Loading...
HomeMy WebLinkAboutSW4201201_(2020.12.10) Coldwater Combined Calc Book_20201221 CIVIL ENGINEERING | ENVIRONMENTAL | SURVEYING | GIS | LANDSCAPE ARCHITECTURE | CONSTRUCTION SERVICES 8642 W. Market Street Suite 136 Greensboro, NC 27409 P 336.662.0411 F 336.662.0420 www.timmons.com STORM DRAINAGE CALCULATIONS Coldwater 8228 Coldwater Road, Stokesdale, NC 27357 Timmons Group Project No. 44636 August 21, 2020 Revised October 9, 2020 Revised October 23, 2020 Revised December 10, 2020 Timmons Group, Inc. 8642 W. Market Street, Suite 136 Greensboro, NC 27409 Phone: (336) 478-3353Fax: (336) 662-0420 NOAA Atlas 14, Volume 2, Version 3 Location name: Stokesdale, North Carolina, USA* Latitude: 36.295°, Longitude: -80.023° Elevation: 797.42 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF_tabular | PF_graphical | Maps_&_aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 4.43 (4.07‑4.82) 5.28 (4.85‑5.75) 6.20 (5.69‑6.76) 6.83 (6.25‑7.42) 7.54 (6.89‑8.18) 8.00 (7.26‑8.69) 8.42 (7.61‑9.14) 8.77 (7.88‑9.55) 9.14 (8.16‑9.97) 9.40 (8.30‑10.3) 10-min 3.54 (3.25‑3.85) 4.22 (3.88‑4.60) 4.96 (4.56‑5.41) 5.46 (5.00‑5.93) 6.01 (5.48‑6.52) 6.37 (5.78‑6.92) 6.69 (6.05‑7.27) 6.95 (6.25‑7.57) 7.24 (6.45‑7.89) 7.40 (6.54‑8.08) 15-min 2.95 (2.71‑3.21) 3.54 (3.25‑3.85) 4.18 (3.84‑4.56) 4.60 (4.22‑5.00) 5.08 (4.63‑5.51) 5.38 (4.88‑5.84) 5.64 (5.10‑6.12) 5.85 (5.26‑6.36) 6.07 (5.41‑6.62) 6.19 (5.47‑6.76) 30-min 2.02 (1.86‑2.20) 2.44 (2.25‑2.66) 2.97 (2.73‑3.24) 3.33 (3.06‑3.62) 3.76 (3.43‑4.08) 4.05 (3.68‑4.40) 4.32 (3.90‑4.69) 4.55 (4.09‑4.95) 4.83 (4.31‑5.27) 5.01 (4.43‑5.47) 60-min 1.26 (1.16‑1.37) 1.53 (1.41‑1.67) 1.91 (1.75‑2.08) 2.17 (1.99‑2.36) 2.50 (2.29‑2.72) 2.74 (2.49‑2.98) 2.97 (2.69‑3.23) 3.19 (2.87‑3.47) 3.47 (3.09‑3.78) 3.66 (3.23‑3.99) 2-hr 0.746 (0.686‑0.816) 0.908 (0.832‑0.992) 1.14 (1.04‑1.24) 1.31 (1.20‑1.43) 1.53 (1.39‑1.67) 1.70 (1.54‑1.85) 1.87 (1.68‑2.03) 2.04 (1.81‑2.21) 2.25 (1.98‑2.45) 2.41 (2.10‑2.63) 3-hr 0.535 (0.492‑0.584) 0.651 (0.600‑0.712) 0.818 (0.751‑0.891) 0.941 (0.862‑1.02) 1.10 (1.00‑1.20) 1.22 (1.11‑1.33) 1.35 (1.21‑1.46) 1.47 (1.31‑1.59) 1.62 (1.43‑1.76) 1.74 (1.52‑1.89) 6-hr 0.329 (0.304‑0.360) 0.399 (0.368‑0.436) 0.500 (0.460‑0.546) 0.578 (0.529‑0.630) 0.684 (0.622‑0.743) 0.768 (0.693‑0.834) 0.854 (0.764‑0.926) 0.942 (0.833‑1.02) 1.06 (0.925‑1.15) 1.16 (0.993‑1.25) 12-hr 0.196 (0.181‑0.215) 0.238 (0.218‑0.261) 0.299 (0.274‑0.327) 0.349 (0.318‑0.380) 0.418 (0.378‑0.454) 0.474 (0.425‑0.513) 0.534 (0.474‑0.577) 0.596 (0.523‑0.644) 0.686 (0.590‑0.741) 0.757 (0.640‑0.819) 24-hr 0.118 (0.109‑0.127) 0.142 (0.132‑0.154) 0.180 (0.166‑0.194) 0.210 (0.194‑0.227) 0.254 (0.233‑0.273) 0.290 (0.264‑0.311) 0.328 (0.298‑0.353) 0.369 (0.332‑0.397) 0.428 (0.382‑0.461) 0.477 (0.421‑0.515) 2-day 0.069 (0.064‑0.074) 0.083 (0.077‑0.089) 0.104 (0.097‑0.112) 0.121 (0.112‑0.130) 0.144 (0.133‑0.155) 0.163 (0.150‑0.175) 0.183 (0.168‑0.197) 0.204 (0.186‑0.220) 0.234 (0.211‑0.252) 0.258 (0.231‑0.279) 3-day 0.049 (0.045‑0.052) 0.059 (0.055‑0.063) 0.073 (0.068‑0.079) 0.085 (0.079‑0.091) 0.102 (0.094‑0.109) 0.115 (0.106‑0.123) 