Loading...
HomeMy WebLinkAbout20202011 Ver 1_Riparian Buffer Authorization Request_20201222 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 12/22/2020 8:14:14 AM(Start) Approve by Carpenter,Kristi 12/23/2020 3:22:13 PM(DOT-Initial Review) • The task was assigned to Carpenter,Kristi 12/22/2020 8:16 AM Buffer Authorization Application Form Water Resourcese" ENVIRONMENTAL QUALITY 15ANCPC 02B.0233(8)(b),.0243(8)(b),.0250(11)(b),.0259(8)(b),.0267(11)(c),.0607(e)(2)Buffer Authorization Online Form- Update 10/23/2018 Original Submittal 12/22/2020 A. Owner/Applicant Information ..................................................................................................................................................... General Information Primary Contact Email:* cjacobs@townofmorrisville.org Reese list the contact person's erreil for questions or payrrent on this project if needed. Who is submitting the application?* ® Owner ❑ Applicant other than Owner El Agent Is there an agent working on this application C Yes but not submitting it? No 1. Property Owner Information: ............. . . ........... ........... . ........... . ........... . ........... . . ........... . ........... . . ........... . ........... . . ........... . ........... . . ........... . ........... . . ........... . ........... .................. 1a.Name on Recorded Deed:* Town of Morrisville lb.Responsible Party: (for Corporations) 1c.Mailing Address:* Street Address 100 Town Hall Drive Address Line 2 City State/Rovince/Region Morrisville NC Fbstal/Zip Code Country 27615 USA Id.Telephone:* 9194636908 le. Email Address:* cjacobs@townofmorrisville.org B. Project Information and Prior Project History .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 1. Project Information .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 1a. Name of Project:* Indian Creek Greenway Connector (Subdivision,facility,or establishrrent narre) lb.Is this a publicly-funded transportation project?* C' Yes r No 1c.TIP# Id.Subdivision Name: n/a le.Nearest Town of Morrisville Municipality: If.Property Size: 3.07 acres 1g.County(or Counties)where the project is located:* Wake 1h.Property ID# Date of Purchase 0745687043 Tax RN or Parcel id 1 i.Deed Information Type of Book Book# Page# Deed 012378 02521 Map 1j.Attach a copy of the recorded map that indicates when the lot was last platted. aick the upload button or drag and drop files here to attach docurrent WakeCo Map.pdf 209.06KB FDF only 1k.How would you like to provide the Latitude and Longitude information?* r Address Lookup C Manually Latitude* 35.832925 Longitude* -78.841956 11.Is the project located in any of North Carolina's twenty coastal counties?* r Yes C' No 2. Surface Waters 2a.Name of the nearest body of water to proposed project:* Indian Creek to Crabtree Creek 2b.Water Quality Classification of nearest receiving water:* C;NSW 2c.List the total estimated linear feet of all existing streams(intermittent and perennial)on the property:* 724 (linear feet only) 3. Project Description: ................................................................................................................. 3a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is mostly wooded with a portion of the lot clear for an utility easement.The site is vacant with the exception of a network of existing greenways.This project will close a gap in the greenway system. 3b.Attach an 8'/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. aick the upload button or drag and drop files here to attach docurrent USGS.pdf 103.73MB FCF only 3c.Attach an 8 1/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. aick the upload button or drag and drop files here to attach docurrent Soils Map.pdf 16.23MB F DF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:* This project provides the missing greenway connection from Garden Square Ln.to the Indian Creek Greenway just south of Airport Blvd.The stream crossing will be a 10'wide boardwalk on piers to minimize buffer impacts. Attach a site plan as applicable to the project: aick the upload button or drag and drop files here to attach docurrent C.6.pdf 403.84KB FCF only 5. Jurisdictional Determinations 5a.Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project(including all prior phases)in the past?* ✓ Yes C No 6. Project History .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 6a.Have permits or certifications been requested or obtained for this project(including all prior phases)in the past?* C Yes C No 7. Future Project Plans A .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 7a.Is this project a phased project?* O Yes CJNo C. Proposed Impacts Inventory .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Buffer Impacts .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Project is in which protected Basin?* F Neuse River Basin(15A NCAC 02B.0233) f Catawba River Basin(15A NCAC 02B.0243) ✓ Randleman Lake Watershed(15A NCAC 02B.0250) C- Tar-Pamlico River Basin(15A NCAC 02B.0259) ✓ Jordan Lake Watershed(15A NCAC 02B.0267) ✓ Goose Creek Watershed(15A NCAC 02B.0606&15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation,then you MUST fill out Section D of this form. Site#-Reason Stream Name I Buffer Impact* Impact Type* Zone 1 Zone 2 Greenway Crabtree Permanent Allowable 458.44 210.54 Nap label(e.g.Road Creek (P) Square Square Crossing 1) Perm orTerrp Feet Feet Greenway Crabtree Temporary Allowable 567.91 316.64 Ntbp label(e.g.Fbad Creek (T) Square Square Crossing 1) Perm or Tenp Feet Feet Total Zone 1 Impacts: 1,026.35 Total Zone 2 Impacts: 527.18 Total Buffer Impacts: 1,553.53 Comments: D. Impact Justification and Mitigation ................................................................................................................................................................................. 1. Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.* The proposed connection is a perpendicular crossing through the riparian buffer as a 10'wide boardwalk on piers to minimize impacts. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.* BOARDWALK CONSTRUCTION SEQUENCE 1.Clear vegetation by cutting at ground level(do not remove root structure) 2.Stake and locate boardwalk. 3.Begin installation of boardwalk @ edge of zone 2. 4.Construct one section of boardwalk including piers,beams,joists and decking. 5.Track onto newly built section of boardwalk with mini-excavator to install piers for the next section of boardwalk. 6.Repeat steps 3&4 until boardwalk traverses through buffer zones 1 &2 as shown on the construction drawings. E. Diffuse Flow Plan 1a.What type of SCM are you providing?* ✓ Level Spreader ✓ Vegetated Conveyance(lower SHWT) r Wetland Swale(higher SHWT) 17 Proposed project will not create concentrated stormwater flow through the buffer ✓ Other SCM that removed minimum of 30%nitrogen 1 c.Diffuse Flow Documentation* Click the upload button or drag and drop files here to attach docurrent C.7.pdf 436.73KB EDF only F. Supplementary Information Environmental Documentation 1a. Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land? No 1b.If you answered "yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act(NEPA/SEPA)? r Yes rNo Violations 2a. Is the site in violation of DWR Wetland Rules(15A NCAC 02H.0500), Isolated Wetland Rules(15A NCAC 02H.1300),DWR Surface Water or Wetland Standards,or Riparian Buffer Rules(15A NCAC 02B.0200)? r Yes fr No 2b.Is this an after-the-fact buffer authorization application? r Yes r No ............................................................................................. G.Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: dick the upload button or drag and drop files here to attach docurrent Impact Map.pdf 402.77KB FDF only Additional Comments: H. Sign and Submit ^ By digitally signing below,I certify that: • I have given true,accurate,and complete information on this form; o I agree that submission of this form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit the application form." Print Name:* Catherine Jacobs Signature 6Z tG 'e C9:cad Submission Date: 12/22/2020 (Auto populated field) Initial Review Is this accepted into the review process?* CJ Yes O No Is this project a public transportation CJ Yes project?* r No ID#* 20202011 Version:* 1 Select Reviewer: Rob Ridings:eads\rgridings Select Reviewing Office* Central Office-(919)707-9000 Has payment been received?* f: No Payment Needed r Fee Received r Need Fee-send electronic notification