HomeMy WebLinkAbout820464_Plan of Action (POA)_20200601 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number. 82-464 County: Sampson Facility Name: 2046 Certified Operator Name: Tommy Honrine Operator Number: AWA1a38a 1. Current liquid level(s)in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 2046 Spillway(Y or N): N Level(inches): 19 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans-of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within:acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III:tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAW MP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon • . freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action,and to the best of my knowledge and ability,the information is accurate and correct. Mu y Bro , L Phone: 910-293-3434 F . © er/ n r(print) , Date: 6/1/2020 Facility Owner/Manager(signature) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 Y HR.STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2546 line m= 2399.4 2. Structure ID: line m= 3. Structure ID: line m= 4. Structure ID: line m 5. Structure ID: line m= 6. Structure ID: line m= • n. Iines1 +2+3+4+5+6= 2399.4 III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAY PERIOD. DO NOT LIST FIELDS.TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 o.tract# p.field# q.crop r.acres s.remaining IRR-t.TOTAL PAN 2 PAN balance BALANCE FOR (Ib/acre) FIELD(lbs.) column rxs 10065 1A Bermuda Hay 5.63 111.59 628.3 10065 1B Bermuda Hay 4.88 189.25 923.5 10065 1 D Bermuda Hay 5.89 74.66 439.7 10065 1E Bermuda Hay 5.50 97.41 535.8 10065 1 F Bermuda Hay 3.98 107.07 426.1 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v.Total PAN available for all fields(sum of column t)= . 2953.4 IV.FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied(line n from section II)= .2399.4 PoA(30 Day)2/21/00 x. Crop's remaining PAN balance(line v from section III)= 2953.4 y. Overall PAN balance(w-x)= -554 Line y must show as a deficit. If line y does not show as_a deficit, list course of action here incl haul,depopulation, herd reduction, etc. For pump&haul and herd reduction options, recalculE on new information. If new fields are to be included as an option for lowering lagoon level,add PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to facility, provide information regarding the herd population and lagoon freeboard levels at the re NARRATIVE: Irrigation onto existing spray fields will continue as weather and field conditions permit.Additior for pumping if needed. PoA(30 Day)2/21/00 'RJ24 lb PAN lb PAN lb PAN lb PAN lb PAN lb PAN lb PAN V DOWN DAY PERIOD. u.application window' Sept-April Sept-April Sept-April Sept-April Sept-April lb.PAN lb. PAN PoA(30 Day)2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): 12546 2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard a. current liquid level according to marker 19.01 b. designed 25 yr./24 hr. storm&structural freeboard 19.3 c. line b-line a(inches in red zone)= 0.3 d. top of dike surface area according to design (area at below structural freeboard elevation) 205275 e. line c/12 x line d x 7.48 gallons/ft' 40946 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 g. volume of waste produced according to structural design 346031 h. current herd# 1 10496 certified herd# 10496 actual waste produced = current herd# x line g = 346031 certified herd# i. volume of wash water according to structural design 0 j. excess rainfall over evaporation according to design 119744 k. (lines h+i+j)x 7.48 x 30 days/line f= 580666 4. Total PAN to be land applied during draw down period I. current waste analysis dated 5/18/2020 3.861 m. ((lines e+k)/1000)x line 1= 2399.4 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA(30 Day)2/21/00