0.129 (0.118‑0.138) 0.144 (0.131‑0.155) 0.165 (0.149‑0.178) 0.182 (0.163‑0.197) 4-day 0.038 (0.036‑0.041) 0.046 (0.043‑0.050) 0.058 (0.054‑0.062) 0.067 (0.063‑0.072) 0.080 (0.074‑0.086) 0.091 (0.084‑0.097) 0.102 (0.094‑0.109) 0.114 (0.104‑0.122) 0.130 (0.118‑0.140) 0.144 (0.129‑0.155) 7-day 0.025 (0.024‑0.027) 0.030 (0.028‑0.032) 0.037 (0.035‑0.040) 0.043 (0.040‑0.045) 0.051 (0.047‑0.054) 0.057 (0.053‑0.061) 0.064 (0.059‑0.068) 0.071 (0.065‑0.075) 0.080 (0.073‑0.086) 0.088 (0.079‑0.095) 10-day 0.020 (0.019‑0.021) 0.024 (0.022‑0.025) 0.029 (0.027‑0.031) 0.033 (0.031‑0.035) 0.039 (0.036‑0.041) 0.043 (0.040‑0.046) 0.048 (0.045‑0.051) 0.053 (0.049‑0.057) 0.060 (0.055‑0.064) 0.065 (0.059‑0.070) 20-day 0.013 (0.013‑0.014) 0.016 (0.015‑0.017) 0.019 (0.018‑0.020) 0.022 (0.020‑0.023) 0.025 (0.023‑0.026) 0.028 (0.026‑0.029) 0.030 (0.028‑0.032) 0.033 (0.031‑0.035) 0.037 (0.034‑0.039) 0.040 (0.036‑0.042) 30-day 0.011 (0.011‑0.012) 0.013 (0.012‑0.014) 0.015 (0.015‑0.016) 0.017 (0.016‑0.018) 0.019 (0.018‑0.020) 0.021 (0.020‑0.022) 0.023 (0.021‑0.024) 0.024 (0.023‑0.026) 0.027 (0.025‑0.028) 0.028 (0.026‑0.030) 45-day 0.009 (0.009‑0.010) 0.011 (0.010‑0.012) 0.013 (0.012‑0.013) 0.014 (0.013‑0.015) 0.016 (0.015‑0.016) 0.017 (0.016‑0.018) 0.018 (0.017‑0.019) 0.019 (0.018‑0.020) 0.021 (0.020‑0.022) 0.022 (0.021‑0.023) 60-day 0.008 (0.008‑0.009) 0.010 (0.009‑0.010) 0.011 (0.011‑0.012) 0.012 (0.012‑0.013) 0.014 (0.013‑0.014) 0.015 (0.014‑0.015) 0.015 (0.015‑0.016) 0.016 (0.015‑0.017) 0.018 (0.016‑0.018) 0.018 (0.017‑0.019) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical Back to Top Maps & aerials Small scale terrain Large scale terrain Large scale map Large scale aerial + – 3km 2mi + – 100km 60mi + – 100km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer + – 100km 60mi Soil Map—Forsyth County, North Carolina (Coldwater - forsyth co ) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/23/2019 Page 1 of 3401010040102004010300401040040105004010600401010040102004010300401040040105004010600585700585800585900586000586100586200586300586400586500586600586700 585700 585800 585900 586000 586100 586200 586300 586400 586500 586600 586700 36° 14' 14'' N 80° 2' 46'' W36° 14' 14'' N80° 2' 5'' W36° 13' 52'' N 80° 2' 46'' W36° 13' 52'' N 80° 2' 5'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 0 200 400 800 1200 Feet 0 50 100 200 300 Meters Map Scale: 1:4,690 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Forsyth County, North Carolina Survey Area Data: Version 19, Sep 16, 2019 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 27, 2015—Oct 16, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map—Forsyth County, North Carolina (Coldwater - forsyth co ) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/23/2019 Page 2 of 3 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI DaA Dan River loam, 0 to 2 percent slopes, frequently flooded 2.2 3.0% FaC Fairview fine sandy loam, 6 to 10 percent slopes 25.5 34.0% FaD Fairview fine sandy loam, 10 to 15 percent slopes 3.6 4.9% FcC2 Fairview clay loam, 6 to 10 percent slopes, moderately