Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG030246_DMR_20200515
Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 5/15/2020 CERTIFICATE OF COVERAGE NO. NCGO3 0 2 4 6 SAMPLE COLLECTION YEAR 2020-Monthly(April) FACILITY NAME Hickory Manufacturing and Technology Center SAMPLE PERIOD ❑Jan-June ❑July-Dec COUNTY Catawba or Q Monthly' (month) PERSON COLLECTING SAMPLES Steve Street RE "`piVED DISCHARGING TO CLASS ❑ORW _HQW *Trout ❑PNA LABORATORY Water Tech Labs Lab Cert.# 50 *Zero-flow Water Supply nSA Comments on sample collection or analysis: JUN 1 6 2020 *Other C Monthly sample rN_i;"kf',,' f-ILE�; PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DWR SECTIO1J Part A: Stormwater Benchmarks and Monitoring Results 1 I No discharge this period?2 Non-Polar O&G/ Date Sample 24-hour rainfall pH, Total Toxic Outfall No. Collected) amount, Total Suspended Solids Standard units Total Copper Total Lead Total Zinc Total Petroleum Organics (mo/dd/yr) Inches3 Hydrocarbons Benchmarks _ - 100 mg/L or 50 mg/L4 6.0—9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141 SDO 3 4/20/20 .82 19.3 6.61 .014 <.005 .529 <5.6 N/A SDO 5 4/20/20 .82 22.0 6.56 .014 <.005 .095 <5.6 N/A 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Section B,Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 'Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample(for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." N/A Name(Print name) N/A Title(Print title) Signature Date Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non-detect, ND, or other similar non-numerical format. When results are below the applicable limits,they must be reported in the format, "<XX mg/L",where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. No discharge this period?2 Outfall No. Date Sample Collected' 24-hour rainfall amount, New Motor Oil or Non-Polar O&G/Total Total Suspended (mo/dd/yr) Inches' Hydraulic Oil Usage Petroleum Hydrocarbons Solids Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/L4 Parameter Code - 46529 NCOIL 00552 C0530 Footnotes from Part A also apply to Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES d NO❑ IF YES,HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES d NO❑ REGIONAL OFFICE CONTACT NAME: Mr.James Moore and Mr.Zahid Khan Mail an original copy of this DMR,including all"No Discharge"reports,within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations." Signature of Permittee Date Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 3 of 3 ;HRTERV TECH LABS.Inc. POST OFFICE BOX 1056 • #5 PINEWOOD PLAZA DR. GRANITE FALLS, NORTH CAROLINA 28630 (828)396-4444 SAMPLE: Corning Optical(003) COLLECTION DATE: 4/20/2020 PERMIT#: COLLECTION TIME: 13:29 ADDRESS: Corning Optical RECEIVED DATE: 4/20/2020 P.O. Box 489 RECEIVED TIME: 09:29 Hickory, NC 28603-0489 REPORTED: 5/14/2020 ANALYSIS ANALYSIS RESULTS UNITS DATE ANALYST Lead <0.005 mg/L 4/30/20 TSS 19.3 mg/L 4/21/20 jrg Copper 0.014 mg/L 4/30/20 Zinc 0.529 mg/L 4/30/20 Oil&Grease <5.6 mg/L 4/24/20 jdg LOG ID: 2004-282 REPORTED BY: NC CERTIFIED LAB #50 1;610611/ Tony Gragg, Lab Supervisor L4RTERV TECH LABS in:. POST OFFICE BOX 1056 • #5 PINEWOOD PLAZA DR. GRANITE FALLS, NORTH CAROLINA 28630 (828)396-4444 SAMPLE: Corning Optical (005) COLLECTION DATE: 4/20/2020 PERMIT#: COLLECTION TIME: 13:18 ADDRESS: Corning Optical RECEIVED DATE: 4/20/2020 P.O. Box 489 RECEIVED TIME: 09:29 Hickory, NC 28603-0489 REPORTED: 5/14/2020 ANALYSIS ANALYSIS RESULTS UNITS DATE ANALYST Lead <0.005 mg/L 4/30/20 TSS 22.0 mg/L 4/21/20 jrg Copper 0.014 mg/L 4/30/20 Zinc 0.095 mg/L 4/30/20 Oil&Grease <5.6 mg/L 4/24/20 jdg LOG ID: 2004-283 REPORTED BY: NC CERTIFIED LAB #50 fC*;01111 Tony Gragg,Lab Supervisor t r... Y= RESEARCh ANAlyTICAI Report of Analysis LAbORATORIES, INC, 5/6/2020 toisltil/ti,1 For: Water Tech Labs, Inc. .