Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
830013_Lagoon Design_20200710
Address: PO Box 856 Warsaw, NC 28398 Countv: Scotland FARM INFORMATION Nursery: Wean to Finish: Gilts: Farrow to weanling: Farrow to feeder: Farrow to finish: Boars: Storage Period: 25 Yr. / 24 Hr Storm Event "Heavy Rain" Factor Rainfall in Excess of Evaporation Additional Water Usage: Additional Drainage Area: Checked By: DSE Date: 06/17/20 Sheet 1 of 7 Farm Population: 0 0 4752 Hd. 0 0 0 0 180 Days 6.8 In. 7.0 In. 0 0 LAGOON INFORMATION Is Lagoon Designed as an Irregular Shape? (Y/N) N Does Operator Want Emergency Spillway? (Y/N) - N Was This Design Built Prior to Sept. 1996? (Y/N)---------- Y Is Drain Tile Req'd to Lower SHWT? (Y/N)----------- N Seasonal High Water Table Elev:---------------- 0.00 Freeboard: — 1.0 Ft. Emergency Spillway Flow Depth: Side Slopes: -------------- 2.5 :1 (H:V) Inside Top Length: 427.0 Ft. Inside Top Width: 275.0 Ft. Top of Dike Elevation: Depth 50.00 Ft. Finished Bottom Elevation: — ---------- --- 15.00 Ft. 35.00 Ft. Start Pump Elevation: ------------ 19.2 In. 48.40 Ft. Stop Pump Elevation: --- 49.2 In. 45.90 Ft. LAGOON VOLUME REQUIRED VOL. DESIGN VOLUMES % REQ'D Storm Stor= 66541 (Cu.Ft.) 67,334 (Cu.Ft.) 101.19% Temporary = 242314 (Cu.Ft.) 269,368 (Cu.Ft.) 111.16% Permanent = 712800 (Cu.Ft.) 942,303 (Cu.Ft.) 132.20% Total Volume = 1,021,655 (Cu.Ft.) 1,279,005 (Cu.Ft.) 125.19% 1/2 Treatment Volume = 356,400 (Cu.Ft.) 1/2 Treatment Volume Elevation = 42.24 Ft. 90 Temporary Storage Volume Elevation = 47.07 Ft. Min. Required Liner Thickness Lagoon Surface Area: (Inside TOD) 93.07 In. 35.15 In. 2.2 Ft. 117,425 S.F. Murphy -Brown, LLC Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 Grower: 707931-K&S Designed y: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 06/17/20 County: Scotland Sheet 2 of 7 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: r, jcu. Ft. LAGOON STAGE -AREA VOLUMES Contour Elevation (FT.) Area SF Incr. Vol. (Cu. FT) Cumul. Vol. (Cu. FT) 35.00 70,400 0 36.00 73,185 71,793 71,793 37.00 76,020 74,603 146,395 38.00 78,905 77,463 223,858 39.00 81,840 80,373 304,230 40.00 84,825 83,333 387,563 41.00 87,860 86,343 473,905 42.00 90,945 89,403 563,308 43.00 94,080 92,513 655,820 44.00 97,265 95,673 751,493 45.00 100,500 98,883 850,375 46.00 103,785 102,143 952,518 47.00 107,120 105,453 1,057,970 48.00 110,505 108,813 1,166,783 49.00 113,940 112,223 1,279,005 50.00 117,425 115,683 1,394,688 These volumes were calculated using the vertical average end area method TOTAL REQD VOL 1,021,655 CF CUMULATIVE VOL. ZONE VOL. 125.19% END PUMP = _ _ = 45.90 FT 942,303 CF TR'MT 942,303 132.20 0 START PUMP = = 48.40 FT 1,211,672 CF TEMP 269,368 111.16 0 MAX STORAGE = 49.00 FT 1,279,005 CF STORM 67,334 101.19'0 Murphy -Brown, LLC Engineering P.O. Box 856,Warsaw, NC 28398 (910) 293-3434 Urower: 707931-K&S Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 06/17/20 County: Scotland Sheet 3 of 7 MINIMUM REQUIRED VOLUME CALCULATIONS Permanent Storage: Required Treatment Volume: nima) Type Capacity *ALW (cu. . = Total Nursery 0 30 1.00 0 Wean to Finish 0 115 1.00 0 Gilts 4,752 150 1.00 712,800 Farrow to weanling 0 433 1.00 0 Farrow to feeder 0 522 1.00 0 Farrow to finish 0 1,417 1.00 0 Boars 0 400 1.00 0 Total Required Treatment Volume (cu. ft.)= Sludge Storage Volume: 712,800 jAnimal Type i7apacity ALW (cu. . = Total Nursery 0 30 0.00 0 Wean to Finish 0 115 0.00 0 Gilts 4,752 150 0.00 0 Farrow to weanling 0 433 0.00 0 Farrow to feeder 0 522 0.00 0 Farrow to finish 0 1,417 0.00 0 Boars 0 400 0.000 0 total Required Sludge Storage Volume (cu. ft.)= Temporary Storage Volume: Manure Production: jAmmal Type Capacity Sto. Period J./day) = Total Nursery 0 180 0.30 0 Wean to Finish 0 180 1.17 0 Gilts 4,752 180 1.52 1, 300,147 Farrow to weanling 0 180 4.39 0 Farrow to feeder 0 180 5.30 0 Farrow to finish 0 180 14.38 0 Boars 0 180 4.06 0 Total Manure Production (gals.)