eroded 0.1 0.2% FeE3 Fairview clay loam, 10 to 25 percent slopes, severely eroded 3.8 5.1% Gu Gullied land 19.9 26.7% PcF2 Pacolet clay loam, 15 to 45 percent slopes, moderately eroded 4.5 6.0% PoC Poplar Forest fine sandy loam, 6 to 10 percent slopes 0.1 0.2% PpC2 Poplar Forest clay loam, 6 to 10 percent slopes, moderately eroded 8.4 11.2% PpD2 Poplar Forest clay loam, 10 to 15 percent slopes, moderately eroded 5.0 6.7% W Water 1.5 2.0% Totals for Area of Interest 74.8 100.0% Soil Map—Forsyth County, North Carolina Coldwater - forsyth co Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/23/2019 Page 3 of 3 DEED LINE60'R/WR/WOHPOHPOHPXFORSYTH COUNTYGUILFORD COUNTYFORSYTH COUNTYGUILFORD COUNTY20' UTILITY EASEMENTOHPOHPOHP100-YR FLOODPLAIN (ZONE AE) 100-YR FLOODPLAIN (ZONE AE) 24" SYCAMORE DEED LINE60'R/WR/WOHPOHPOHPXFORSYTH COUNTYGUILFORD COUNTYFORSYTH COUNTYGUILFORD COUNTY20' UTILITY EASEMENTOHPOHPOHP100-YR FLOODPLAIN (ZONE AE) 100-YR FLOODPLAIN (ZONE AE) 24" SYCAMORE EP 800.38 EP 800.38 EP 800.11 EP 800.11 EP 800.11 EP 799.70 EP 800.18TW: 799.00 BW: 793.00 TW: 800.48 BW: 794.00 TW: 800.00 BW: 794.00 TW: 838.00 BW: 838.00 TW: 800.16 BW: 796.00 ELLIPTICAL CMP 9.5'X6'INV: 744.27 INLET 28 DRAINAGE AREA = 3.65 AC Q10 = 12.23 CFS Q25 = 13.46 CFS INLET 25 DRAINAGE AREA = 1.10 AC Q10 = 3.98 CFS Q25 = 4.38 CFS INLET 16B DRAINAGE AREA = 3.67 AC Q10 = 14.74 CFS Q25 = 16.23 CFS INLET 11B DRAINAGE AREA = 6.26 AC Q10 = 30.27 CFS Q25 = 33.44 CFS INLET C7 DRAINAGE AREA = 3.13 AC Q10 = 11.42 CFS Q25 = 12.57 CFS INLET 16 DRAINAGE AREA = 0.72 AC Q10 = 2.57 CFS Q25 = 2.83 CFS INLET 18 DRAINAGE AREA = 0.58 AC Q10 = 2.24 CFS Q25 = 2.47 CFS INLET 11 DRAINAGE AREA = 4.01 AC Q10 = 15.64 CFS Q25 = 17.22 CFS INLET 13 DRAINAGE AREA = 0.53 AC Q10 = 2.04 CFS Q25 = 2.24 CFS INLET C4 DRAINAGE AREA = 15.84 AC Q10 = 40.46 CFS Q25 = 44.55 CFS INLET C1 DRAINAGE AREA = 95.07 AC Q10(TR55 METHOD) = 102.71 CFS Q25(TR55 METHOD) = 158.65 CFS INLET 6 DRAINAGE AREA = 4.90 AC Q10 = 19.59 CFS Q25 = 21.57 CFS INLET 8 DRAINAGE AREA = 0.39 AC Q10 = 1.53 CFS Q25 = 1.69 CFS C3.6 POST-DEVELOPMENT DRIANAGE MAPM. MARTIN M. MARTIN R. RINGLER 1" = 150' JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.8642 W. Market Street Suite 136 | Greensboro, NC 27409TEL 336.662.0411 FAX 336.662.0420 www.timmons.comNorth Carolina License No. C-1652THIS DRAWING PREPARED AT THEGREENSBORO OFFICES:\107\44636-Coldwater\DWG\Sheet\CD\C3.6 - DRAN.dwg | Plotted on 10/23/2020 10:03 AM | by Maegan Martin08/21/2020 COLDWATERGUILFORD AND FORSYTH COUNTY - NORTH CAROLINA44636 PRELIMINARY - NOT FOR CONSTRUCTION 10/23/2020 10/09/2020RESUBMITTAL #110/23/2020RESUBMITTAL #20 300' SCALE 1"=150' 150'NAD 83 1S Entrance Culvert Area 2R Entrance Culvert Routing Diagram for Coldwater Culverts Analysis Prepared by {enter your company name here}, Printed 8/7/2020 HydroCAD® 10.00-25 s/n 08663 © 2019 HydroCAD Software Solutions LLC Subcat Reach Pond Link Coldwater Culverts Analysis Printed 8/7/2020Prepared by {enter your company name here} Page 2HydroCAD® 10.00-25 s/n 08663 © 2019 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres) CN