Loading...
HomeMy WebLinkAbout20100934 Ver 1_401 Application_20101110ADAMS - HEATH ENGINEERING, INC. CIVIL - ENVIRONWFNTAL. ?pAID November 3, 2010 Raleigh Regulatory Field Office NOV 5 2010 US Army Corps of Engineers 6512 Falls of the Neuse Road, Suite 105 DENR WATER QOwTy Raleigh, North Carolina 27615 WEILAhFS MD STORVOTERBR#Cn Re: Mount Airy/ Pilot Mountain Water System Interconnection Project Surry County, North Carolina Dear Sir/ Madam: Please find enclosed the original and one copy of the Pre-Construction Notification for the above referenced project. The project involves water line extensions from the City's existing water system to the Town of Pilot Mountain's water system. Proposed construction includes water line stream crossings at ten (10) locations. By copy of this letter, we are also forwarding five (5) copies to the NC Division of Water Quality and one copy to the NC Wildlife Resources Commission. We included a $240.00 fee payment to NCDWQ for a Minor Water Quality Certification as less than 150 LF of stream will be impacted and we believe that Nationwide Permit 12 would apply and a 401 Certification is not required. The NCWRC is copied due to Surry County's listing as a Trout County. If you have any questions, feel free to call. Sincerely, ADAMS-HEATH ENGINEERING, INC. V?U` [.U Kevin Heath, P.E. cc: NC Division of Water Quality 4401 Reedy Creek Road Raleigh, North Carolina 27607 w/ 5 attachments & $240.00 check North Carolina Wildlife Resources Commission Western Piedmont Regional Coordinator 3855 Idlewild Road Kemersville, North Carolina 27284-9180 w/ 1 attachment Mitch Williams, P.E., City of Mount Airy w/ 1 attachment KH/sct TEL: (276) 236-4588 119 NORTH MAIN STREET FAX: (276) 236-0458 GALAX, VIRGINIA 24333 { ?t100934 0ryWAr?RQc >' L? 1 O lqii? 'c Office Use Only: Corps action ID no. DWQ project no. Form Version 13 Dec 10 2008 Pre-Construction Notification PC Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: El Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 12 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes ® No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ? No For the record only for Corps Permit: ® Yes ? No If. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Mount Airy / Pilot Mountain Water System Interconnection 2b. County: Surry 2c. Nearest municipality / town: Town of Pilot Mountain 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A J 3. Owner Information ? 2 t 3a. Name(s) on Recorded Deed: City of Mount Airy 3b. Deed Book and Page No. N/A S1>;ybq 3c. Responsible Party (for LLC if applicable): Barbara Jones, City Manager 3d. Street address: 300 South Main Street 3e. City, state, zip: Mount Airy, North Carolina 27030 3f. Telephone no.: 336-786-3501 3g. Fax no.: 336-719-7506 3h. Email address: bajones@mountairy.org Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Kevin Heath, P.E. 5b. Business name (if applicable): Adams-Heath Engineering, Inc. 5c. Street address: 119 North Main Street 5d. City, state, zip: Galax, Virginia 24333 5e. Telephone no.: 276-236-4588 5f. Fax no.: 276-236-0458 5g. Email address: kheath@adams-heathinc.com B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): N/A 1 b. Site coordinates (in decimal degrees): Latitude: 36.257858 Longitude: 80.317274 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: N/A acres - linear water line project 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Stoney Creek, Flat Shoal Creek, Toms Creek, and tributaries 2b. Water Quality Classification of nearest receiving water: Class C 2c. River basin: Yadkin 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: All ten (10) sites are water line stream crossings, all of which are adjacent to NCDOT highways. Adjacent properties include highway r/w, farm land, and undeveloped property - all with herbaceous cover. 3b. List the total estimated acreage of all existing wetlands on the property: N/A - linear water line extension adjacent to NCDOT r/w 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: N/A - linear water line extension adjacent to NCDOT r/w 3d. Explain the purpose of the proposed project: Water line stream crossings included in project for interconnection of the City of Mount Airy and Town of Pilot Mountain water systems Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version 3e. Describe the overall project in detail, including the type of equipment to be used: The project involves water line extensions for interconnection of two public water systems. The overall project includes construction of approximately 38,000 LF of 12" and smaller water line and related improvements. Included in the construction will be ten (10) water line stream crossings. Of those crossings, one (1) is to be directionally drilled below streambed without stream encroachment and nine (9) are to be excavated and steel encased below streambed elevation. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ? Yes ® No El Unknown project (including all prior phases) in the past'. Comments: 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final of determination was made. 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ® No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ WS ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 30. