Loading...
HomeMy WebLinkAboutNCC205860_NOI Application_20201222Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 12/16/2020 1:29:25 PM (NCG01 NOI Submission) Approve by Morman, Alaina 12/17/2020 3:46:59 PM (Review- Construction NOI 39289) • The task was assigned to Morman, Alaina by round robin distribution 12/16/2020 1:29 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: December 18, 2020 5:00 PM 12/16/2020 1:29 PM Submit by Selkane, Aziza 12/22/2020 9:36:52 AM (Payment Verification for NCC205860) * Joseph Barbee • Selkane, Aziza assigned the task to Selkane, Aziza 12/22/2020 9:36 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: January 28, 2021 5:00 PM 12/17/2020 3:47 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Line 75 MAOP Replacement 1 b. Specific Lot This field rray be used to list specifc lot nunbers. Numbers 1 c. Parcel ID List all Rios associated w ith this project. Number(s) (PIN) 6484-00-58-9577 6484-00-58-3338 6484-00-57-6767 6484-06-47-7770 6484-05-17-2992 6474-08-87-1753 6474-08-89-5117 6474-08-89-9084 6474-08-99-3346 6474-08-99-1052 2. County* Anson 3. Highway or Street N Green Street Address* Street name only is acceptable if no address nunber assigned yet 4. Cityor Township* Wadesboro 5. State * NC 6. Zip Code* 28170 7. Latitude* Enter the latitude in decinal degrees 34.9771 8. Longitude * Enter the longitude in decinal degrees (MJSTbe negative) -80.0729 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 01/05/2021 Estir ated Construction Project Start Date 10. Date to End * 03/29/2021 Estinated Construction Project End Cate 11. SIC (Primary)* Industrial (1541) Standard Industrial aassification for Developrnent 12. Acres to be 4.10 disturbed* (including off -site borrow and waste areas) 13. Total site area 4.10 (acres) * 14. Post- 1.00 construction (Estirrated) impervious area (acres) * NCC Project NCC-ANSON-2021-Line 75 MAOP Replacement Tracking ID Assignedautorraticaly Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Grindstone Branch Waterbody * %rre of waterbody into which story water runoff will discharge 15b. Waterbody 13-20-15-3 Index No.* NCWaterbody Index Nunber Stormwater r No discharges will flow pr Yes to additional wate rs * 15c. Additional Brush Fork Receiving Waterbody narre Waterbody 15d. Waterbody 13-42-1-3-1 Index No. NCWaterbody Index Nurrber 15e. Additional Derita Creek Receiving Waterbody narre Waterbody 15f. Waterbody 13-42-1-3-1-1 Index No. NCWaterbody Index Nunber 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * Duke Energy Carolinas, LLC IF pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Joseph If Corporation, enter Faegistered Agent First Wre 3. Last Name* Barbee IF Corporation, enter F;bgistered Agent Last %rre 3b. Title Project Manager 4. Permitee E-mail joseph.barbee@duke-energy.com Address* 5. Permittee 704-731-4403 Telephone No.* 6. Permittee Mailing Street Address Address* 4720 Piedmont Row Drive Address Line 2 City Charlotte Fbstal / Zip Code 28210-4269 Check box if the street address the same as mailing address 7. Permittee Street Address* V Yes Street Address 4720 Piedmont Row Drive Address Line 2 city Charlotte Fbstal / Zip Code 28210-4269 State / Frovince / Fbgion NC Country us State / Frovince / Faegion NC Country us 8. Type of Ownership is only individual if an individual is naned in B.1. above. Ownership* Non -Government C. Site Contact Information Part C. Project Site Contact Inforrration _.................................................................................................................................................................... 1. Primary Site Ted Contact - First Name * 2. Primary Site Cagle Contact - Last Name * 3. Title Distribution Project Specialist 4. Site Contact E- ted.cagle@duke-energy.com mail Address* 5. Site Contact 910-220-3268 Telephone No. 6. Organization Name 7. Site Contact Street Address Mailing Address* 185 Enterprise Drive Address Line 2 City State / Province / Region Rockingham NC Postal / Zip Code Country 28379 us 8. Consultant Name (Optional) Ryan Parker First and Last narre 9. Consultant E-mail rparker@kleinfelder.com This person will be copied on all correspondence. 10. Consultant 919-653-7057 Telephone No. 11. Billing E-mail (For Annual Fee correspondence) Default is legally responsible person e-n-ail (older NCAs rray not populate) 12. Billing (For Annual Fee correspondence) Telephone Default is legally responsible person telephone (older NOls rray not populate) D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 11/20/2020 Approved * 2. E&SC Plan Project ANSON-2021-003 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Fayetteville (FRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan NCDEQ Letter of Approval.pdf 845.09KB Approval letter or Mast beRDFformat Grading Permit 6. Site Location Map Mist be RDFformat (lint 20 NB) Line 75 MAOP Replacement —Site Location Map.pdf 1.06MB Rease do not upload entire set of E&SC plans. 7. Notes (Optional) Rovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification NCG01-eNO1-Certification-Form-20201210-DEMLR- Form 102.71 KB SW (Signed).pdf Mast be RDFformat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* IT The Legally Responsible Person named on this Notice of Intent f Authorized Responsible Person* (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Joseph Barbee Title Project Manager Organization Legally Responsible Entity Duke Energy Carolinas, LLC Date * 12/16/2020 F. Tracking and COC Info NOI Tracking No. 39289 NC Reference No. NCG01-2020-5860 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC205860 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 5860 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC205860-2020 Invoice Due Date 1/16/2021 Initial Fee $ 100.00 Invoice Status OPEN