Description (subcatchment-numbers) 1.830 95 (1S) 93.240 65 Woods/grass comb., Fair, HSG B (1S) 95.070 66 TOTAL AREA Coldwater Culverts Analysis Printed 8/7/2020Prepared by {enter your company name here} Page 3HydroCAD® 10.00-25 s/n 08663 © 2019 HydroCAD Software Solutions LLC Soil Listing (all nodes) Area (acres) Soil Group Subcatchment Numbers 0.000 HSG A 93.240 HSG B 1S 0.000 HSG C 0.000 HSG D 1.830 Other 1S 95.070 TOTAL AREA Coldwater Culverts Analysis Printed 8/7/2020Prepared by {enter your company name here} Page 4HydroCAD® 10.00-25 s/n 08663 © 2019 HydroCAD Software Solutions LLC Ground Covers (all nodes) HSG-A (acres) HSG-B (acres) HSG-C (acres) HSG-D (acres) Other (acres) Total (acres) Ground Cover Subcatchment Numbers 0.000 0.000 0.000 0.000 1.830 1.830 1S 0.000 93.240 0.000 0.000 0.000 93.240 Woods/grass comb., Fair 1S 0.000 93.240 0.000 0.000 1.830 95.070 TOTAL AREA Type II 24-hr 25-yr Rainfall=6.09"Coldwater Culverts Analysis Printed 8/7/2020Prepared by {enter your company name here} Page 5HydroCAD® 10.00-25 s/n 08663 © 2019 HydroCAD Software Solutions LLC Time span=5.00-150.00 hrs, dt=0.05 hrs, 2901 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=95.070 ac 0.00% Impervious Runoff Depth=2.51"Subcatchment 1S: Entrance Culvert Area Flow Length=3,777' Tc=39.7 min CN=66 Runoff=165.54 cfs 19.863 af Inflow=165.54 cfs 19.863 afReach 2R: Entrance Culvert Outflow=165.54 cfs 19.863 af Total Runoff Area = 95.070 ac Runoff Volume = 19.863 af Average Runoff Depth = 2.51" 100.00% Pervious = 95.070 ac 0.00% Impervious = 0.000 ac Type II 24-hr 25-yr Rainfall=6.09"Coldwater Culverts Analysis Printed 8/7/2020Prepared by {enter your company name here} Page 6HydroCAD® 10.00-25 s/n 08663 © 2019 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Entrance Culvert Area Runoff = 165.54 cfs @ 12.38 hrs, Volume= 19.863 af, Depth= 2.51" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-150.00 hrs, dt= 0.05 hrs Type II 24-hr 25-yr Rainfall=6.09" Area (ac) CN Description 93.240 65 Woods/grass comb., Fair, HSG B * 1.830 95 95.070 66 Weighted Average 95.070 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.9 300 0.0433 0.30 Sheet Flow, Sheet flow Grass: Short n= 0.150 P2= 3.38" 19.6 1,477 0.0630 1.25 Shallow Concentrated Flow, Shallow COnc flow Woodland Kv= 5.0 fps 3.2 2,000 0.0250 10.34 452.03 Channel Flow, Stream Area= 43.7 sf Perim= 18.7' r= 2.34' n= 0.040 Winding stream, pools & shoals 39.7 3,777 Total Subcatchment 1S: Entrance Culvert Area Runoff Hydrograph Time (hours) 1501451401351301251201151101051009590858075706560555045403530252015105Flow (cfs)180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 25-yr Rainfall=6.09" Runoff Area=95.070 ac Runoff Volume=19.863 af Runoff Depth=2.51" Flow Length=3,777' Tc=39.7 min CN=66 165.54 cfs Type II 24-hr 25-yr Rainfall=6.09"Coldwater Culverts Analysis Printed 8/7/2020Prepared by {enter your company name here} Page 7HydroCAD® 10.00-25 s/n 08663 © 2019 HydroCAD Software Solutions LLC Summary for Reach 2R: Entrance Culvert [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 