Loading...
HomeMy WebLinkAbout20201784 Ver 1_Pre-Filing Meeting Information_20201221DWR Pre-Fil ing Meeting Req u est Form ID#*Ve rsion * Re gional Office * Re v ie we r List * Contact Name * Contact Email Addre ss * Proje ct Name * Proje ct Owne r * Proje ct County * Owne r Addre ss: Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Ple ase list all e xisting proje ct ID's associate d with this proje cts.* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low.* 20201784 1 Winston-Salem Regional Office - (336) 776-9800 Dave Wanucha Pre-Filing Me eting Reque st submitte d 11/20/2020 Jerry Parker jparker@ncdot.gov New Hope Rd Bridge Replacement NCDOT Orange City Greensboro State / Province / Region NC Postal / Zip Code 27415-4996 Country USA Street Address P.O. Box 14996 Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No WBS 17BP.7.R.111 David Wanucha Please give a couple of dates you are available for a meeting. Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature Submittal Date The North Carolina Department of Transportation (NCDOT) is proposing to replace Orange County Bridge #99 on New Hope Church Road (SR 1732) over New Hope Creek.The existing structure is a three span bridge (3@35’) and is a reinforced concrete deck on I-Beams. The end bents are reinforced concrete caps on timber piles and the interior bents are reinforced concrete posts and beams. The proposed structure is a single span (1@105'), 39" precast concrete box beam with 4' deep caps. This structure has been designed to have as little environmental and surface water impacts as possible. 2 12/3/2020 12/3/2020 Bridge #99 Permit & Stormwater Plans.pdf 3.41MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 11/20/2020