= Total Manure Production (cu.ft.)= Excess Fresh Water: 1,300,147 173,816 jAnimal Type Capacity Sto. Period J./day) = Total Nursery 0 180 0.00 0 Wean to Finish 0 180 0.00 0 Gilts 4,752 180 0.00 0 Farrow to weanling 0 180 0.00 0 Farrow to feeder 0 180 0.00 0 Farrow to finish 0 180 0.00 0 Boars 0 180 0.00 0 Total Fresh Water Excess (gals.) -- Total Fresh Water Excess (cu.ft.)= Grower: 707931-K&S Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 06/17/20 County: Scotland Sheet 4 of 7 Temporary Storage Volume: (Cont.) Rainfall in Excess of Evaporation: Vol.=(Lagoon Surface Area + Additional Drainage Area) * Rainfall / 12in./ft Vol.= (117425 sq.ft. + 0 sq.ft.) * 7 in. /12 in./ft. Total Required Volume for Rainfall in Excess of Evap. (cu.ft.)= 68,498 Storm Storage: Vol.=(Lagoon Surf. Area + Addt'I Drainage Area) * 25Yr./24Hr. Storm(in) / 12in./ft. Vol.= (117425 sq.ft + 0 sq.ft.) * 6.8 in. /12 in./ft. Total Required Volume for 25Yr.124Hr. Storm Event (cu.ft)= 66,541 "Heavy Rain" Storage: Vol.=(Lagoon Surf. Area + Addt'I Drainage Area) * "Heavy Rain" Factor (in) / 12in./ft. Vol.= (117425 sq.ft + 0 sq.ft.) * 0.0 in. /12 in./ft. Total Required Volume for "Heavy Rain" (cu.ft.) _ (for Extended Periods of Chronic Rainfall) Additional Water Storage: No Additional Water Storage is Required Total Required Storm Storage (25Yr. / 241-1r. Storm +'Heavy Rain')= 66,541 (CU.FT) Total Required Temporary Storage (Manure Prod. + Excess Fr. Water + Rainfall Excess + Additional Water Storage) = 242,314 (CU.FT) Total Required Permanent Storage (Treatment + Sludge) = 712,800 (CU.FT) TOTAL REQUIRED VOLUME = 1021655 (CU.FT.) Grower: 707931-K&S Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 06/17/20 County: Scotland Sheet 5 of 7 LAGOON DESIGN SUMMARY Top of Dike Elevation --- - 50.00 FT. Emergency Spillway Crest Elevation ------------------- Not Al Applicable Top of 25Yr. / 24Hr. Storm Storage ------------------- 49.00 FT. Top of "Heavy Rain" Storage ------------------- Not Applicable Start Pump Elevation ------------------- 48.40 FT. End Pump Elevation ----- 45.90 FT. Top of Sludge Storage ------------------- Not Applicable Seasonal High Watertable Elev.------------------- 0.00 Finished Bottom Elevation ---- -------------- 35.00 FT. Inside Top Length ------------------- 427.00 FT. Inside Top Width ----- 275.00 FT. Side Slopes ----------- 3:1 H:V Lagoon Surface Area --------------- 117,425 SF Min. Liner Thickness (if required) ---- 2.2 FT. Freeboard Depth -------- ---------- 1.00 FT. Temporary Storage Period ------------ 180 Days Zone Depths: TOTAL DESIGN VOLUME = 1279006 (CU.FT.) Treatment / Sludge Storage Zone Depth ----------- 10.9 FT. Temporary Storage Zone Depth ----------- 2.5 FT. Freeboard / Storm Storage Zone Depth --------- 1.6 FT. Total Lagoon Depth ----------- 15.0 FT. § 4u§� — 9§°\ ,® k�&$ ~' � k/d\ ~,3 � \ 06 j \ } ) LO j \ -1 § j 2 ( w ƒ ] k § § \ § k j of \ § ( \ ! § § 0 ) w / § 0 0 ƒ 2 ® 2 / m LO N ( ƒ \ ] b 00 OD )�Z x+� 4 q )MV) $ # \ )E)) ~� IL / ƒ .. ILw CL / k) \ L a � 6 7 3 2 E ( \ \ k Grower: 707931-K&S Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 06117 020 County: Scotland Sheet 7 of 7 This livestock waste treatment lagoon is designed in accordance with the United States Natural Resources Conservation Service PRACTICE STANDARD 359- WASTE TREATMENT LAGOON, revised prior to June, 1996. Emergency Spillway: An Emergency Spillway is not required. CARD' , S <i NOTE: See attached Waste Utilization Plan O ; O 0/vy SEAL 023994 DESIGNED: � '• DATE: 6hAa i,'"' 70 Sn����```: COMMENTS: This design is update of start and stop pump elevations and to show the 1/2 treatment volume level for sludge storage. This design does not supercede the certification of the farm. LLC Enqineerinq O'I1kkI1 (910)