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEOTEXTILE REMOVE REMOVEREMOVEREMOVEREMOVE RCP- I I I18" EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEOTEXTILE RCP-III18" W/ FG 2GI DETAIL 11-10A SEE SHEET 2D-1 DITCH LATERAL 2' BASE DETAIL 12-01 SEE SHEET 2D-1 STANDARD 4' BASE DITCH 358 SY GEOTEXTILE EST 290 TONS CLASS 'II' RIP RAP 358 SY GEOTEXTILE EST 290 TONS CLASS 'II' RIP RAP 175 SY GEOTEXTILE EST 150 TONS CLASS 'II' RIP RAP DETAIL 25-01 SEE SHEET 2D-2 SPECIAL CUT DITCH DETAIL 24-01 SEE SHEET 2D-2 SPECIAL CUT DITCH SHEET 2D-2 DETAIL 'EDB-01', ENERGY DISSIPATOR BASIN #4 RCP-III15" 15" RCP-IV DETAIL 11-01 SEE SHEET 2D-1 132 SY GEOTEXTILE EST 47 TONS W/ CLASS 'B' RIP RAP LATERAL 2' BASE DITCH DETAIL 11-09A SEE SHEET 2D-1 266 SY GEOTEXTILE EST 97 TONS W/ CLASS 'B' RIP RAP LATERAL 4' BASE DITCH DETAIL 11-09B SEE SHEET 2D-1 417 SY GEOTEXTILE EST 153 TONS W/ CLASS 'B' RIP RAP BERM BASE DITCH DETAIL 11-02 SEE SHEET 2D-1 1172 SY GEOTEXTILE EST 957 TONS W/CLASS 'I' RIP RAP LATERAL BASE DITCH DETAIL 11-03B SEE SHEET 2D-1 140 SY GEOTEXTILE EST 75 TONS W/ CLASS 'I' RIP RAP STANDARD 2' BASE DITCH DETAIL 11-03B SEE SHEET 2D-1 80 SY GEOTEXTILE EST 45 TONS W/ CLASS 'I' RIP RAP STANDARD 2' BASE DITCH DETAIL 11-03A SEE SHEET 2D-1 880 SY GEOTEXTILE EST 565 TONS W/ CLASS 'I' RIP RAP 7' BASE CHANNEL DETAIL 11-01 SEE SHEET 2D-1 247 SY GEOTEXTILE EST 192 TONS W/ CLASS 'I' RIP RAP LATERAL 2' BASE DITCH DETAIL 11-01 SEE SHEET 2D-1 218 SY GEOTEXTILE EST 77 TONS W/ CLASS 'B' RIP RAP LATERAL 2' BASE DITCH DETAIL 11-11A SEE SHEET 2D-1 SPECIAL CUT DITCH 242 SY GEOTEXTILE EST 180 TONS CLASS 'II' RIP RAP RCP-IV 15" FS RCP-III 15" EST. 5 TONS CLASS 'B' RIP RAP 14 SY GEOTEXTILE DETAIL AA SEE SHEET 2D-2 50 SY GEOTEXTILE EST 50 TONS ON BANKS ONLY CLASS 'II' RIP RAP 22 SY GEOTEXTILE EST 15 TONS STREAM BED EMBEDDED INTO CLASS 'I' RIP RAP STREAM STABILIZATION SEE SHEET 2D-2, DETAIL AA EST 53 TONS, 54 SY GEOTEXTILE CLASS 'II' RIP RAP ON BANKS ONLY EST 20 TONS, 28 SY GEOTEXTILE EMBEDDED INTO STREAM BED CLASS 'I' RIP RAP STREAM STABILIZATION DETAIL AA SEE SHEET 2D-2 50 SY GEOTEXTILE EST 59 TONS ON BANKS ONLY CLASS 'II' RIP RAP 26 SY GEOTEXTILE EST 18 TONS STREAM BED EMBEDDED INTO CLASS 'I' RIP RAP STREAM STABILIZATION DETAIL AA SEE SHEET 2D-2 50 SY GEOTEXTILE EST 48 TONS ON BANKS ONLY CLASS 'II' RIP RAP 28 SY GEOTEXTILE EST 20 TONS STREAM BED EMBEDDED INTO CLASS 'I' RIP RAP STREAM STABILIZATION 15" 15" 18" 15" 15" 15" 18" 18" 18" 24"24"18" 15" W/ELBOWSCSP 15" W/ELBOWS CSP 15" W/ELBOWS 15" CSP 