�� G 0 c • P.O. Box 1056 • iu;'. . . -, Granite Falls, NC 28630 ` °C .o °',to NC 434 Z•• ▪ . NC#37701 j ii Attn: Joe Gragg :• ' ,� : '.ie 4�7ED�ANts;``� Client Sample ID: Corning-003 Lab Sample ID: 81369-03 Site: water Tech Collection Date: 4/20/2020 13:30 Parameter Method Result Units Rep Limit Analyst Analysis Date/Time Copper,Total EPA 200.8 0.014 mg/L 0.001 SK 4/30/2020 Lead,Total EPA 200.8 <0.005 mg/L 0.005 SK 4/30/2020 Zinc,Total EPA 200.8 0.529 mg/L 0.01 SK 4/30/2020 i,JA =not analyzed P.O. Box 473 106 Short Street Kernersville, North Carolina 27284 Tel: 336-996-2841 Fax: 336-996-0326 www.randalabs.com Page 1 • I ' • RESEARCh & ANALyTDCAl Report of Analysis LABORATORIES, INC. 5/6/2020 tttttllll,,' For: Water Tech Labs, Inc. ,�. ••'''''�' ''..,q� +, P.O. Box 1056 " ' ' ''��r o`er A': Granite Falls, NC 28630 i" c* NC#34 ZI f : NC#37701 Attn: Joe Gragg : %.., �, ; ItiliIII' Client Sample ID: Corning-005 Lab Sample ID: 81369-04 Site: water Tech Collection Date: 4/20/2020 13:18 Parameter Method Result Units Rep Limit Analyst Analysis Date/Time Copper,Total EPA 200.8 0.014 mg/L 0.001 SK 4/30/2020 Lead,Total EPA 200.8 <0.005 mg/L 0.005 SK 4/30/2020 Zinc,Total EPA 200.8 0.095 mg/L 0.01 SK 4/30/2020 NA =not analyzed P.O.Box 473 106 Short Street Kernersville, North Carolina 27284 Tel: 336-996-2841 Fax: 336-996-0326 www.randalabs.corn Page 1 WATER TECH LAB' S , Inc . 5 Pinewood Plaza Drive -P.O. Box 1056 Granite Falls, NC 28630 Phone(828) 396-4444 -Fax (828) 396-5761 CLIENT: Corning Cable Systems-TC Plt PHONE NUMBER: 828-327-5000 c/o Steve Street TYPE SAMPLE: Stormwater P.O Box 489 No. LOCATIONS: 2 Hickory, NC 28603-0489 SAMPLER NAME: Sample Collection Information TYPE CONTAINERS Sample Location DATE TIME TEMP.°C Grab/ No Plastic/ ANALYSIS REQUIRED Facility Name Composite Glass Discharge 003 Grab 3 Copper,Plastic/ j g / TSS, Oil & Gr., Lead, Co er, Zinc Discharge 005 Grab 3 Plastic/ TSS, Oil & Gr., Lead, Copper, Zinc 466 AlAli %,'/ Glass Relinquished By: Date: Time: R-414; By; Date: Time: /// 9' 9 37"Z/- Reli quished By: Date: Time: •eived By: ' Date: Time: PRESERVATION: tj-erfor4°C F []NaOH 3 (J Dechlornating Agent []Other SAMPLE TEMP. @ LAB (°C)a Chlorine Residual mg/I NC CERTIFIED LAB# 50 RAIN GAUGE RECORD SITE : Corning Optical Communications- HMTC MONTH : April 2020 STORM EVENT DATA DATE: 4/20/2020 START TIME: 1:01 AM End Time: 11 :o o AM TOTAL TIME: 9 hours and 59 minutes pH Meter Calibration- Date: 4/20/20 Time: 1:45 am Temperature: 72F pH Meter reading for 7.0 buffer solution: 7.00 pH Meter reading for 4.0 buffer solution: 4.01 Slope of the calibration: 98.5% Buffer expiration date: 2/2021 pH Measured at: Outfall 003: 6.61 Outfall 005: 6.56 DATE TIME RAINFALL (INCHES) MEASURED BY 14-Apr 23:59 0 Automated on-site rain gauge 15-Apr 23:59 0 Automated on-site rain gauge 16-Apr 23:59 0 Automated on-site rain gauge 17-Apr 23:59 0 Automated on-site rain gauge 18-Apr 23:59 _ 0 Automated on-site rain gauge 19-Apr 23:59 0 Automated on-site rain gauge 20-Apr 1:01 Flow Started Steve Street 20-Apr 11:00 0.82 Automated on-site rain gauge ATA NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form,please visit: http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 Permit No.: N/C/0/3/0/0/0/0/0/ or Certificate of Coverage No.: N/C/G/0/ 3 /0/2 /4/ 6/ Facility Name: Hickory Manufacturing and Technology Center-Corning Optical Communications County: Catawba Phone No.: 828-901-6695 Inspector: Steve Street Date of Inspection: 4/20/2020 Time of Inspection: 1:08 Total Event Precipitation(inches):.82" All permits require qualitative monitoring to be performed during a"measurable storm event." A"measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) ©2020 Corning Incorporated. All Rights Reserved. Page 1 of 2 SWU-242,Last modified 10/25/2012 1. Outfall Description: Outfall No. 001 Structure (pipe, ditch,etc.) Pipe Receiving Stream: Clark's Creek Describe the industrial activities that occur within the outfall drainage area: Reel storage,solid waste containers designated for landfill, roll-off container for scrap metal,hazardous waste storage, and R&D building. 2. Color: Describe the color of the discharge using basic colors (red,brown,blue,etc.) and tint (light, medium, dark) as descriptors: Color was clear. 3. Odor: Describe any distinct odors that the discharge may have (i.e.,smells strongly of oil, weak chlorine odor, etc.): No odor was present. 4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5 is very cloudy: Q1 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: None List and describe: SDO #1 is represented by SDO #3. Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. ©2020 Corning Incorporated. All Rights Reserved. Arrii.