PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 82-443. County: Sampson-_ .
Facility Name: Farm 3514
Certified Operator Name: Graham Lamb Operator Number: AWA26849
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level REGEIVED
in the lagoon to the bottom of the spillway for lagoons with spillways. DEN
VR
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: JUL 15 2099
Spillway(Y or N):
Level(inches): 19 ��R®S
2. Check all applicable items FAYETTEVICI_r �C,�f1i1IA/ OFFICE
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is•reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop .
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP. '
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals-are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility •
3. Earliest possible date to begin land application of waste: as conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action,and to the best of my knowledge and ability,the information is
. accurate and correct. .
'\ Murphy Brown, LLC Phone: 910-293-3434
Facility Owner/Manager(print)
m^
V \\.\(-W J ��� 'C\ S Date: 9/16/2018
Facility Owner/Manager(signature)
, i .
•
•
•
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Lagoon 1_ line m= 1009.1 lb PAN
2. Structure ID: line m= lb PAN
3. Structure ID: line m= lb PAN
4. Structure ID: line m = lb PAN
5. Structure ID: line m-= lb PAN
6. Structure ID: •
line m = lb PAN
n. lines1 +2+3+4+ 5+6= 1009.1 lb PAN
III. TOTAL-PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30.DAY PERIOD.
o. tract# p. field# q. crop r. acres s.remaining IRR-t.TOTAL PAN u.application window'
2 PAN balance BALANCE FOR
(lb/acre) FIELD(lbs.)
column r x s
9 Bermuda 4.06 117.32 476.3 March-Sept
10 Bermuda 3.93 119.08 • 468.0 March-Sept
11 Bermuda. 5.72 . 152.56 872.6 March-Sept •
•
•
•
•
•
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v.Total PAN available for all fields(sum of column t)= :1816.9 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II)= 1009.1 lb. PAN
PoA(30 Day)2/21/00
•
•
x. Crop's remaining PAN balance(line v from section III)= 1816.9 lb. PAN
y. Overall PAN balance(w-x)= _ -808 lb. PAN
c ,
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump& haul and herd reduction options, recalculate new PAN
- based on new information. If new fields are to be included as an option for lowering lagoon level, add these •
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
Irrigation onto existing spray fields will continue as weather and field conditions Permit. Additional land is
available for pumping if needed.
•
•
•
•
PoA(30 Day)2/21/00
}
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier(ID): Lagoon 1
2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard
a. current liquid level according to marker 19.0 inches
b. designed 25 yr:/24 hr. storm &structural freeboard 20.0 inches
c. line b-line,a (inches in red zone)= 1.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 302953 ft2 •
e. line c/12 x lined x 7.48 gallons/ft3 196394 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days ,
g. volume of waste produced according to structural design 415231 ft3
h. current herd# 12595 certified herd# 12595
actual waste produced = current herd# x line g = 415231 ft'
certified herd#
i. volume of wash water according to structural design 0 ft3
j. excess rainfall over evaporation according,to design 176723 ft3
k. (lines h + I+j)x 7.48 x 30 days/line f= 737969 gallons
•
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 8/24/2018 1.08 lbs/1000 gal.
m. ((lines e+ k)/1000)x line I = 1009.1 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
•
•
PoA(30 Day)2/21/00