15" RCP-III18" RCP-IIIFS RCBC 1@7'x8' W/ELBOWS 15" CSP W/ELBOWS 15" CSP W/ELBOWS 15" CSP V10=2.12 FPS Q10=14.43 CFS V2=1.95 FPS Q2=11.3 CFSRCP-III24"2GI 2GI15"15" RCP- I I I 10 SY GEOTEXTILE EST 3 TON CLASS 'B' RIP RAP 18"15" RCP-IV RCBC 12'x12'15"15" 15" 7 SY GEOTEXTILE EST 2 TON CLASS 'B' RIP RAP 7 SY GEOTEXTILE EST 2 TON CLASS 'B' RIP RAP DETAIL 11-06 SEE SHEET 2D-1 BERM BASE DITCH DETAIL 11-10A SEE SHEET 2D-1 DITCH LATERAL 2' BASE DETAIL 11-12 SEE SHEET 2D-1 DITCH SPECIAL CUT V DETAIL 11-10A SEE SHEET 2D-1 DITCH LATERAL BASE R-2721B ROADWAY SHEET NO. 11 SHEET 20A OF 69 PERMIT DRAWING LAST REVISED ON 12/08/20 PERMIT DRAWING PACKAGE SITE 6 SITE 7 SITE 6 345350-L- ST Sta. 342+83.16 20-Y8RPA- SC Sta. 18+14.22 -Y8RPA- TS Sta. 16+14.22 A 2610'R F F F F F F C F F F F C F F CF F F F F F WBF 12/8/2020...\R2721_PSH_28_20wet_BLOWUP$$$$USERNAME$$$$HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER SHEET NO.PROJECT REFERENCE NO. 6/2/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETEDHDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 F R-2721 R-2721B ROADWAY SHEET NO. 11 28 LEGEND GRAPHIC SCALE 0 505025 100 LAST REVISED ON 12/08/20 PERMIT DRAWING PACKAGE CAUSEWAYS TEMPORARY T T WETLAND DENOTES FILL INFF SURFACE WATER DENOTES IMPACTS IN CLEARING DENOTES MECHANIZED* * * * *** ** * * S S TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY HC HC CLEARING DENOTES HAND FILL IN WETLAND DENOTES TEMPORARY 5 SY GEOTEXTILE EST 1 TON CLASS 'B' RIP RAP 5 SY GEOTEXTILE EST 1 TON CLASS 'B' RIP RAP 7 SY GEOTEXTILE EST 2 TON CLASS 'B' RIP RAP EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEOTEXTILE15" RCP-IV15" RCP-IIIEST. 5 TONS CLASS 'B' RIP RAP 14 SY GEOTEXTILE FS DETAIL 11-08 SEE SHEET 2D-1 LATERAL 2' BASE DITCH DETAIL 11-06 SEE SHEET 2D-1 BERM 2' BASE DITCH DETAIL 11-07 SEE SHEET 2D-1 LATERAL 6' BASE DITCH EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEOTEXTILE 358 SY GEOTEXTILE EST 290 TONS CLASS 'II' RIP RAP 358 SY GEOTEXTILE EST 290 TONS CLASS 'II' RIP RAP 175 SY GEOTEXTILE EST 150 TONS CLASS 'II' RIP RAP SHEET 2D-2 DETAIL 'EDB-01', ENERGY DISSIPATOR BASIN #4 RCP-III15" 242 SY GEOTEXTILE EST 180 TONS CLASS 'II' RIP RAP EST. 5 TONS CLASS 'B' RIP RAP 14 SY GEOTEXTILE 24"24"18" W/ELBOWS CSP 15" W/ELBOWS 15" CSP W/ELBOWS 15" CSP V10=2.12 FPS Q10=14.43 CFS V2=1.95 FPS Q2=11.3 CFSRCP-III24"SITE 7 Hand Permanent Permanent Existing Existing Permanent Temp. Excavation Mechanized Clearing SW SW Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in impacts