„A NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form,please visit: http://portal.ncdenr.ore/web/wq/ws/su/npdessw#tab-4 Permit No.: N/C/0/3/0/0/0/0/0/ or Certificate of Coverage No.: N/C/G/0/ 3 /0/2 /4/6 / Facility Name: Hickory Manufacturing and Technology Center-Corning Optical Communications County: Catawba Phone No.: 828-901-6695 Inspector: Steve Street Date of Inspection:4/20/2020 Time of Inspection: 1:04 Total Event Precipitation(inches):.82" All permits require qualitative monitoring to be performed during a"measurable storm event." A"measurable storm event"is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local DWQ Regional Office. By this sig re, I certi that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) ©2020 Corning Incorporated. All Rights Reserved. Page 1 of 2 SWU-242,Last modified 10/25/2012 1. Outfall Description: Outfall No. 002 Structure (pipe, ditch,etc.) Pipe Receiving Stream: Clark's Creek Describe the industrial activities that occur within the outfall drainage area: Chemical storage area (covered). 2. Color: Describe the color of the discharge using basic colors (red,brown,blue, etc.) and tint (light, medium, dark) as descriptors: Color was clear. 3. Odor: Describe any distinct odors that the discharge may have (i.e.,smells strongly of oil, weak chlorine odor,etc.): No odor was present. 4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5 is very cloudy: Q1 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: None List and describe: SDO#2 is represented by SDO #3. Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. ©2020 Corning Incorporated. All Rights Reserved. AT& NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form,please visit: http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 Permit No.: N/C/0/3/0/0/0/0/0/ or Certificate of Coverage No.: N/C/G/0/ 3 /0/2 /4/ 6/ Facility Name: Hickory Manufacturing and Technology Center-Corning Optical Communications County: Catawba Phone No.: 828-901-6695 Inspector: Steve Street Date of Inspection: 4/20/2020 Time of Inspection: 1:25 Total Event Precipitation (inches):.82" All permits require qualitative monitoring to be performed during a"measurable storm event." A"measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) ©2020 Corning Incorporated. All Rights Reserved. Page 1 of 2 SWU-242,Last modified 10/25/2012 1. Outfall Description: Outfall No. 003 Structure (pipe,ditch,etc.) Pipe Receiving Stream:Clark's Creek Describe the industrial activities that occur within the outfall drainage area: Reel storage.machine shop.and warehouse. 2. Color: Describe the color of the discharge using basic colors (red,brown,blue,etc.) and tint (light,medium, dark) as descriptors: Color was clear. 3. Odor: Describe any distinct odors that the discharge may have (i.e.,smells strongly of oil, weak chlorine odor,etc.): No odor was present. 4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5 is very cloudy: _ 1 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: None List and describe: Pollen was present as floating solid. Slight foaming generated by turbulence of discharge. Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. ©2020 Corning Incorporated. All Rights Reserved. AT& NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form,please visit: http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 Permit No.: IV/C/0/3/0/0/0/0/0/ or Certificate of Coverage No.: N/C/G/0/ 3 /0/2 /4/6/ Facility Name: Hickory Manufacturing and Technology Center-Corning Optical Communications County: Catawba Phone No.: 828-901-6695 Inspector: Gregg Cook Date of Inspection: 4/20/2020 Time of Inspection: 1:18 Total Event Precipitation(inches):.82" All permits require qualitative monitoring to be performed during a"measurable storm event." A"measurable storm event"is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) ©2020 Corning Incorporated. All Rights Reserved. Page 1 of 2 SWU-242,Last modified 10/25/2012 1. Outfall Description: Outfall No.005 Structure (pipe,ditch,etc.) Pipe Receiving Stream: Clark's Creek Describe the industrial activities that occur within the outfall drainage area: Manufacture of fiber optic cable and warehouse. 2. Color: Describe the color of the discharge using basic colors (red,brown,blue,etc.) and tint (light, medium,dark) as descriptors: Color was clear. 3. Odor: Describe any distinct odors that the discharge may have (i.e.,smells strongly of oil, weak chlorine odor,etc.): No odor was present. 4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5 is very cloudy: Q1 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: None List and describe: Pollen was the source of floating solids. Slight foaming caused by turbulence from the discharge. Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. ©2020 Corning Incorporated. All Rights Reserved.