95.070 ac, 0.00% Impervious, Inflow Depth = 2.51" for 25-yr event Inflow = 165.54 cfs @ 12.38 hrs, Volume= 19.863 af Outflow = 165.54 cfs @ 12.38 hrs, Volume= 19.863 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-150.00 hrs, dt= 0.05 hrs Reach 2R: Entrance Culvert Inflow Outflow Hydrograph Time (hours) 150140130120110100908070605040302010Flow (cfs)180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=95.070 ac 165.54 cfs 165.54 cfs Type II 24-hr 100-yr Rainfall=7.61"Coldwater Culverts Analysis Printed 8/7/2020Prepared by {enter your company name here} Page 8HydroCAD® 10.00-25 s/n 08663 © 2019 HydroCAD Software Solutions LLC Time span=5.00-150.00 hrs, dt=0.05 hrs, 2901 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=95.070 ac 0.00% Impervious Runoff Depth=3.69"Subcatchment 1S: Entrance Culvert Area Flow Length=3,777' Tc=39.7 min CN=66 Runoff=248.70 cfs 29.237 af Inflow=248.70 cfs 29.237 afReach 2R: Entrance Culvert Outflow=248.70 cfs 29.237 af Total Runoff Area = 95.070 ac Runoff Volume = 29.237 af Average Runoff Depth = 3.69" 100.00% Pervious = 95.070 ac 0.00% Impervious = 0.000 ac Type II 24-hr 100-yr Rainfall=7.61"Coldwater Culverts Analysis Printed 8/7/2020Prepared by {enter your company name here} Page 9HydroCAD® 10.00-25 s/n 08663 © 2019 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Entrance Culvert Area Runoff = 248.70 cfs @ 12.37 hrs, Volume= 29.237 af, Depth= 3.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-150.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.61" Area (ac) CN Description 93.240 65 Woods/grass comb., Fair, HSG B * 1.830 95 95.070 66 Weighted Average 95.070 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.9 300 0.0433 0.30 Sheet Flow, Sheet flow Grass: Short n= 0.150 P2= 3.38" 19.6 1,477 0.0630 1.25 Shallow Concentrated Flow, Shallow COnc flow Woodland Kv= 5.0 fps 3.2 2,000 0.0250 10.34 452.03 Channel Flow, Stream Area= 43.7 sf Perim= 18.7' r= 2.34' n= 0.040 Winding stream, pools & shoals 39.7 3,777 Total Subcatchment 1S: Entrance Culvert Area Runoff Hydrograph Time (hours) 1501451401351301251201151101051009590858075706560555045403530252015105Flow (cfs)260 240 220 200 180 160 140 120 100 80 60 40 20 0 Type II 24-hr 100-yr Rainfall=7.61" Runoff Area=95.070 ac Runoff Volume=29.237 af Runoff Depth=3.69" Flow Length=3,777' Tc=39.7 min CN=66 248.70 cfs Type II 24-hr 100-yr Rainfall=7.61"Coldwater Culverts Analysis Printed 8/7/2020Prepared by {enter your company name here} Page 10HydroCAD® 10.00-25 s/n 08663 © 2019 HydroCAD Software Solutions LLC Summary for Reach 2R: Entrance Culvert [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 95.070 ac, 0.00% Impervious, Inflow Depth = 3.69" for 100-yr event Inflow = 248.70 cfs @ 12.37 hrs, Volume= 29.237 af Outflow = 248.70 cfs @ 12.37 hrs, Volume= 29.237 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-150.00 hrs, dt= 0.05 hrs Reach 2R: Entrance Culvert Inflow Outflow Hydrograph Time (hours) 150140130120110100908070605040302010Flow (cfs)260 240 220 200 180 160 140 120 100 80 60 40 20 0 Inflow