impacts SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands (Pond) (Stream) impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 244+00-L-/248+00-L-3@8'x10' RCBC 0.08 302 244+00-L-/248+00-L-FILL 1.42 < 0.01 0.12 244+00-L-/248+00-L-BANK STABILIZATION < 0.01 0.01 50 36 244+00-L-/248+00-L-CULVERT STABILIZATION 0.02 69 2 279+00-L-/280+22-L-FILL 0.86 0.15 0.95 0.03 < 0.01 398 11 3 281+00 -L-/283+00-L-2@7'X7' RCBC 0.04 285 281+00 -L-/283+00-L-FILL 0.01 46 281+00 -L-/283+00-L-CULVERT STABILIZATION 0.01 96 4 313+00-L-/317+00-L-FILL 0.19 0.01 0.04 0.01 107 14 5 322+00-L-/325+00-L-1@6'X8' RCBC 0.05 458 52 322+00-L-/325+00-L-FILL 1.04 0.26 322+00-L-/325+00-L-CULVERT STABILIZATION 0.01 57 6 330+00-L-/332+00-L-1@6'X8' RCBC (1)0.41 0.03 0.03 0.02 284 10 330+00-L-/332+00-L-1@6'X8' RCBC (2)0.02 244 330+00-L-/332+00-L-FILL 0.08 0.04 0.02 311 330+00-L-/332+00-L-CULVERT STABILIZATION 0.01 113 7 346+00-L-/349+00-L-, 21+00-Y8RPA-/25+00-Y8RPA-BRIDGES 0.12 0.74 0.02 0.46 8 365+00-L-/366+50-L-FILL 0.23 < 0.01 < 0.01 0.03 < 0.01 105 9 366+50-L-/13+50 -Y10A-1@6'X8' RCBC 0.01 0.26 0.01 237 37 366+50-L-/13+50 -Y10A-66" RCP 0.05 < 0.01 < 0.01 105 366+50-L-/13+50 -Y10A-FILL < 0.01 0.01 204 366+50-L-/13+50 -Y10A-CULVERT STABILIZATION 0.01 115 10++380+00 -L-/383+00-L-42" RCP 1.52 TOTALS* THIS SHEET:4.42 0.74 0.10 0.90 0.46 2.47 0.35 0.02 3540 205 TOTALS*ENTIRE R-2721B:8.38 0.74 4.71 1.77 0.46 15.56 0.84 0.05 8898 540 *Rounded totals are sum of actual impacts. NOTES: Revised 2016 09 09 SHEET 68 OF 69 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS WAKE COUNTY TIP R-2721B STATE PROJ. # 6.401078 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS DECEMBER 2020 ++Site includes only isolated resources.PERMIT DRAWING PACKAGE LAST REVISED ON 12/08/20 Sites containing temporary excavation listed below are included in the mechanized clearing impacts: Site 2 = .007ac ; Site 5 = .03ac ; Site 6 = .003ac Site 9 = .006ac ; Site 14 = .007ac, Grand Total = .053ac Temp Excavation HandPermanentPermanentExisting Existing Permanent Temp. Excavation Mechanized Clearing SW SW Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in impacts impacts SW Impacts Impacts StreamNo.