HomeMy WebLinkAbout310852_Compliance Evaluation Inspection_20201222� ivision of Water Resources
Facility Number - 0 Division of Soil and Water Conservation
0 Other Agency
Type of Visit: QjCompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: ((Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: EIHIM
Arrival Time: ��t7(xt,
Departure Time:, -
County:
Farm Name: Ica'Sit">
ALaz=61Owner
Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative:
Title:
Certified Operator: h(y G & [�- At.,W
Back-up Operator:
Location of Farm:
Swine
Wean to I
Wean to I
Feeder m
Farrow to
Farrow to
Farrow to
Boars
Other
Phone:
Phone:
Integrator:
Certification Number:
Certification Number:
Latitude: Longitude:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
!Mayer
a er
i) Non -La er
Design Current
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Region: U —0
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes � No ❑ NA ❑ NE
❑ Yes [:]No
❑ Yes [—]No
❑ Yes ❑ No
❑ Yes ® No
❑ Yes No
❑NA ❑NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
Page I of 3 511212020 Continued
Facility Number: Date of Inspection: —
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
jrn No
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
[ j No
❑ NA
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5
Structure
6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health
or environmental
threat, notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes
P No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
❑ No
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes
X No
❑ NA
ONE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
®No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes
N No
❑ NA
❑ NE
❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals
(Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate
Manure/Sludge
into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application
Outside of Approved
Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
[Z No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
P No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
� No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
F�] No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
14 No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
(4 No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
® No
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements
❑Other
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes
� No
❑ NA
❑ NE
❑Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather
Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
❑ Yes
® No
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment'?
❑ Yes
1� No
❑ NA
❑ NE
Page 2 of 3
511212020 Continued
Facility Number: iDate of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check Yes ❑ No
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ NA ❑ NE
❑NA ❑NE
Non -compliant sludge levels in any lagoon I
List structure(s) and date of first survey indicating non-compliance: l — LI ) ,��iia-�,�,tr W� I-
}; 1900
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No r71 NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes 5j No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29.
At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
No
❑ NA
❑ NE
If yes, contact a regional Air Quality representative immediately.
30.
Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
No
❑ NA
❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31.
Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
❑ No
❑ NA
� NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32.
Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
�D No
❑ NA
❑ NE
33.
Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
No
❑ NA
❑ NE
34.
Does the facility require a follow-up visit by the same agency?
❑ Yes
No❑
NA
❑ NE
(Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
Sf�J J(� w� �]� PAN
-` w ( (�k 4rL tLk9 � (�.�t
�`iC� _M'C.Q_ CAP ` PA V ofp& eC Q n ` b , C(t
Reviewer/Inspector Name: vQ /1 U� Phone: 0
1
Reviewer/Inspector Signature: Date: l I/
Page 3 of 3 ^ 511212020