Area=95.070 ac 248.70 cfs 248.70 cfs Type II 24-hr 25-yr Rainfall=6.09"Coldwater Culverts Analysis-Buried 1' Printed 12/10/2020Prepared by {enter your company name here} HydroCAD® 10.00-25 s/n 08663 © 2019 HydroCAD Software Solutions LLC Summary for Reach 3R: New Arch Culvert - Buried 1' [52] Hint: Inlet/Outlet conditions not evaluated [55] Hint: Peak inflow is 103% of Manning's capacity Inflow Area = 95.070 ac, 0.00% Impervious, Inflow Depth = 2.51" for 25-yr event Inflow = 165.54 cfs @ 12.38 hrs, Volume= 19.863 af Outflow = 165.44 cfs @ 12.38 hrs, Volume= 19.863 af, Atten= 0%, Lag= 0.1 min Routing by Stor-Ind+Trans method, Time Span= 5.00-150.00 hrs, dt= 0.05 hrs Max. Velocity= 7.83 fps, Min. Travel Time= 0.1 min Avg. Velocity = 2.97 fps, Avg. Travel Time= 0.2 min Peak Storage= 762 cf @ 12.38 hrs Average Depth at Peak Storage= 4.35' above invert (3.35' above fill) Bank-Full Depth= 5.08' above invert (4.08' above fill) Flow Area= 23.4 sf, Capacity= 160.94 cfs 84.0" W x 61.0" H, R=43.0"/92.3" Pipe Arch Pipe w/ 12.0" inside fill n= 0.025 Corrugated metal Length= 36.0' Slope= 0.0100 '/' (101 Elevation Intervals) Inlet Invert= 746.26', Outlet Invert= 745.90' Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Friday, Aug 7 2020 C4 Analysis - 25 YR Invert Elev Dn (ft) = 759.29 Pipe Length (ft) = 100.25 Slope (%) = 2.70 Invert Elev Up (ft) = 762.00 Rise (in) = 36.0 Shape = Circular Span (in) = 36.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Square edge w/headwall (C) Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 771.00 Top Width (ft) = 50.00 Crest Width (ft) = 0.00 Calculations Qmin (cfs) = 44.55 Qmax (cfs) = 44.55 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 44.55 Qpipe (cfs) = 44.55 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 6.87 Veloc Up (ft/s) = 8.13 HGL Dn (ft) = 761.88 HGL Up (ft) = 764.17 Hw Elev (ft) = 765.55 Hw/D (ft) = 1.18 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Friday, Oct 23 2020 C7 Analysis - 25 YR Invert Elev Dn (ft) = 806.15 Pipe Length (ft) = 113.47 Slope (%) = 2.51 Invert Elev Up (ft) = 809.00 Rise (in) = 24.0 Shape = Circular Span (in) = 24.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Square edge w/headwall (C) Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 815.00 Top Width (ft) = 50.00 Crest Width (ft) = 0.00 Calculations Qmin (cfs) = 12.57 Qmax (cfs) = 12.57 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 12.57 Qpipe (cfs) = 12.57 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 4.57 Veloc Up (ft/s) = 5.95 HGL Dn (ft) = 807.79 HGL Up (ft) = 810.27 Hw Elev (ft) = 810.96 Hw/D (ft) = 0.98 Flow Regime = Inlet Control Pipe Identifier:10 Pipe Size (in):24 Outlet Flow (cfs):21 Is flow < Qmin?YES d50 (ft):0.25 Thickness (in):7 La (ft):8 W (ft):10 3Do (ft):6 RIP-RAP SIZING FOR PIPE FLOWS BELOW Q MIN W La 3Do Flow Pipe Identifier 15 Pipe Size (in):36 Outlet Flow (cfs):29.1 Is flow < Qmin?YES d50 (ft):0.6 Thickness (in):16 La (ft):20 W (ft):23 3Do (ft):9 RIP-RAP SIZING FOR PIPE FLOWS BELOW Q MIN W La 3Do Flow Pipe Identifier:20 Pipe Size (in):24 Outlet