(From/To)Size / TypeWetlands Wetlands Wetlands in Wetlands Wetlands (Pond) (Stream) impacts Permanent Temp. Design(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)11 386+00-L-/391+00-L-48" RCP4.43 0.04 < 0.01 404 60386+00-L-/391+00-L-FILL< 0.01 < 0.01 2012 384+50-L-/387+00-L-FILL0.860.04 0.170.01 < 0.01 157 4613++ 408+00-L-/411+00-L-FILL0.210.0614 412+00-L-/416+00-L-FILL0.310.06 0.090.03 < 0.01 413 2815 414+50-L-/415+50-L-1@7'X8' RCBC2.30 < 0.0114216 420+00-L-/425+00-L-42" RCP0.740.03 0.370.04 < 0.01 315 13420+00-L-/425+00-L-FILL< 0.0164420+00-L-/425+00-L-17 437+00-L-/30+00-Y13A-2@7'X7'RCBC0.480.10< 0.01 < 0.0146437+00-L-/30+00-Y13A-FILL< 0.01170437+00-L-/30+00-Y13A- BANK STABILIZATION0.02216437+00-L-/30+00-Y13A- CULVERT STABILIZATION0.0516318 459+50-L-/463+50-L-2@7'X8'RCBC0.186.36 0.02116459+50-L-/463+50-L- CULVERT STABILIZATION< 0.017519++15+00-Y13LPC-EXCAVATION2.1520 478+00-L-/488+00-L-FILL0.622.25 0.050.07 0.01 830 6021490+00-L-2@6'X8'RCBC0.400.090.08 < 0.01 977 34490+00-L-FILL0.02233490+00-L-CULVERT STABILIZATION0.0215122495+00-L-1 @ 6'X8' RCBC0.14< 0.010.03 < 0.01 490 13495+00-L-FILL0.01257495+00-L-2365+30-Y13-FILL< 0.01 < 0.01 9112410+00-Y13B-15" RCP< 0.01 < 0.01 11710+00-Y13B-FILL< 0.0113TOTALS* THIS SHEET:3.93 0 4.61 0.87 0 13.09 0.47 0.03 5216 328TOTALS*ENTIRE R-2721B:8.38 0.74 4.71 1.77 0.46 15.56 0.84 0.05 8898 540*Rounded totals are sum of actual impacts.NOTES:Revised 2016 09 09SHEET 69OF 69++Site includes only isolated resources.PERMIT DRAWING PACKAGE LAST REVISED ON 12/08/20 Sites containing temporary excavation listed below are included in the mechanized clearing impacts:Site 2 = .007ac ; Site 5 = .03ac ; Site 6 = .003acSite 9 = .006ac ; Site 14 = .007ac, Grand Total = .053ac Temp ExcavationWETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSWAKE COUNTYTIP R-2721BSTATE PROJ. # 6.401078NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYSDECEMBER 2020 HandPermanentPermanentExisting Existing Permanent Temp. Excavation Mechanized Clearing SW SW Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in impacts impacts SW Impacts Impacts StreamNo.(From/To)Size / TypeWetlands Wetlands Wetlands in Wetlands Wetlands (Pond) (Stream) impacts Permanent Temp. Design(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)2515+00-Y13A-36" RCP0.030.01 < 0.01 115615+00-Y13A-FILL< 0.011115+00-Y13A-BANK STABILIZATION< 0.011626++10+00-Y13A-FILLTOTALS* THIS SHEET:0.03 0000 0 0.02 0.00 1426TOTALS*ENTIRE R-2721B:8.38 0.74 4.71 1.77 0.46 15.56 0.84 0.05 8898 540*Rounded totals are sum of actual impacts.NOTES:Revised 2016 09 09SHEET 69AOF69WETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSWAKE COUNTYTIP R-2721BSTATE PROJ. # 6.401078NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYSDECEMBER 2020++Site not impacted in final designPERMIT DRAWING PACKAGE LAST REVISED ON 12/08/20