Loading...
HomeMy WebLinkAboutWQ0042160_Application (FTSE)_20201222HLGHULL) DWR DEC 0 4 2020 State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources WQR:hNSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION ,..... , 1 �.l .�, rn ._ _ ..... 3'i4s,._ This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A NCAC 02T, 15A NCAC 02T .0300, Division policies and good engineering practices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be available upon request by the Division. Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NCAC 02T.0303. Projects not eligible for review via the fast track process (must be submitted for full technical review): ➢ Projects that require an environmental assessment in accordance with 15A NCAC 1 C .0100; ➢ Projects that do not meet any part of the minimum design criteria (MDC) document; ➢ Projects that involve a variance from the requirements of 15A NCAC 2T; ➢ Pressure sewer systems utilizing septic tank -effluent pumps (STEPS) or simplex grinder pumps; ➢ STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains); ➢ Vacuum sewer systems. General —When submitting an application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy of Application and Supporting Documents d Required unless otherwise noted B. Cover Letter (Required for All Application Packages): V List all items included in the application package, as well as a brief description of the requested permitting action. ➢ Be specific as to the system type, number of homes served, flow allocation required, etc. ➢ If necessary for clarity, include attachments to the application form. C. Application Fee (All New and Major Modification Application Packages): d Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal. ➢ Payable to North Carolina Department of Environmental Quality (NCDEQ) D. Fast Track (Form: FTA 04-16) Application (Required for All Application Packages): ®' Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions, attachments to the application may be made. ❑ If the Applicant Type in Item I.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item I.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. [� The Project Name in Item II.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc. E� The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional En ineer. (The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Paget of 3 E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable): d Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. ➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. ➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. ➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143- 215.67 a . ➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE. F. Site Maps (All Application Packages): Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area and closest surface waters. ➢ Location of the project (gravity sewer, pump stations & force main) ➢ Downstream connection points and permit number (if known) for the receiving sewer 12 Include a street level map (aerial) showing general project area so that Division staff can easily locate it in the field. G. Existing Permit (All Modification Packages): ❑ Submit the most recently issued existing permit. ❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification (i.e., permit description, flow allocation, treatment facility, etc.). H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station): ❑ Per 15A NCAC 02T .0305(h)(I , submit documentation of power reliability for pumping stations. ➢ This alternative is only available for average daily flows less than 15,000 gallons per day ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel are available for distribution and operation of this pump station." ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification) I. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): ❑ Per 15A NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold): ❑ Home/Property Owners' Associations ❑ Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement (FORM: HOA). ❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws. ❑ Developers of lots to be sold ❑ Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement (FORM: DEV). For more information, visit the Division's collection systems website INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 2 of 3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Qualitv Section Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910) 486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704) 663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27699-1628 Granville, Halifax, Johnston, Lee, Nash, (919) 791-4200 Northampton, Orange, Person, Vance, Wake, (919) 788-7159 