Loading...
HomeMy WebLinkAbout820406_Inspection_20200731 0-Division of Water Resources ..sbni 5 g f1,/' '� J 2 Facility Number i,.� l- a 0 Division of Soil and Water Conservation �"l� 0 Other Agency 0 Type of Visit: acompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 utine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access r Date of Visit: IMEMZO Arrival Time: /A 16.f�[1 Departure Time: l �10 County: S 4'�.5 rl/ Region: ,/A', Farm Name: l� `e `t✓ ff 1`1-c' L Owner Email: Owner Name: v t 1k "(II- t_ as C'e✓►'`� Phone: Mailing Address: , Physical Address: 1 Facility Contact: i)ii//l`S ( tV� Title: Phone: Onsite Representative: 1( Integrator: ` i"0-4- /2- Certified Operator: V tv eyv - Pew `C,7 5e/ Certification Number: /i V 8'ZU Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish Layer Dairy Cow - Wean to Feeder Non-Layer Dairy Calf Feeder to Finish L(,Sg W Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy . - Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other Discharges and Stream Impacts 1.Is any discharge observed from any part of the operation? ❑ Yes ❑ No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2.Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ No ❑ NA ❑ NE 3.Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 2/4/2015 Continued Facility Number: Z -41 6 Date of Inspection: 31 3-1 2r 2 Waste Collection&Treatment ) 4.Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes —❑ NA ❑ NE a.If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard(in): Observed Freeboard(in): Z - 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes o ❑ NA ❑ NE (i.e.,large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes []'lam ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat,notify DWR 7.Do any of the structures need maintenance or improvement? ❑ Yes [_Pda' ❑ NA ❑ NE 8.Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9.Does any part of the waste management system other than the waste structures require ❑ Yes 1-4-NO ❑ NA ❑ NE maintenance or improvement? Waste Application 10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes O-Nrr ❑ NA ❑NE maintenance or improvement? 11.Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes ❑o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area !� 12. Crop Type(s): �&v P 13. Soil Type(s): 14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes l-N�o ❑ NA ❑ NE 15.Does the receiving crop and/or land application site need improvement? ❑ Yes 0NO ❑ NA ❑ NE 16.Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes 0' ❑ NA ❑ NE acres determination? 17.Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes V v ❑ NA ❑ NE Required Records&Documents 19.Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes ❑.PQo ❑ NA ❑ NE 20.Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes '" ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21.Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes �o ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1"Rainfall Inspections Sludge Survey 22.Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23.If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 07No ❑ NA ❑ NE Page 2 of 3 2/4/2015 Continued Facility Number: eo'Z.- 06 Date of Inspection: 3(,Vy l 24.Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [Os- ❑ NA ❑ NE 25.Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes 0 ❑ NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ['Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26.Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes EkKii ❑ NA ❑ NE 27.Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes 1-N15 ❑ NA ❑ NE Other Issues 28.Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ ❑ NA ❑ NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30.Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ NA ❑ NE permit?(i.e., discharge,freeboard problems,over-application) 31.Do subsurface tile drains exist at the facility? If yes,check the appropriate box below. ❑ Yes 0 ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes L o ❑ NA ❑ NE 33.Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes 0 ❑ NA ❑ NE 34.Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA ❑ NE Comments(refer to question#):Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). CAA 16 + e 67-)..6—/ 7l-4-o 6 IC( 6-- 3, 0 P (60 f070 c R,0 VION r-csopk tecx 00N 1 -mt 0A, PC c4- Gu( Reviewer/Inspector Name: 6 l II 'V mi a p Phone:et(0 (13 3"o 3c( Reviewer/Inspector Signature: \� t v(A,2110 Date: [A i L �O Page 3 of 3 2/4/2a15