Loading...
HomeMy WebLinkAboutNCC205828_ESC Approval Submitted_20201222ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH interim Director NORTH CAROLINA Environmental Quality May 10, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Penny Road Developers, LLC Attn: Harvey L. Montague, Registered Agent 10305 Penny Road. Raleigh, NC 27606 RE: Project Name: Quail Glen- Phase 4B Acres Approved: 15.5 Project ID: HARNE-2019-081 County: Harnett, City: Black River River Basin: Cape Fear Stream Classification: Other Submitted By: Enoch Engineers, P.A. Date Received by LQS: March 10, 2019 Plan Type: New Dear Mr. Montague: Address: SR 2215 This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this Letter ofApproval with Modifications. The Modifications Required for Approval are listed on the attached page. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Please be aware that your project will be covered by the enclosed NPDES Construction Stormwater General Permit NCG010000. Please become familiar with all the requirements and conditions of this permit in order to achieve compliance. Title 1 SA NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources ��,DEQ Fayetteville Regional Office 1225 Green Street. Suite 7141 Fayetteville, North Carolina 28301 910.433.3300 iwn orp, =n mea wmmmmu�ou.mr Letter of Approval Penny Road Developers, LLC May 10, 2019 Page 2 of 3 Title 15A NCAC 4B .01 18(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with theAct. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and the stormwater retention measures. (GS 113A-54.1(b)). You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. ;Sincer ly, Jodi Pace, EI Regional Engineering Associate Enclosures: Certificate of Approval NPDES Permit cc: Fleet Temple, Enoch Engineers, P.A. (electronic copy) Jay Sikes, Building Inspector (electronic copy) Ken Slattum, Building Inspector (electronic copy) DEMLR - Fayetteville Regional Office File Letter of Approval Penny Road Developers, LLC May 10, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Quail Glen- Phase 4B Project ID: HARNE-2019-081 County: Harnett Provide two full size copies each of revised plan sheets, showing all the Modifications required for approval, prior to beginning any land -disturbing activity. Per G.S. 113A-57(4), 15A NCAC 04B.0118 & G.S. 113A-54(d)(4)