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven, Water Quality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Fender (910) 796-7215 (910) 350-2004 Fax Winston-Salem Regional Office 450 W. Hanes Mill Road Suite 300 Alamance, Allegheny, Ashe, Caswell, Davidson, Davie, Forsyth, Guilford, Rockingham, Randolph, Water Quality Section Winston-Salem, North Carolina 27105 Stokes, Sorry, Watauga, Wilkes, Yadkin (336) 776-9800 INSTRUCTIONS FOR FORM: FTA 04-I6 & SUPPORTING DOCUMENTATION Page 3 of 3 State of North Carolina Department of Environmental Quality QWR Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Divislon of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: i%�j� (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Neill's Creek Baptist Church (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal ® Other 3. Signature authority's name: Alex Adams per 15A NCAC 02T .0106(b) Title: President 4. Applicant's mailing address: 4200 Neill's Creek Road City: Angier State: NC Zip: 27501- 5. Applicant's contact information: Phone number: (919) 324-9261 Email Address: II. PROJECT INFORMATION: 1. Project name: Neill's Creek Baptist Church Facilities Expansion 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: W000 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Harnett 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.4678' Longitude:-78.7777° 5. Parcel ID (if applicable): 110662-9004 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Mike Stocks License Number: 19843 Firm: Stocks Engineering Mailing address: PO Box 1108 City: Nashville State: NC Zip: 27856- Phone number: (252) 459-8196 Email Address: mstocks@stocksengineering.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: North Harnett Regional Permit Number: NCO021636 Owner Name: Harnett Regional Water V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): FORM: ETA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes []No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEVI been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Propeity Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities 0 Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater : % Domestic/Commercial 100 % Commercial % Industrial (See 15A NCAC 02T .0103(20)) ),Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(8? ❑ Yes ® No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 021.0114(fl) Daily Design Flow ° b No. of Units Flow Church with Kitchen 5 gal/seat 250 1250 GPD gall GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 1250 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0I 14(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 1250 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: ETA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: Neill's Creek Baptist Church 2. Approximate Coordinates (Decimal Degrees): Latitude: 35.4674' Longitude:-78.7769' 3. Design flow of the pump station:.00275 millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): 20 gallons per minute at51 feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 2 280 PE SDR-9 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B). ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ® Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T 0305(fl & (a 2. ➢ 15A NCAC 02T.0305(fl contains minimum separations that shall be provided for sewer systems: ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage s stelps,and interceptor drains 5 feet Any swinimin ,pools 10 feet Finahearth, ade vertical', `:.. 36 inches ➢ 15A NCAC 02T.0365(g) contains alternatives where separations in 02T.0305(fl cannot be achieved. ➢: **Stream'classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 02T.0305 fl or ( ), see Section X of this application lSoes the projecfdomply with separation requirements for wetlands? (50 feet of separation) El Yes ❑ No ® N/A ➢ Sc'e the; Di �rvisio�',Wfaft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer PermittingBranch ranch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 Sewer Project Narrative For Neill's Creek Baptist Church Neill's Creek Baptist Church is located at 4200 Neill's Creek Rd, Angier, NC 27501. The church is proposing an addition with a kitchen area which will generate 1,250 GPD of 100% domestic flow and will utilize a private pump station to pump waste into the existing public force main. Harnett Regional Water owns the public 4" force main which runs along Neill's Creek Rd. The wastewater generated from the site will gravity flow into the wet -well located between the addition and existing church and the lift station will pump the flow through approximately 285 LF of 2" SDR-9 welded polyethylene pipe before passing through a one way check valve at the right-of-way and into the 