Loading...
HomeMy WebLinkAbout20201784 Ver 1_Bridge #99 SW and Buffer Impacts_20201221 WETLAND PERMIT IMPACT SUMMARY WE i LAND IMPAC I S SURFACE WA fbR IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill in Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size /Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (rt) (a) 1 -L- 15+75 to 16+30 SINGLE SPAN 39" BOX BEAN 0.04 < 0.01 87 10 1 -L- 15+76 to 15+84 TEMP. CAUSEWAY < 0.01 TOTALS": 0.04 < 0.01 87 10 "Rounded totals are sum of actual impacts NOTES: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS DEC 4, 2018 ORANGE COUNTY BRIDGE N99 17BP.7.R.111 Rowland sopmmxraou SHEET 7 OF 7 BUFFER IMPACTS SUMMARY IMPACT BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 SITE NO. STRUCTURE SIZE/TYPE STATION (FROM/TO) CROSSING BRIDGE IMPACT (ft2) (ft2) (ft) (ft2) (ft2) (ft2) (fI2) (ft) 1 105 @ 39" BOX BEAM From -L- 15+42.5 to -L- 16+47.5 X 4260 533 4793 105 @ 39" BOX BEAM From -L- 15+25 to -L- 16+82 X 266 1636 1902 TOTAL: - 4526 2169 6695 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS ORANGE COUNTY PROJECT: SF-670099 12/4/2018 SHEET 6 OF 6 Rev. May 2006