Flow (cfs):19.56 Is flow < Qmin?YES d50 (ft):0.25 Thickness (in):7 La (ft):8 W (ft):10 3Do (ft):6 RIP-RAP SIZING FOR PIPE FLOWS BELOW Q MIN W La 3Do Flow Pipe Identifier:27 Pipe Size (in):24 Outlet Flow (cfs):3.98 Is flow < Qmin?YES d50 (ft):0.25 Thickness (in):7 La (ft):8 W (ft):10 3Do (ft):6 RIP-RAP SIZING FOR PIPE FLOWS BELOW Q MIN W La 3Do Flow Pipe Identifier:30 Pipe Size (in):24 Outlet Flow (cfs):12.23 Is flow < Qmin?YES d50 (ft):0.25 Thickness (in):7 La (ft):8 W (ft):10 3Do (ft):6 RIP-RAP SIZING FOR PIPE FLOWS BELOW Q MIN W La 3Do Flow Pipe Identifier 15 Pipe Size (in):36 Outlet Flow (cfs):29.1 Is flow < Qmin?YES d50 (ft):0.6 Thickness (in):16 La (ft):20 W (ft):23 3Do (ft):9 RIP-RAP SIZING FOR PIPE FLOWS BELOW Q MIN W La 3Do Flow Pipe Identifier:C9 Pipe Size (in):24 Outlet Flow (cfs):12.57 Is flow < Qmin?YES d50 (ft):0.25 Thickness (in):7 La (ft):8 W (ft):10 3Do (ft):6 RIP-RAP SIZING FOR PIPE FLOWS BELOW Q MIN W La 3Do Flow Okay 5.97 Disturbed Area (Acres) 25.83 Peak Flow from 10-year Storm (cfs) 10746 Required Volume ft3 8395 Required Surface Area ft2 64.8 Suggested Width ft 129.6 Suggested Length ft 65 Trial Top Width at Spillway Invert ft 130 Trial Top Length at Spillway Invert ft 3 Trial Side Slope Ratio Z:1 3 Trial Depth ft (2 to 3.5 feet above grade) 47 Bottom Width ft 112 Bottom Length ft 5264 Bottom Area ft2 20409 Actual Volume ft3 Okay 8450 Actual Surface Area ft2 Okay 25 Trial Weir Length ft 0.5 Trial Depth of Flow ft 26.5 Spillway Capacity cfs Okay 2.5 Skimmer Size (inches) Skimmer Size 0.208 Head on Skimmer (feet) (Inches) 1.75 Orifice Size (1/4 inch increments) 1.5 3.33 Dewatering Time (days) 2 Suggest about 3 days 2.5 3 4 5 6 8 Skimmer Basin 1 -Phase 2 Okay 2.3 Disturbed Area (Acres) 16.63 Peak Flow from 10-year Storm (cfs) 4140 Required Volume ft3 5405 Required Surface Area ft2 52.0 Suggested Width ft 104.0 Suggested Length ft 52 Trial Top Width at Spillway Invert ft 104 Trial Top Length at Spillway Invert ft 3 Trial Side Slope Ratio Z:1 2 Trial Depth ft (2 to 3.5 feet above grade) 40 Bottom Width ft 92 Bottom Length ft 3680 Bottom Area ft2 9040 Actual Volume ft3 Okay 5408 Actual Surface Area ft2 Okay 20 Trial Weir Length ft 0.5 Trial Depth of Flow ft 21.2 Spillway Capacity cfs Okay 2 Skimmer Size (inches) Skimmer Size 0.167 Head on Skimmer (feet) (Inches) 1.25 Orifice Size (1/4 inch increments) 1.5 2.81 Dewatering Time (days) 2 Suggest about 3 days 2.5 3 4 5 6 8 Skimmer Basin 2 Okay 4.26 Disturbed Area (Acres) 22.74 Peak Flow from 10-year Storm (cfs) 7668 Required Volume ft3 7391 Required Surface Area ft2 60.8 Suggested Width ft 121.6 Suggested Length ft 63 Trial Top Width at Spillway Invert ft 120 Trial Top Length at Spillway Invert ft 3 Trial Side Slope Ratio Z:1 3 Trial Depth ft (2 to 3.5 feet above grade) 45 Bottom Width ft 102 Bottom Length ft 4590 Bottom Area ft2 18063 Actual Volume ft3 Okay 7560 Actual Surface Area ft2 Okay 25 Trial Weir Length ft 0.5 Trial Depth of Flow ft 26.5 Spillway Capacity cfs Okay 2 Skimmer Size (inches) Skimmer Size 0.167 Head on Skimmer (feet) (Inches) 1.5 Orifice Size (1/4 inch increments) 1.5 3.61 Dewatering Time (days) 2 Suggest about 3 days 2.5 3 4 5 6 8 Skimmer Basin 3 Okay 5.68 Disturbed Area (Acres) 15.5 Peak Flow from 10-year Storm (cfs) 10224 Required Volume ft3 5038 Required Surface Area ft2 50.2 Suggested Width ft 100.4 Suggested Length ft 56 Trial Top Width at Spillway Invert ft 106 Trial Top Length at Spillway Invert ft 3 Trial Side Slope Ratio Z:1 3 Trial Depth ft (2 to 3.5 feet above grade) 38 Bottom Width ft 88 Bottom Length ft 3344 Bottom Area ft2 13758 Actual Volume ft3 Okay 5936 Actual Surface Area ft2 Okay 15 Trial Weir Length ft 0.5 Trial Depth of Flow ft 15.9 Spillway Capacity cfs Okay 2 Skimmer Size (inches) Skimmer Size 0.167 Head on Skimmer (feet) (Inches) 2 Orifice Size (1/4 inch increments) 1.5 2.71 Dewatering Time (days) 2 Suggest about 3 days 2.5 3 4 5 6 8 Skimmer Basin 4 - Phase 2 Okay 2.36 Disturbed Area (Acres) 7.94 Peak Flow from 10-year Storm (cfs) 4248 Required Volume ft3 2581 Required Surface Area ft2 35.9 Suggested Width ft 71.8 Suggested Length ft 45 Trial Top Width at Spillway Invert ft 90 Trial Top Length at Spillway Invert ft 3 Trial Side Slope Ratio Z:1 2 Trial Depth ft (2 to 3.5 feet above grade) 33 Bottom Width ft 78 Bottom Length ft 2574 Bottom Area ft2 6576 Actual Volume ft3 Okay 4050 Actual Surface Area ft2 Okay 15 Trial Weir Length ft 0.5 Trial Depth of Flow ft 15.9 Spillway Capacity cfs Okay 1.5 Skimmer Size (inches) Skimmer Size 0.125 Head on Skimmer (feet) (Inches) 1.25 Orifice Size (1/4 inch increments) 1.5 3.33 Dewatering Time (days) 2 Suggest about 3 days 2.5 3 4 5 6 8 Skimmer Basin 5 Okay 3.16 Disturbed Area (Acres) 8.63 Peak Flow from 10-year Storm (cfs) 5688 Required Volume ft3 2805 Required Surface Area ft2 37.4 Suggested Width ft 74.9 Suggested Length ft 45 Trial Top Width at Spillway Invert ft 90 Trial Top Length at Spillway Invert ft 3 Trial Side Slope Ratio Z:1 2 Trial Depth ft (2 to 3.5 feet above grade) 33 Bottom Width ft 78 Bottom Length ft 2574 Bottom Area ft2 6576 Actual Volume ft3 Okay 4050 Actual Surface Area ft2 Okay 10 Trial Weir Length ft 0.5 Trial Depth of Flow ft 10.6 Spillway Capacity cfs Okay 1.5 Skimmer Size (inches) Skimmer Size 0.125 Head on Skimmer (feet) (Inches) 1.5 Orifice Size (1/4 inch increments) 1.5 3.10 Dewatering Time (days) 2 Suggest about 3 days 2.5 3 4 5 6 8 Skimmer Basin 6 Okay 1.72 Disturbed Area (Acres) 4.7 Peak Flow from 10-year Storm (cfs) 3096 Required Volume ft3 1528 Required Surface Area ft2 27.6 Suggested Width ft 55.3 Suggested Length ft 30 Trial Top Width at Spillway Invert ft 60 Trial Top Length at Spillway Invert ft 3 Trial Side Slope Ratio Z:1 3 Trial Depth ft (2 to 3.5 feet above grade) 12 Bottom Width ft 42 Bottom Length ft 504 Bottom Area ft2 3294 Actual Volume ft3 Okay 1800 Actual Surface Area ft2 Okay 10 Trial Weir Length ft 0.5 Trial Depth of Flow ft 10.6 Spillway Capacity cfs Okay 1.5 Skimmer Size (inches) Skimmer Size 0.125 Head on Skimmer (feet) (Inches) 1.25 Orifice Size (1/4 inch increments) 1.5 2.43 Dewatering Time (days) 2 Suggest about 3 days 2.5 3 4 5 6 8 Skimmer Basin 7