4" force main. The wastewater treatment plant facility that will be handling this flow is the North Harnett Regional WWTF (Permit # NC 0021636). The permitted flow for the WWTF is 7.5 MGD. State of North Carolina t �s Department of Environmental Quality 5{pjj) �* Division of Water Resources :;ayt Eiji y D1vlston of water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Neill's Creek Baptist Church Project Name for which flow is being requested: Neill's Creek Baptist Fellowship Hall e More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: 1 b. WWTP Facility Permit #: c. WWTP facility's permitted flow Fuquay-Varina Allocated Flow Lillington Allocated Flow Angier Allocated Flow WWTP All flows are in MGD 7.5 MGD 2.60 MGD 1.20 MGD 1.008 MGD d. Estimated obligated flow not yet tributary to the WWTP 1.587 MGD FV Obligated Flow NYT 0.684 MGD Lillington Obligated Flow NYT 0.113 MGD HC Obligated Flow NYT 0.400 MGD Angier Obligated Flow NYT 0.390 MGD e. WWTP facility's actual avg. flow FV Actual Flow Lillington Actual Flow HC Actual Flow Angier Actual Flow f. Total flow for this specific request g. Total actual and obligated flows to the facility FV Actual Avg. + Obligated Flow Lillington Actual Avg. + Obligated Flow HC Actual Avg. + Obligated Flow Angier Actual + Obligated Flow h. Percent of permitted flow used 5.037 MGD 1.288 MGD 0.787 MGD 2.320 MGD 0.642 MGD 0.001 MGD 6.625 MGD 1.972 MGD 0.900 MGD 2.721 MGD 1.032 MGD 88.33% H. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Page 1 of 4 FTSE 06-13 (A) (B) (C) (D)=(B+C) (F)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / pt), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** SLS 15 0.35 0.14 0.023 0.012 0.035 0.105 SLS 9 0.194 0.078 0.055 0.012 0.067 0.011 SLS 120 14.4 5.76 3.021 1.364 4,385 1.375 * The Firm Capacity of any pump station is defined as the mwdmum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the W WTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): North Harnett Regional W WTP Downstream Permit Number: NC0021636 III. Certification Statement: I Steve Ward certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certific ion applies to those items listed above in Sections I and II plus all attached planning assessmyW addendums for which I am the responsible party. Signature of this form indicates acceptanc this wastewater flow. Signing /a - 3 _ 2-0 Page 2 of 4 FTSE 06-13 LILLINU I UN UUAUKANULt NORTH CAROLINA-HARNETT CO. 7.5-MINUTE SERIES PV QV 47'30" 78°45' l00 701 702 2 070 000 FEET Vl[TpRi � 1250 ��� Je50:' � J � __•� . DR 4VHEfLfR_OR 9DRic NATHAN.MAT �,� �J SITE ✓/ J 3� i5a n Ca � �.HARNETT ENTRAL RD \ � o y� 50 DRY LREEN i f 35*30' 3930 3929 630 000 FEET 3925 3927 27'30' 3926 3925 0 0 N I, u GEIV ij LETTER OF TRANSMITTAL / V'V Stocks Engineering, PA PO Box 1108 J. Michael Stocks, PE Nashville, NC 27856 252.903.6891 252.459.8196 To: Stephanie Zorio NCDEQ-DWR 225 Green St. Suite 714 Fayetteville, NC 28384 Phone: 910-433-3322 Overnight Naes Y We are sending you the following: ❑ EC Plans ❑ Prints/Plans ❑ Contracts x Permit Applications These are transmitted as checked below., x For Approval ❑ As Discussed ❑ For Review and Comment DEC 0 4 ZOZO AYC,'TT?EM IJAF9Gt Job No. 2019-058 Job Name: Neill's Creek Baptist Church Date: 12/3120 Sent By: Ethan Averette ❑ Construction Plat ❑ Site Plan Drawings ❑ Computer Disk ❑ Site Work Calculations ❑ ❑ For Your File ❑ As Requested ❑ For Your Signature, then return to: ❑ For Your Use Copies Date Description 2 12/3/20 Fast Track Sewer Application 2 12/3/20 Flow Tracking/Acceptance for Sewer Extension Applications 2 12/3/20 USGS Map with location of site shown 2 12/3/20 Street Map of Surrounding Area 2 12/3/20 Sewer Narrative 1 12/3/20 Permit Fee Check Copies Central Files: APS _ SWP _ 12/22/2020 Permit Number W00042160 Permit Tracking Slip Program Category Status Project Type Non -discharge Active New Project Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer trent.allen Coastal SWRule Permitted Flow 1,250 Version Permit Classification 1.00 Individual Permit Contact Affiliation Facility Facility Name Major/Minor Region Neill's Creek Baptist Church Facilities Expansion Minor Fayetteville Location Address Owner County Harnett Facility Contact Affiliation Owner Name Owner Type Neill's Creek Baptist Church Non -Government Owner Affiliation Alex Adams 4200 Neill's Creek Rd Dates/Events Angier NC 27501 Scheduled Orig Issue App Received Draft Initiated issuance Public Notice Issue Effective Expiration 12/22/2020 12/4/2020 - 12/22/2020 12/22/2020 Regulated Activities Requested /Received Events Wastewater collection Additional information requested Additional information received Outfall Waterbody Name Streamindex Number Current Class Subbasin