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ? P ®T Stream Crossing U.T to Stoney Creek ® PER ? INT ? Corps ® DWQ < 5 10+/- S2 ? P ®T Stream Crossing Stoney Creek ® PER 0 INT ? Corps ® DWQ 15+/- 10+/- S3 ? P ®T Stream Crossing U.T. to Flat Shoal Creek ® PER ? INT ? Corps ® DWQ < 5 10+/- S4 ? P ®T Stream Crossing U.T. to Flat Shoal ® PER ? Corps < 5 10+1 Creek ? INT ® DWQ S5 ? P ®T Stream Crossing U.T. to Flat Shoal ® PER ? Corps 10+/- 10+/ Creek ? INT ® DWQ S6 ? P ® T Stream Crossing U.T. to Flat Shoal ® PER ? Corps < 5 5+/ Creek ? INT ® DWQ S7 ? POT Stream Crossing Flat Shoal Creek ® PER ? INT ? Corps ® DWQ 15+1- 10+/ S8 ? P ® T Stream Crossing U.T. to Toms ® PER ? Corps 10+1- 10+/ Creek ? INT ® DWQ S9 ? P ® T Stream Crossing U.T. to Toms ® PER ? Corps 5+/- 10+/ Creek ? INT ® DWQ S10 ? POT Stream Crossing Toms Creek ® PER ? INT ? Corps ® DWQ 45+/- N/A-0 3h. Total stream and tributary impacts 85 LF +/- 31. Comments: Impact lengths estimated by using a typical 10' width disturbed when crossing streams Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No if yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Suffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require miti ation, then you MUST fill out Section D of this form. 6a. ? Neuse ?Tar-Pamlico ? Other. Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number- Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary impact required? 131 ?P?T ?Yes ? No B2 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 61. Comments: Page 5 of 10 PCN Form -Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The number of stream crossings required has been reduced to the fewest possible. 1 b. Specifcally describe measures taken to avoid or minimize the proposed impacts through construction techniques. The impacts have been minimized by requiring the longest crossing to be directionally drilled with no stream impacts. At the open cut crossings, the Contractor shall use temporary pipe flumes or cofferdams to maintain stream flow during construction, pipe is to be installed inside a steel casing below streambed level, and streambed is to be restored to original contour. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank El Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. NIA Page 6 of 10 PCN Form -Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) -- required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes Z No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: E. Stormwater Management and Diffuse Flow Man (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? 0 Yes Z No 1b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: ? Yes ? No Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0% 2b. Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The project involves water lines installed below grade, so there will be no impact to stormwater volume. Short-term impacts due to construction disturbance to be addressed by implementation of an E& S Control Plan. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local govemmenVs jurisdiction is this project? ? Phase 11 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form -Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ® No Comments: Scoping document has been circulated through SCH, comments received, and final EA is being prepared. No responses received that were of significant concern to the project. 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. The project will interconnect the two public water systems. Water service will be made available to potential customers along the transmission line route, but no significant additional development is anticipated. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The proposed water project area is unsewered, so individual on-site septic systems are used. There are no plans to extend public sewer service to the project area. Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? ? Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NCDENR Division of Natural Resources Planning and Conservation was asked to comment on the project. They indicated three rare species within one mile, but none in the project corridor and none Endangered. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA Web Page for Essential Fish Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC Dept of Cultural Resources was contacted, asked to review project, and responded with "No Comment". 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? &-bawc, A ,)a&e.S 1d. ' Applicant/Agent's Printed Name Applicant/Agent' Signature Date (Agent's signature is valid only if an authorization letter from the applicant 9 ?ac r c is provided.) Page 10 of 10 PCN Form -Version 1.3 December 10, 2008 Version N JY BEI�O�IN\\ OF P../ 2' \W{/„� 4:,: o •, �C^�. fir l' , `• • GIRT/ OF EXISTING ✓ - - q�g� CITY -OF MOUNT ARY• _ •ii d WATER SYSTEM,,^ • rAil r ` 4 - ll • ,eL - ^-� - 5 - '� Cwl+� •Banc', •. __ ,.`T --- n- l.B♦ - ���- I . rh r den W+4 4 +as C Snavna4ae S r L•C RN Ws ' 0.: OM �sea,e RionIn e - .-Ararat' ` END PROP. 12- WATISECcmt e' ru c— - eN P-, — _r_�. = ; • EXISTWG PLOT ° — MOUNTAIN WAT6i _W Wd7ER ANNE STREAM CROSSNVCi 14 R liyl\ p!! ] :lotim. tJ a NT�� • sP \ , ADAMS—HEATH ENGINEERING, INC. MOUNT AIRY/PILOT MOUNTAIN STREAM E CROSSING 74 CIVIL — ENVIRONMENTAL WATER SYSTEM INTERCONNECTION 118 North Mein Street LOCATION Tel: (278)238-4588 Fax: (278)238-0458 Galax, Virginia 24333 SURRY COUNTY, NORTH CAROLINA MAP